Deepak Patankar
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Evoco Architecture Interiors
- Based in
- So San Francisco
- On San Francisco permits
- Jul 2005 to Jan 2026
140 permits since 2000 (architect on 127 permits, engineer on 8 permits, authorized agent-others on 3 permits, designer on 2 permits): 109 completed, 4 in progress, 13 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 140.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 15, 2026 | In progress issued Mar 2026 | 8 Santa Ynez Av | Dreamsky Construction | remodel (e) kitchen and bathroom on level 2. replace 3 (e) windows. replace (e) front stair in kind. no change to floor area.Details
remodel (e) kitchen and bathroom on level 2. replace 3 (e) windows. replace (e) front stair in kind. no change to floor area. | $40,000 |
| Jan 15, 2026 | Completed final sign-off Mar 2026 | 58 Cameo Wy | M F Construction And Renovation Inc | replace 4 (e) windows along rear of buildilng. replace siding along rear on top level. no change to exterior along street. no interior work all work in kind and like for like. max. u-factor 0.27.Details
replace 4 (e) windows along rear of buildilng. replace siding along rear on top level. no change to exterior along street. no interior work all work in kind and like for like. max. u-factor 0.27. | $10,000 |
| Sep 18, 2025 | Completed final sign-off May 2026 | 35 Rico Wy | De Brus Construction Inc | revision to 202211287193, 1st fl new sauna, relocate furnace, 2nd fl remove wall between nook and kitchen. new stl beam, new simpson strong wallDetails
revision to 202211287193, 1st fl new sauna, relocate furnace, 2nd fl remove wall between nook and kitchen. new stl beam, new simpson strong wall | |
| Aug 13, 2025 | Completed final sign-off May 2026 | 58 Cameo Wy | M F Construction And Renovation Inc | addition of wall to enclose garage. modify handrail & tread at existing stair, addition of floor drain. no change to exterior or building area.Details
addition of wall to enclose garage. modify handrail & tread at existing stair, addition of floor drain. no change to exterior or building area. | $20,000 |
| Jun 2, 2025 | Completed final sign-off Aug 2026 | 1259 15th Av | The Sustainable Cbo Inc Dba Oliver Macki | change to rear door modification. all architectural and structural work under permit 202504154419 (shared plan)Details
change to rear door modification. all architectural and structural work under permit 202504154419 (shared plan) | $1,000 |
| Apr 15, 2025 | Completed final sign-off Aug 2026 | 1259 15th Av | The Sustainable Cbo Inc Dba Oliver Macki | level 2 - remodel kitchen, add powder room. level 3 - add bathroom, remodel bathroom. structrual work, new windows, doors. rear door modification under permit 202506027679 (shared plan)Details
level 2 - remodel kitchen, add powder room. level 3 - add bathroom, remodel bathroom. structrual work, new windows, doors. rear door modification under permit 202506027679 (shared plan) | $300,000 |
| Apr 15, 2025 | In progress issued Feb 2026 | 159 Castenada Av | The Sustainable Cbo Inc Dba Oliver Macki | modify existing side stair along side. no change to existing building floor plan. enlarge top landing and widen stair.Details
modify existing side stair along side. no change to existing building floor plan. enlarge top landing and widen stair. | $30,000 |
| Jan 30, 2025 | Completed final sign-off Feb 2026 | 14 Santa Ynez Av | Dreamsky Construction | revision 202406255185- structural revision. replace floor beam per plan. replace foundation at line a, new concrete pads.Details
revision 202406255185- structural revision. replace floor beam per plan. replace foundation at line a, new concrete pads. | $10,000 |
| Dec 6, 2024 | Completed final sign-off Oct 2025 | 2051 Balboa St | Cy Lo Builder | revision to existing permit 202410042324 to reduce work on existing restroomDetails
revision to existing permit 202410042324 to reduce work on existing restroom | |
| Dec 3, 2024 | In progress filed Dec 2024, not yet issued | 280 Casitas Av | new construction of a detached adu: type v-b, 1 story, 1 unit, 240sf.Details
new construction of a detached adu: type v-b, 1 story, 1 unit, 240sf. | $70,000 | |
| Oct 4, 2024 | Completed final sign-off Oct 2025 | 2051 Balboa St | Cy Lo Builder | ti of (e) fitness studioDetails
ti of (e) fitness studio | $50,000 |
