Ka - Bi Construction Inc.
- Based in
- Burlingame
- On San Francisco permits
- Jul 2011 to Aug 2026
- Last 24 months
- 12 permits filed
40 permits since 2000: 24 completed, 13 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2026 | In progress issued Aug 2026 | 167 11th Av | revision to pa# 202604280228: remove (e) kitchen counter and install new one (12ft long) laundry room remodeling; remove (e) cabinets, countertops and sink and install like for like. install new air handler with condenser outside both units. all work is in both units.Details
revision to pa# 202604280228: remove (e) kitchen counter and install new one (12ft long) laundry room remodeling; remove (e) cabinets, countertops and sink and install like for like. install new air handler with condenser outside both units. all work is in both units. | $24,000 |
| Jul 20, 2026 | In progress issued Jul 2026 | 1059 Leavenworth St | unit 18 and 19: 2 kitchen and 1 bathroom remodel, like for like, fire damage remodels. unit 19 kitchen & bathroom. unit 18 remodeling kitchen.Details
unit 18 and 19: 2 kitchen and 1 bathroom remodel, like for like, fire damage remodels. unit 19 kitchen & bathroom. unit 18 remodeling kitchen. | $80,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 601 Van Ness Av | unit#750: like to like kitchen & bathroom remodeling, switch bathtub to shower pan.Details
unit#750: like to like kitchen & bathroom remodeling, switch bathtub to shower pan. | $65,000 |
| Jun 9, 2026 | In progress filed Jun 2026, not yet issued | 741 Tehama St | revision to permit 202509084781 (ref. 202303284563). rear stairs alteration. direction and design of rear stairs changed. remove the elevator work from scope.Details
revision to permit 202509084781 (ref. 202303284563). rear stairs alteration. direction and design of rear stairs changed. remove the elevator work from scope. | $12,000 |
| Apr 28, 2026 | In progress issued Apr 2026 | 167 11th Av | both units. same scope. partial drywall work in the bathroom. some insulation. remove & replace like for like toilt fixture (bowl) wall toilet. remove & replace 6' long kitchen counter top. some cabinets.Details
both units. same scope. partial drywall work in the bathroom. some insulation. remove & replace like for like toilt fixture (bowl) wall toilet. remove & replace 6' long kitchen counter top. some cabinets. | $7,000 |
| Apr 28, 2026 | In progress issued Apr 2026 | 169 11th Av | addressing permit only: purpose of this permit is to link 169 11th ave to apn 1371/014.Details
addressing permit only: purpose of this permit is to link 169 11th ave to apn 1371/014. | |
| Apr 10, 2026 | In progress issued Jul 2026 | 1059 Leavenworth St | units 18 and 19 4/fl- scope for fire damage repair to include interior finishes, roof, hallway and electrical work. all work will be like for like, as needed. no work is visible from street.Details
units 18 and 19 4/fl- scope for fire damage repair to include interior finishes, roof, hallway and electrical work. all work will be like for like, as needed. no work is visible from street. | $100,000 |
| Oct 2, 2025 | In progress issued Oct 2025 | 1059 Leavenworth St | remove and repalce (e) main electrical panel with (n) . remove and replace 2 broken sewer line pipe in a light well with around connection. remove and replace dry rot siding and install drywall behind electrical panel all in common area.Details
remove and repalce (e) main electrical panel with (n) . remove and replace 2 broken sewer line pipe in a light well with around connection. remove and replace dry rot siding and install drywall behind electrical panel all in common area. | $18,000 |
| Oct 2, 2025 | In progress issued Oct 2025 | 1549 California St | unit a- kithcen and bathroom remodel like for likeDetails
unit a- kithcen and bathroom remodel like for like | $45,000 |
