Back to bathroom remodel contractors
Shane Muldoon Construction Inc.
- Based in
- Daly City
- On San Francisco permits
- Sep 2025 to Feb 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 6 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2026 | Completed final sign-off Jun 2026 | 3736 Broderick St | replacement of extenuator fan in 1st fl bathroom, electrical upgrade, drywall patching. installation of hardwood flooring. repair of drywall patches of existing subfloor 2nd fl to comply w/ nov#202649193Details
replacement of extenuator fan in 1st fl bathroom, electrical upgrade, drywall patching. installation of hardwood flooring. repair of drywall patches of existing subfloor 2nd fl to comply w/ nov#202649193 | $40,000 |
| Sep 9, 2025 | Completed final sign-off Apr 2026 | 560 47th Av | interior remodel of (e) sfd 1st floor add (n) bedroom , bathroom, closet. (n) french door to rear yard. no work on 2nd floorDetails
interior remodel of (e) sfd 1st floor add (n) bedroom , bathroom, closet. (n) french door to rear yard. no work on 2nd floor | $50,000 |