| Jun 25, 2024 | Completed final sign-off Feb 2026 | 14 Santa Ynez Av | Dreamsky Construction | remodel of (e) upper level and lower level bathroom, modify (e) interior stairs by kitchen, addition of bathroom and primary bedroom to lower level.Details
remodel of (e) upper level and lower level bathroom, modify (e) interior stairs by kitchen, addition of bathroom and primary bedroom to lower level. | $90,000 |
| Feb 27, 2024 | Completed final sign-off Jan 2025 | 331 West Portal Av | Pio Mcgarr Inc | revision to pa# 202302011137. relocate ramp and eliminate walls. new lighting layout. new sinkDetails
revision to pa# 202302011137. relocate ramp and eliminate walls. new lighting layout. new sink | $20,000 |
| Feb 16, 2024 | Completed final sign-off Jun 2024 | 635 Waller St | H C L Construction Inc. | remodel existing bathroom and add a new bathroom and relocate washer/dryer on 2/fDetails
remodel existing bathroom and add a new bathroom and relocate washer/dryer on 2/f | $30,000 |
| Oct 3, 2023 | Completed final sign-off Dec 2024 | 595 Buckingham Wy | Rousseau Construction | ste 320. tenant improvement of existing dental office and adjacent space.Details
ste 320. tenant improvement of existing dental office and adjacent space. | $120,000 |
| Aug 29, 2023 | Completed final sign-off Aug 2026 | 850 Van Ness Av | Urban West Construction Inc | t.i. change from retail to office. 3 new restrooms, new door actuator for entry door, mep defered.Details
t.i. change from retail to office. 3 new restrooms, new door actuator for entry door, mep defered. | $50,000 |
| Aug 25, 2023 | Completed final sign-off May 2024 | 595 Buckingham Wy | Ayala's Color & Concepts***See Note*** | 4/f ste 444: tenant imrpovement of existing dental office, build new partitions, interior finish work, paint, & flr coverings, cabinetry, new plumb, new water and waste lines, vacuum and air lines, new electrical, lighting & power, new gyp board, & act ceiling. existing hvac system to remain.Details
4/f ste 444: tenant imrpovement of existing dental office, build new partitions, interior finish work, paint, & flr coverings, cabinetry, new plumb, new water and waste lines, vacuum and air lines, new electrical, lighting & power, new gyp board, & act ceiling. existing hvac system to remain. | $120,000 |
| Aug 1, 2023 | In progress issued Apr 2024 | 1665 Haight St | Occidental Express | addition of 2 new accessible suites with accessible bathrooms. addition of a new lula elevator to connect level 2 to the entry level. remodelings of all rooms.Details
addition of 2 new accessible suites with accessible bathrooms. addition of a new lula elevator to connect level 2 to the entry level. remodelings of all rooms. | $300,000 |
| May 19, 2023 | Completed final sign-off Jul 2023 | 155 05th St | Cobe Construction Inc | minor revision to pa #2022-0621-6664 to adjust mounting for four microscopes. revised structural drawingsDetails
minor revision to pa #2022-0621-6664 to adjust mounting for four microscopes. revised structural drawings | $4,000 |
| Mar 17, 2023 | Completed final sign-off Aug 2023 | 720 York St | Velox Construction Inc/Velox Des & Const | unit 115: revision to permit 202206216662 to accommodate penetration for mechanical ducts.Details
unit 115: revision to permit 202206216662 to accommodate penetration for mechanical ducts. | $5,000 |
| Feb 1, 2023 | Completed final sign-off Jan 2025 | 331 West Portal Av | Pio Mcgarr Inc | change of use from retail to club/community facility per planning code section 102. remove (e) nonload bearing walls, remodel of (e) restroom for accessibility & addition of ramp for wheelchair accessDetails
change of use from retail to club/community facility per planning code section 102. remove (e) nonload bearing walls, remodel of (e) restroom for accessibility & addition of ramp for wheelchair access | $20,000 |
| Nov 28, 2022 | Completed final sign-off May 2026 | 35 Rico Wy | De Brus Construction Inc | project includes structural and seismic upgrade. 1st fl: addition of 147 sf, guest mud play rm, relocate powder, furnace, water heater, bath, new windows 2nd fl: relocate kitchen, bdrms, baths, remodel dining, laundry, new deck, family rm, new windows. 3rd flr additionDetails