| Sep 8, 2025 | In progress issued Sep 2025 | 741 Tehama St | revision to pa 202303284563 remove rear interior stairs from kitchen to 1st fl; replace rear interior stairs from kitchen to mezzanine; reconfigure interior front entry stairs in foyer (not visible from street); install an elevator; ground fl bathrm & laundry layout change. no fixture changesDetails
revision to pa 202303284563 remove rear interior stairs from kitchen to 1st fl; replace rear interior stairs from kitchen to mezzanine; reconfigure interior front entry stairs in foyer (not visible from street); install an elevator; ground fl bathrm & laundry layout change. no fixture changes | $30,000 |
| Sep 5, 2025 | In progress issued Sep 2025 | 1549 California St | unit #b: like to like kitchen and bathroom remodeling.Details
unit #b: like to like kitchen and bathroom remodeling. | $47,800 |
| Nov 19, 2024 | In progress issued Nov 2024 | 488 Anderson St | to obtain final inspection for work approved under pa# 2019-0227-3965 and 2021-0421-9062. all work is complete.Details
to obtain final inspection for work approved under pa# 2019-0227-3965 and 2021-0421-9062. all work is complete. | |
| Jan 9, 2024 | Completed final sign-off Jan 2024 | 159 Bonview St | to document as-constructed partition layout for final. reference permit# 201806192232, 202003056257, and 202306019024.Details
to document as-constructed partition layout for final. reference permit# 201806192232, 202003056257, and 202306019024. | |
| Jun 2, 2023 | Completed final sign-off Nov 2023 | 157 Bonview St | rev pa# 201806192232 for 159 bonview & in coordination w/ 157 bonview easement in pa# 201810042285, field discovered conditions, repair & remove extg crumbling & deteriorating exterior stair wall, provide new reinforced concrete wall per structural drawings 202305318898Details
rev pa# 201806192232 for 159 bonview & in coordination w/ 157 bonview easement in pa# 201810042285, field discovered conditions, repair & remove extg crumbling & deteriorating exterior stair wall, provide new reinforced concrete wall per structural drawings 202305318898 | |
| Jun 1, 2023 | Completed final sign-off Jan 2024 | 159 Bonview St | to obtain final inspection for work approved under pa # 201806192232.Details
to obtain final inspection for work approved under pa # 201806192232. | |
| May 31, 2023 | Completed final sign-off Nov 2023 | 159 Bonview St | rev pa# 201806192232 for 159 bonview & in coordination w/ 157 bonview easement in pa# 204810042285, field discovered conditions, repair & remove extg crumbing & deteriorating exterior stair wall, provide new reinforced concrete wall per structural drawings.Details
rev pa# 201806192232 for 159 bonview & in coordination w/ 157 bonview easement in pa# 204810042285, field discovered conditions, repair & remove extg crumbing & deteriorating exterior stair wall, provide new reinforced concrete wall per structural drawings. | $500 |
| Apr 3, 2023 | Completed final sign-off Apr 2023 | 1059 Leavenworth St | revision to existing pa# 202212098036 and 202206277179 to remove laundry room work from both permits.Details
revision to existing pa# 202212098036 and 202206277179 to remove laundry room work from both permits. | |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 741 Tehama St | remodel kitchen, remodel 2 full bathrooms, add 1 full bathroom on 1st flr, install heat pump hvac systems on both lvls, remodel laundry & mechanical rm on 1st flr.Details
remodel kitchen, remodel 2 full bathrooms, add 1 full bathroom on 1st flr, install heat pump hvac systems on both lvls, remodel laundry & mechanical rm on 1st flr. | $95,000 |
| Mar 8, 2023 | Completed final sign-off Nov 2023 | 1059 Leavenworth St | like for like kitchen remodel for unit 9 and 17 including replacing stove/hood ventilationDetails
like for like kitchen remodel for unit 9 and 17 including replacing stove/hood ventilation | $5,000 |
| Dec 9, 2022 | Completed final sign-off Apr 2023 | 1059 Leavenworth St | to comply with # 202058084, 202287702 including items #2-5: bring laundry up to code and remodel in kind. repair window (in lightwell - not visible from street).Details
