Shane Muldoon Construction Inc.
- Based in
- Daly City
- On San Francisco permits
- Sep 2025 to Feb 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2026 | Completed final sign-off Jun 2026 | 3736 Broderick St | build 2x4 partition wall in bedroom on 2nd flr, with 4 new outlets. 2 on each side of wall. install door to new all, + infill door in best bedroom. no plumbing fixtures.Details
build 2x4 partition wall in bedroom on 2nd flr, with 4 new outlets. 2 on each side of wall. install door to new all, + infill door in best bedroom. no plumbing fixtures. | $5,000 |
| Jan 13, 2026 | Completed final sign-off Jun 2026 | 3736 Broderick St | replacement of extenuator fan in 1st fl bathroom, electrical upgrade, drywall patching. installation of hardwood flooring. repair of drywall patches of existing subfloor 2nd fl to comply w/ nov#202649193Details
replacement of extenuator fan in 1st fl bathroom, electrical upgrade, drywall patching. installation of hardwood flooring. repair of drywall patches of existing subfloor 2nd fl to comply w/ nov#202649193 | $40,000 |
| Sep 9, 2025 | Completed final sign-off Apr 2026 | 560 47th Av | interior remodel of (e) sfd 1st floor add (n) bedroom , bathroom, closet. (n) french door to rear yard. no work on 2nd floorDetails
interior remodel of (e) sfd 1st floor add (n) bedroom , bathroom, closet. (n) french door to rear yard. no work on 2nd floor | $50,000 |