project includes structural and seismic upgrade. 1st fl: addition of 147 sf, guest mud play rm, relocate powder, furnace, water heater, bath, new windows 2nd fl: relocate kitchen, bdrms, baths, remodel dining, laundry, new deck, family rm, new windows. 3rd flr addition | $615,000 |
| Nov 8, 2022 | Completed final sign-off Jul 2023 | 3532 20th St | Mmm General Contractor | commercial space @ ground floor: partial remodel of (e) dental office. new chairs added at existing storage area.Details
commercial space @ ground floor: partial remodel of (e) dental office. new chairs added at existing storage area. | $130,000 |
| Nov 2, 2022 | Never finaled filed Nov 2022, never issued | 2037 Scott St | increase bedroom 2 size by 47 sq ft by expanding into existing light well. new addition is against dead wall at property line.Details
increase bedroom 2 size by 47 sq ft by expanding into existing light well. new addition is against dead wall at property line. | $50,000 | |
| Aug 30, 2022 | Completed final sign-off May 2023 | 392 Princeton St | Dreamsky Construction | remodel an existing kitchen , bathroom on upper levelDetails
remodel an existing kitchen , bathroom on upper level | $80,000 |
| Aug 30, 2022 | Completed final sign-off Dec 2023 | 333 West Portal Av | Pio Mcgarr Inc | unit a: remodel of (e) kitchen and bathrm and addition of new bathrm on level 2.Details
unit a: remodel of (e) kitchen and bathrm and addition of new bathrm on level 2. | $110,000 |
| Aug 2, 2022 | Completed final sign-off Feb 2023 | 300 Brannan St | Wells Construction Inc | tenant improvement for new vetrinary clinic. new electrical, plumbing, walls, finsihes, ductingDetails
tenant improvement for new vetrinary clinic. new electrical, plumbing, walls, finsihes, ducting | $250,000 |
| Aug 2, 2022 | Completed final sign-off Aug 2023 | 720 York St | Velox Construction Inc/Velox Des & Const | title 24 mechanicali and electrical compliance for t.i. pa202206216662. maher n/a.Details
title 24 mechanicali and electrical compliance for t.i. pa202206216662. maher n/a. | |
| Jun 21, 2022 | Completed final sign-off Aug 2023 | 720 York St | Velox Construction Inc/Velox Des & Const | suite #115 -ti of existing office, wall extenisionsDetails
suite #115 -ti of existing office, wall extenisions | $80,000 |
| Jun 21, 2022 | Completed final sign-off Jul 2023 | 155 05th St | Cobe Construction Inc | 2nd flr: installation of new microscopes and monitors on ceiling.Details
2nd flr: installation of new microscopes and monitors on ceiling. | $10,000 |
| Apr 27, 2022 | Never finaled filed Apr 2022, never issued | 654 28th St | to demolish a 2-story, type 5b, single family building per sb-9.Details
to demolish a 2-story, type 5b, single family building per sb-9. | $25,000 | |
| Apr 27, 2022 | Never finaled filed Apr 2022, never issued | 654 28th St | to erect a 3-story, type 5b, two residential unit building per sb-9.Details
to erect a 3-story, type 5b, two residential unit building per sb-9. | $750,000 | |
| Apr 18, 2022 | Completed final sign-off Aug 2022 | 2801 Folsom St | Velic Construction Inc | ste 203: addition of new accessible restroom.Details
ste 203: addition of new accessible restroom. | $30,000 |
| Apr 5, 2022 | Completed final sign-off Feb 2023 | 2827 Franklin St | Westridge Builders, Inc. | interior remodel of existing dental office. new ada restroom.Details
interior remodel of existing dental office. new ada restroom. | $110,000 |
| Mar 22, 2022 | Expired or cancelled cancelled Jan 2026 | 1319 20th Av | soft demo of (e) non load bearing walls, partitions and fixtures for upcoming tenant improvement project per ab-017Details
soft demo of (e) non load bearing walls, partitions and fixtures for upcoming tenant improvement project per ab-017 | $7,000 | |
| Mar 1, 2022 | Completed final sign-off Sep 2022 | 81 Mercedes Wy | Brendan Lalor Construction | revision to pa# 201908290201. to show bathroom being remodeled on the basement level.Details
revision to pa# 201908290201. to show bathroom being remodeled on the basement level. | $20,000 |
| Jan 10, 2022 | Completed final sign-off Dec 2022 | 3633 Mission St | Barron Construction Inc. | all work on lower level of house: coversion to accommmodate a new bedroom, full bath & wet bar. relocate (e) laundry.Details
all work on lower level of house: coversion to accommmodate a new bedroom, full bath & wet bar. relocate (e) laundry. | $65,000 |