to comply with # 202058084, 202287702 including items #2-5: bring laundry up to code and remodel in kind. repair window (in lightwell - not visible from street). | $4,000 |
| Aug 29, 2022 | Completed final sign-off Apr 2023 | 10 Santa Barbara Av | repair/replace retaining wall at rear of property in kind to comply with 202294386Details
repair/replace retaining wall at rear of property in kind to comply with 202294386 | $2,000 |
| Jul 21, 2022 | Completed final sign-off Apr 2023 | 10 Santa Barbara Av | replace siding around sides and back of house. replaced mixed material siding with hardie backer (sides and back). repair dry rot in kind (20 sf). replace front facade siding to match previous horizontal wood shiplap siding.Details
replace siding around sides and back of house. replaced mixed material siding with hardie backer (sides and back). repair dry rot in kind (20 sf). replace front facade siding to match previous horizontal wood shiplap siding. | $8,000 |
| Jul 26, 2021 | Completed final sign-off Nov 2023 | 10 Santa Barbara Av | to comply with bid nov 202179235 and eid complaint 202179647. remodel kitchen and bathrooms, replace windows, and mep as required. voluntary strengthening.Details
to comply with bid nov 202179235 and eid complaint 202179647. remodel kitchen and bathrooms, replace windows, and mep as required. voluntary strengthening. | $72,000 |
| Feb 22, 2021 | Completed final sign-off Mar 2021 | 316 San Jose Av | provide proper fire resistant separation for gro fl stoarage room & at the garage avove the water heater furnace area. provide gypsum cover for exposed frame at the ceilings. repair all holes, untreated joints, unsealed penetrations missing sections. including passageways. provide proper ventilationDetails
provide proper fire resistant separation for gro fl stoarage room & at the garage avove the water heater furnace area. provide gypsum cover for exposed frame at the ceilings. repair all holes, untreated joints, unsealed penetrations missing sections. including passageways. provide proper ventilation | $4,000 |
| Mar 12, 2020 | Completed final sign-off Sep 2021 | 155 Curtis St | obtain final inspection for work approved under pa #2017-0828-6083. all work is completeDetails
obtain final inspection for work approved under pa #2017-0828-6083. all work is complete | |
| Mar 5, 2020 | Completed final sign-off Jan 2024 | 159 Bonview St | ref app#201806192232 & #201812148377. 1st flr: relocate 3 shear walls per plan layout. 1st, 2nd fl: remove water damaged section of p/l wall, replace in situ w/nw fire rated wall. attic: prov. new gwb enclosed raised vault cieling, new per hatch, ladder. roof replace in situ. rev struct. accordinglyDetails
ref app#201806192232 & #201812148377. 1st flr: relocate 3 shear walls per plan layout. 1st, 2nd fl: remove water damaged section of p/l wall, replace in situ w/nw fire rated wall. attic: prov. new gwb enclosed raised vault cieling, new per hatch, ladder. roof replace in situ. rev struct. accordingly | $7,800 |
| Oct 11, 2019 | Completed final sign-off Nov 2023 | 10 Santa Barbara Av | voluntary foundation repairDetails
voluntary foundation repair | $15,000 |
| Oct 11, 2019 | Never finaled issued Jul 2023, no final | 10 Santa Barbara Av | legalize unpermited 1st floor dwelling unit per ordinance 43-14; add new rear yard access stair for upper unitDetails
legalize unpermited 1st floor dwelling unit per ordinance 43-14; add new rear yard access stair for upper unit | $8,720 |
| Aug 29, 2019 | Completed final sign-off Oct 2021 | 2310 26th Av | lower level: master bedroom with full bath and family room. upper level: remodel kitchen, demo wall between living, dining and kitchen. build 2 level addition at extg lightwell facing blind wall of neighbor.Details
lower level: master bedroom with full bath and family room. upper level: remodel kitchen, demo wall between living, dining and kitchen. build 2 level addition at extg lightwell facing blind wall of neighbor. | $120,000 |