| Nov 12, 2021 | Completed final sign-off Dec 2021 | 159 Castenada Av | The Sustainable Cbo Inc Dba Oliver Macki | revision to permit #2021/0316/6586 for updated energy calculations.Details
revision to permit #2021/0316/6586 for updated energy calculations. | |
| Oct 18, 2021 | Expired or cancelled withdrawn Sep 2023 | 850 Van Ness Av | t.i. of (e) space to accomondate office fro the non-profit including restrooms, new plumbing & electrical & ceilings.Details
t.i. of (e) space to accomondate office fro the non-profit including restrooms, new plumbing & electrical & ceilings. | $150,000 | |
| Oct 18, 2021 | Completed final sign-off Dec 2021 | 4 Joost Av | Westridge Builders, Inc. | revision to 202010287657 to add power door operator in lieu of level landingDetails
revision to 202010287657 to add power door operator in lieu of level landing | |
| Aug 16, 2021 | Never finaled issued May 2022, no final | 620 Teresita Bl | conversion of unauthorized dwelling unit to a new accessory dwelling unit. the existing covered patio will be enclosed to become part of the adu.Details
conversion of unauthorized dwelling unit to a new accessory dwelling unit. the existing covered patio will be enclosed to become part of the adu. | $90,000 | |
| Jul 28, 2021 | Completed final sign-off Jul 2023 | 2037 Scott St | Fog Horn Builders Inc | remodel (e) one bathroom (bath#2) on level 2 of home. replace (e) windows including (3) at front w/alum-clad wood windows (casement). create small laundry room. no work for master bedroom bathroom.Details
remodel (e) one bathroom (bath#2) on level 2 of home. replace (e) windows including (3) at front w/alum-clad wood windows (casement). create small laundry room. no work for master bedroom bathroom. | $20,000 |
| Jul 1, 2021 | Expired or cancelled cancelled Jan 2026 | 2801 Folsom St | modify (e) layout for new dental office, add 2 wheel chair accessible restrooms. deferred mechanical & electrical review.Details
modify (e) layout for new dental office, add 2 wheel chair accessible restrooms. deferred mechanical & electrical review. | $120,000 | |
| Apr 8, 2021 | Expired or cancelled withdrawn Jun 2023 | 650 28th St | erect new 3-story type v single family residence w/ aduDetails
erect new 3-story type v single family residence w/ adu | $800,000 | |
| Apr 8, 2021 | Expired or cancelled withdrawn Jun 2023 | 650 28th St | demolish existing 1-story single family residenceDetails
demolish existing 1-story single family residence | $15,000 | |
| Apr 8, 2021 | Expired or cancelled withdrawn Apr 2022 | 654 28th St | erect new 3-story type v single family residence w/ aduDetails
erect new 3-story type v single family residence w/ adu | $800,000 | |
| Apr 8, 2021 | Expired or cancelled withdrawn Apr 2022 | 654 28th St | demolish existing 2-story single family residenceDetails
demolish existing 2-story single family residence | $15,000 | |
| Apr 1, 2021 | Completed final sign-off Dec 2021 | 4 Joost Av | Westridge Builders, Inc. | revision to pa 202010287657. new structural work to support removed load bearing walls and posts.Details
revision to pa 202010287657. new structural work to support removed load bearing walls and posts. | $18,000 |
| Mar 16, 2021 | Completed final sign-off Dec 2021 | 159 Castenada Av | The Sustainable Cbo Inc Dba Oliver Macki | addition of exercise room & home office on lower level of (e) house within building envelope.Details
addition of exercise room & home office on lower level of (e) house within building envelope. | $40,000 |
| Mar 4, 2021 | Completed final sign-off Apr 2022 | 2801 Folsom St | Barber Construction | #201: interior t.i. of extg 1684 st office for a dental office. new mechanical room and closet downstairs.Details
#201: interior t.i. of extg 1684 st office for a dental office. new mechanical room and closet downstairs. | $170,000 |
| Jan 22, 2021 | Never finaled issued Feb 2021, no final | 2801 Folsom St | Barber Construction | exploratory demo to gauge structure/hvac needs for suite #201 remove ceiling/grid. ab-017.Details
exploratory demo to gauge structure/hvac needs for suite #201 remove ceiling/grid. ab-017. | $1,000 |
| Dec 28, 2020 | Never finaled filed Dec 2020, never issued | 620 Teresita Bl | new bedroom and laundry room on lower level and enclose area under upper level sunroom and full bath.Details
new bedroom and laundry room on lower level and enclose area under upper level sunroom and full bath. | $110,000 | |
| Nov 10, 2020 | Completed final sign-off Oct 2023 | 595 Buckingham Wy | Pallari Construction General Contracting | unit #532: new partition walls, outlets, & modify lighting & hvac to work w/ revised layout. addition of one operators by taking away staff area.Details
unit #532: new partition walls, outlets, & modify lighting & hvac to work w/ revised layout. addition of one operators by taking away staff area. | $10,000 |
| Nov 10, 2020 | Expired or cancelled cancelled Jan 2026 | 565 Buckingham Wy | unit 555: new partition walls, outlets, lighting and interior finishes, for imaging area for existing office.Details
unit 555: new partition walls, outlets, lighting and interior finishes, for imaging area for existing office. | $15,000 | |
| Oct 28, 2020 | Completed final sign-off Dec 2021 | 4 Joost Av | Westridge Builders, Inc. | new dental office t.i. (n) partition walls, interior finishes, electrical & plumbing work. no oshpd-3, no hazardous materials to be stored at the facility. sprinkler deferred.Details
new dental office t.i. (n) partition walls, interior finishes, electrical & plumbing work. no oshpd-3, no hazardous materials to be stored at the facility. sprinkler deferred. | $120,000 |
| Oct 23, 2020 | Completed final sign-off Sep 2022 | 2107 44th Av | lower level: relocate kitchen from upper level, new full bathroom, upper level bathroom remodel. remove wall between dining & living. structural work required.Details
lower level: relocate kitchen from upper level, new full bathroom, upper level bathroom remodel. remove wall between dining & living. structural work required. | $160,000 | |
| Oct 21, 2020 | Completed final sign-off Feb 2022 | 1795 35th Av | Fog Horn Builders Inc | to comply with nov 2020051831 & 201902351: fire damage repair: new exterior stucco along s/s of structure, replace studs and joist at south half of g/f. rmeodel bath & kitchen.Details
to comply with nov 2020051831 & 201902351: fire damage repair: new exterior stucco along s/s of structure, replace studs and joist at south half of g/f. rmeodel bath & kitchen. | $180,000 |
| Sep 25, 2020 | Expired or cancelled withdrawn Jul 2021 | 844 York St | voluntary seismic retrofit of (e) building.Details
voluntary seismic retrofit of (e) building. | $10,000 | |
| Sep 24, 2020 | Completed final sign-off Feb 2021 | 1611 Washington St | Maguire Construction | remodel unit 2: kitchen & bathroom & convert (e) storage room to bedroom.Details
remodel unit 2: kitchen & bathroom & convert (e) storage room to bedroom. | $30,000 |
| Feb 10, 2020 | Completed final sign-off Dec 2021 | 69 Piedmont St | Kyvos Construction Inc | kitchen remodel, bathroom relocation on level 2 and remodel of extg bathroom on level 3, removal of side deck and steps on exterior. replace extg windows at bathtoom and bedroom on level 1Details
kitchen remodel, bathroom relocation on level 2 and remodel of extg bathroom on level 3, removal of side deck and steps on exterior. replace extg windows at bathtoom and bedroom on level 1 | $180,000 |
| Jan 24, 2020 | Expired or cancelled withdrawn Dec 2020 | 2418 18th Av | add one bedroom, one full bath, remodel extg kitchen, bathroom, powder room and living/dining area on level 2. 16 sq ft addition on level 2Details
add one bedroom, one full bath, remodel extg kitchen, bathroom, powder room and living/dining area on level 2. 16 sq ft addition on level 2 | $100,000 | |
| Oct 16, 2019 | Completed final sign-off Apr 2022 | 1218 York St | new 2 bedrooms with common bathroom, kitchen and laundry room in lower level. all work is within the extg lower level footprint. adding lower level kitchen/laundry & 2 beds as second unit.Details
new 2 bedrooms with common bathroom, kitchen and laundry room in lower level. all work is within the extg lower level footprint. adding lower level kitchen/laundry & 2 beds as second unit. | $70,000 | |
| Oct 2, 2019 | Never finaled issued Dec 2019, no final | 1617 Washington St | Maguire Construction | revision to app#201904057253 for structural work. modification of earlier design. n/a for maher.Details
revision to app#201904057253 for structural work. modification of earlier design. n/a for maher. | |
| Aug 29, 2019 | Completed final sign-off Jun 2020 | 1791 Washington St | dental office t.i. new interior walls, plumbing and electrical work. no hazardous material. not oshpd-3Details