| May 1, 2019 | In progress issued Mar 2024 | 488 Anderson St | 3rd fl addition-approx 462 sq ft.Details
3rd fl addition-approx 462 sq ft. | $50,000 |
| Dec 14, 2018 | Completed final sign-off Jan 2024 | 159 Bonview St | facade renovationDetails
facade renovation | $18,000 |
| Aug 2, 2018 | Completed final sign-off Jan 2024 | 159 Bonview St | interior alteration excavate garage basement approx 199 cubic yard at about 9' in depthDetails
interior alteration excavate garage basement approx 199 cubic yard at about 9' in depth | $250,000 |
| Aug 28, 2017 | Expired or cancelled expired Sep 2021 | 155 Curtis St | like to like kitchen & bathroom remodel, add family room & bathroom in g/f. like to like window replacement-fiberglass to street.Details
like to like kitchen & bathroom remodel, add family room & bathroom in g/f. like to like window replacement-fiberglass to street. | $42,000 |
| Mar 7, 2016 | Completed final sign-off Aug 2018 | 666 Madrid St | to comply with n.o.v #200682015 #200877593,#200884232, construct retaining walls in bsement to strenghten (e) concorete footing/retaining walls. construct rear addtiion: complete interior remodel. relocate gas meter & upgrade electrical panel.Details
to comply with n.o.v #200682015 #200877593,#200884232, construct retaining walls in bsement to strenghten (e) concorete footing/retaining walls. construct rear addtiion: complete interior remodel. relocate gas meter & upgrade electrical panel. | $100,000 |
| Apr 8, 2013 | Completed final sign-off May 2013 | 2662 45th Av | like for like kitchen cabinetes and appliance replaced, like for like bathroom fixtures, replacing (tub, sink,toilet), new tile around the shower and bath floor. new linmoleum on kitchen floor. 4 each recessed lights on the kitchen ceiling.Details
like for like kitchen cabinetes and appliance replaced, like for like bathroom fixtures, replacing (tub, sink,toilet), new tile around the shower and bath floor. new linmoleum on kitchen floor. 4 each recessed lights on the kitchen ceiling. | $22,500 |
| Oct 25, 2012 | Completed final sign-off Nov 2012 | 2662 45th Av | dry rot repair around and below the front windows, repair in kind.Details
dry rot repair around and below the front windows, repair in kind. | $4,800 |
| Aug 27, 2012 | Completed final sign-off Jan 2013 | 1059 Leavenworth St | #20- bathroom & kitchen in kind remodeling, shower replacement on the bathroom, vanity and toilet will be replaced, new tile on the bathroom floor and around shower. remove and replace existing kitchen cabinets, counter, sink & faucet. new refrigerator, tile flooring in the kitchen.Details
#20- bathroom & kitchen in kind remodeling, shower replacement on the bathroom, vanity and toilet will be replaced, new tile on the bathroom floor and around shower. remove and replace existing kitchen cabinets, counter, sink & faucet. new refrigerator, tile flooring in the kitchen. | $13,600 |
| Jun 18, 2012 | Completed final sign-off Feb 2013 | 1059 Leavenworth St | 24 window sash replacement. size be seen/single hung wood windows. to comply with complaint 201294713. to match other (e) wood windows.Details
24 window sash replacement. size be seen/single hung wood windows. to comply with complaint 201294713. to match other (e) wood windows. | $23,000 |
| Nov 7, 2011 | Completed final sign-off Nov 2011 | 1569 Sloat Bl | revision to pa# 2011-0721-0710-showing (e) passage in copy/fax room & (e) entry door. change unit number from #330 to #300.Details
revision to pa# 2011-0721-0710-showing (e) passage in copy/fax room & (e) entry door. change unit number from #330 to #300. | $500 |
| Jul 21, 2011 | Completed final sign-off Nov 2011 | 1569 Sloat Bl | office ti on the 2nd floor incl. demo of interior non struc- walls & other bldg system components, new partition walls.Details
office ti on the 2nd floor incl. demo of interior non struc- walls & other bldg system components, new partition walls. | $25,000 |