dental office t.i. new interior walls, plumbing and electrical work. no hazardous material. not oshpd-3 | $120,000 | |
| Aug 29, 2019 | Completed final sign-off Sep 2022 | 81 Mercedes Wy | Brendan Lalor Construction | level 1: additon of 158 sq ft, remodel kitchen & relocate power room. new deck along rear,new door & windows. level 2: relocate laundry, new deck above addition area, new doors ondto deck.Details
level 1: additon of 158 sq ft, remodel kitchen & relocate power room. new deck along rear,new door & windows. level 2: relocate laundry, new deck above addition area, new doors ondto deck. | $70,000 |
| Aug 29, 2019 | Completed final sign-off Oct 2021 | 2310 26th Av | Pro Com Home Services California Inc, Ka - Bi Construction Inc. | lower level: master bedroom with full bath and family room. upper level: remodel kitchen, demo wall between living, dining and kitchen. build 2 level addition at extg lightwell facing blind wall of neighbor.Details
lower level: master bedroom with full bath and family room. upper level: remodel kitchen, demo wall between living, dining and kitchen. build 2 level addition at extg lightwell facing blind wall of neighbor. | $120,000 |
| Aug 6, 2019 | Expired or cancelled withdrawn Sep 2019 | 1611 Washington St | new roof deck with access limited to penthouse-1617 unit #3. new interior staircase leading via penthouse to new roof deck. maher n/aDetails
new roof deck with access limited to penthouse-1617 unit #3. new interior staircase leading via penthouse to new roof deck. maher n/a | $30,000 | |
| Aug 6, 2019 | Completed final sign-off Oct 2020 | 270 Prospect Av | Prosper Construction Dev Inc. | level2: add bedroom by reducing size of living room, eliminate extg powder room to add full bath, remodel extg kitchen and full bath. no work on level 1Details
level2: add bedroom by reducing size of living room, eliminate extg powder room to add full bath, remodel extg kitchen and full bath. no work on level 1 | $70,001 |
| Aug 5, 2019 | Completed final sign-off Oct 2021 | 3910 24th St | Crestwood Contractors Inc | complete 2nd level remodel, reconfigure rooms, kitchen and bath remodelsDetails
complete 2nd level remodel, reconfigure rooms, kitchen and bath remodels | $50,000 |
| Jun 6, 2019 | Completed final sign-off Dec 2021 | 148 Brussels St | Thomas Le Construction Inc | horizontal addition on both levels in rear of property. lower level: (n) family room, guest bedroom & full bath. upper level: (n) master bedroom w/ full master bath, relocate kitchen, laundry roomDetails
horizontal addition on both levels in rear of property. lower level: (n) family room, guest bedroom & full bath. upper level: (n) master bedroom w/ full master bath, relocate kitchen, laundry room | $200,000 |
| Apr 12, 2019 | Completed final sign-off Oct 2021 | 54 Colby St | Wesco Construction | new master bedroom on lower level, remodel e bath, upper level remodel e bath and kitchenDetails
new master bedroom on lower level, remodel e bath, upper level remodel e bath and kitchen | $100,000 |
| Apr 5, 2019 | Completed final sign-off Feb 2021 | 1617 Washington St | Maguire Construction | foundation work and structural strengthening of roof framing. n/a for maher.Details
foundation work and structural strengthening of roof framing. n/a for maher. | $60,000 |
| Dec 26, 2018 | Completed final sign-off Oct 2021 | 3910 24th St | D O T Construction, Crestwood Contractors Inc | ti new spa spac in (e) vacant commercial space ref 201804247153Details
ti new spa spac in (e) vacant commercial space ref 201804247153 | $180,000 |
| Jul 24, 2018 | Completed final sign-off May 2019 | 237 09th Av | Professional Home Designs | revision to 201711204424 remove posts supporting rear exterior bay add 2 window at the 2nd flr rear at great room. partially replace slab at ground flr. structural revisions based on these alterationsDetails
revision to 201711204424 remove posts supporting rear exterior bay add 2 window at the 2nd flr rear at great room. partially replace slab at ground flr. structural revisions based on these alterations | $13,000 |
| May 31, 2018 | Completed final sign-off Aug 2019 | 1196 Valencia St | Alb Design And Construction | g/f: new dental office in a newly constructed vacant suite.Details
g/f: new dental office in a newly constructed vacant suite. | $80,000 |
| May 17, 2018 | Completed final sign-off Nov 2022 | 1014 Goettingen St | Lytama Construction | convert storage to new bedroom, full bath and a closet, add new insulation to walls & roof of the houseDetails
convert storage to new bedroom, full bath and a closet, add new insulation to walls & roof of the house | $20,000 |
| May 10, 2018 | Completed final sign-off Apr 2019 | 2512 25th Av | Jim Fergus Construction | remodel (e) bathroom on level 2Details
remodel (e) bathroom on level 2 | $15,000 |
| Mar 15, 2018 | Completed final sign-off May 2019 | 142 Newton St | Barron Construction Inc. | remodel extg lower level to accomodate 2 bedrooms, laundry room, and 1 full bath.Details
remodel extg lower level to accomodate 2 bedrooms, laundry room, and 1 full bath. | $55,000 |
| Mar 2, 2018 | Completed final sign-off Feb 2021 | 1611 Washington St | Maguire Construction | 1611 unit-1, 1617 unit-1, 1617 unit-2: remodel (e) bathrooms and kitchens 1617 unit-3: add 2 bedrooms and 2 full bathrooms, remodel (e) bath, relocate kitchen and add new laundry areaDetails
1611 unit-1, 1617 unit-1, 1617 unit-2: remodel (e) bathrooms and kitchens 1617 unit-3: add 2 bedrooms and 2 full bathrooms, remodel (e) bath, relocate kitchen and add new laundry area | $120,000 |
| Nov 29, 2017 | Completed final sign-off May 2018 | 787 43rd Av | Barron Construction Inc. | remodel (e) kitchen & bathroom, open up walls in dining room. remove (e) exterior stairs in lightwell. infill (e) door connected to lightwell access.Details
remodel (e) kitchen & bathroom, open up walls in dining room. remove (e) exterior stairs in lightwell. infill (e) door connected to lightwell access. | $20,000 |
| Nov 20, 2017 | Completed final sign-off May 2019 | 237 09th Av | Professional Home Designs | addition of master bath, powder room, playroom to level 1 and expansion of existing great room besides kitchen levelDetails
addition of master bath, powder room, playroom to level 1 and expansion of existing great room besides kitchen level | $80,000 |
| Oct 10, 2017 | Completed final sign-off Aug 2018 | 254 05th St | All Phase Contractors Inc/All Phase Buil | dental office ti on ground floor. new partition walls, new paint, new cabinets, new water & waste lines, vac, new lighting & power plan, new hvac layout new ceiling tilesDetails
dental office ti on ground floor. new partition walls, new paint, new cabinets, new water & waste lines, vac, new lighting & power plan, new hvac layout new ceiling tiles | $110,000 |
| Sep 6, 2017 | Completed final sign-off May 2018 | 25 San Jacinto Wy | M F Construction And Renovation Inc | replace (2) existing sliding doors & 1 (e) window. new rear patio on grade. replace (1) existing window with a sliding door.all work on lower level only. all exterior windows to be replaced with custom wood windows. paint finish to match existing exterior paint to match existing.Details
replace (2) existing sliding doors & 1 (e) window. new rear patio on grade. replace (1) existing window with a sliding door.all work on lower level only. all exterior windows to be replaced with custom wood windows. paint finish to match existing exterior paint to match existing. | $8,000 |
| Aug 22, 2017 | Completed final sign-off Sep 2017 | 110 Pinehurst Wy | enclosing water heater and sheetrock walls at garageDetails
enclosing water heater and sheetrock walls at garage | $7,000 | |
| Jun 27, 2017 | Completed final sign-off May 2018 | 25 San Jacinto Wy | M F Construction And Renovation Inc | remodel of extg kitchen, powder room on lower level and remodel of 2 bathrooms on upper level. no exterior work as part of this permit.Details
remodel of extg kitchen, powder room on lower level and remodel of 2 bathrooms on upper level. no exterior work as part of this permit. | $50,000 |
| Jun 15, 2017 | Completed final sign-off Aug 2017 | 728 Broadway | Doyle Developments | modification of approach ramp to retail space, move entry door further in, create level landing for accessibility, additional work to pa#201405226473.Details
modification of approach ramp to retail space, move entry door further in, create level landing for accessibility, additional work to pa#201405226473. | |
| Apr 25, 2017 | Completed final sign-off Aug 2018 | 526 34th Av | add a laundry closet on 3rd level and replace surface of existing roof deck on 4th level. new doors and replace siding on top levelDetails
add a laundry closet on 3rd level and replace surface of existing roof deck on 4th level. new doors and replace siding on top level | $8,000 | |
| Mar 14, 2017 | Completed final sign-off Dec 2017 | 490 Post St | Blue Northern Builders Inc | #412 - office tenant improvement including new electrical, plumbing, walls. n/a maher ordinanceDetails
#412 - office tenant improvement including new electrical, plumbing, walls. n/a maher ordinance | $65,000 |
| Feb 24, 2017 | Completed final sign-off Jun 2017 | 78 Midcrest Wy | (1) kitchen and (1) bath remodelDetails
(1) kitchen and (1) bath remodel | $40,000 | |
| Feb 22, 2017 | Completed final sign-off Feb 2018 | 2177 18th Av | Jim Fergus Construction | demo extg non bearing walls internal for future remodel, and remove finishes at kitchen and bedrooms. kitchen and bath remodel in upper level, and new family room & stairs on lower level.Details
demo extg non bearing walls internal for future remodel, and remove finishes at kitchen and bedrooms. kitchen and bath remodel in upper level, and new family room & stairs on lower level. | $145,000 |
| Jan 24, 2017 | Completed final sign-off Jan 2018 | 449 Gates St | The Sustainable Cbo Inc Dba Oliver Macki | remodel of existing house - add a new bath, relocate kitchen, new water heater.Details
remodel of existing house - add a new bath, relocate kitchen, new water heater. | $60,000 |
| Dec 30, 2016 | Completed final sign-off Feb 2018 | 1001 Portola Dr | Dliu Construction | conversion of existing garage to create 2 additoinal bedrooms downstairs. side yard for bedroom egress on 1st levelDetails
conversion of existing garage to create 2 additoinal bedrooms downstairs. side yard for bedroom egress on 1st level | $40,000 |
| Dec 2, 2016 | Completed final sign-off Aug 2017 | 728 Broadway | Doyle Developments | submit title 24 plans & calculation for title 24 energy compliance. ref. permit 201405226473Details
submit title 24 plans & calculation for title 24 energy compliance. ref. permit 201405226473 | |
| Nov 1, 2016 | Completed final sign-off Aug 2017 | 230 Bella Vista Wy | Fog Horn Builders Inc | remodel kitchen and dining room on level 2Details
remodel kitchen and dining room on level 2 | $20,000 |
| Jul 29, 2016 | Completed final sign-off Jan 2017 | 1636 16th Av | Hammerhouse Construction | revision to pa 2016-0505-6617, increased size of bathroom & added a new walk in closetDetails
revision to pa 2016-0505-6617, increased size of bathroom & added a new walk in closet | $6,000 |
| Jun 20, 2016 | Completed final sign-off Apr 2017 | 2172 Mission St | new storefront along mission street. change of use under pa 2016-0426-5677 maher naDetails
new storefront along mission street. change of use under pa 2016-0426-5677 maher na | $5,000 | |
| May 5, 2016 | Completed final sign-off Dec 2016 | 1636 16th Av | Hammerhouse Construction | new full bathroom and masterbedroom downstair. rework (e) interior staircase to downstairs. add door seperating bedroom & garageDetails
new full bathroom and masterbedroom downstair. rework (e) interior staircase to downstairs. add door seperating bedroom & garage | $30,000 |
| Apr 26, 2016 | Completed final sign-off Apr 2017 | 2172 Mission St | Lcy Contruciton Inc | new ti space & new mezzanine for dental office from vacant retail. maher naDetails
new ti space & new mezzanine for dental office from vacant retail. maher na | $160,000 |
| Mar 24, 2016 | Completed final sign-off Jan 2017 | 2037 Scott St | Fog Horn Builders Inc | connect (e) lower level rooms to upper level with a new internal staircase. new bathroom w/sink & tub, family room downstairs opening (as a door) to rear yard. 2nd floor - convert study room to bedroom. maher na.Details
connect (e) lower level rooms to upper level with a new internal staircase. new bathroom w/sink & tub, family room downstairs opening (as a door) to rear yard. 2nd floor - convert study room to bedroom. maher na. | $50,000 |
| Feb 8, 2016 | Completed final sign-off Jul 2016 | 814 Detroit St | Mutual Seiko Construction | add 2 bedrooms & bath & laundry on lower level & remodel bath on upper level, partial remodel kitchen, seismic upgrade lower level.Details
add 2 bedrooms & bath & laundry on lower level & remodel bath on upper level, partial remodel kitchen, seismic upgrade lower level. | $150,000 |