Back to bathroom remodel contractors
Ka - Bi Construction Inc.
- Based in
- Burlingame
- On San Francisco permits
- Jul 2011 to Aug 2026
- Last 24 months
- 12 permits filed
40 permits since 2000: 24 completed, 13 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
11 bathroom remodel permits: 4 completed, 5 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 424 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Jul 2026 | 1059 Leavenworth St | unit 18 and 19: 2 kitchen and 1 bathroom remodel, like for like, fire damage remodels. unit 19 kitchen & bathroom. unit 18 remodeling kitchen.Details
unit 18 and 19: 2 kitchen and 1 bathroom remodel, like for like, fire damage remodels. unit 19 kitchen & bathroom. unit 18 remodeling kitchen. | $80,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 601 Van Ness Av | unit#750: like to like kitchen & bathroom remodeling, switch bathtub to shower pan.Details
unit#750: like to like kitchen & bathroom remodeling, switch bathtub to shower pan. | $65,000 |
| Apr 28, 2026 | In progress issued Apr 2026 | 167 11th Av | both units. same scope. partial drywall work in the bathroom. some insulation. remove & replace like for like toilt fixture (bowl) wall toilet. remove & replace 6' long kitchen counter top. some cabinets.Details
both units. same scope. partial drywall work in the bathroom. some insulation. remove & replace like for like toilt fixture (bowl) wall toilet. remove & replace 6' long kitchen counter top. some cabinets. | $7,000 |
| Oct 2, 2025 | In progress issued Oct 2025 | 1549 California St | unit a- kithcen and bathroom remodel like for likeDetails
unit a- kithcen and bathroom remodel like for like | $45,000 |
| Sep 5, 2025 | In progress issued Sep 2025 | 1549 California St | unit #b: like to like kitchen and bathroom remodeling.Details
unit #b: like to like kitchen and bathroom remodeling. | $47,800 |
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 741 Tehama St | remodel kitchen, remodel 2 full bathrooms, add 1 full bathroom on 1st flr, install heat pump hvac systems on both lvls, remodel laundry & mechanical rm on 1st flr.Details
remodel kitchen, remodel 2 full bathrooms, add 1 full bathroom on 1st flr, install heat pump hvac systems on both lvls, remodel laundry & mechanical rm on 1st flr. | $95,000 |
| Jul 26, 2021 | Completed final sign-off Nov 2023 | 10 Santa Barbara Av | to comply with bid nov 202179235 and eid complaint 202179647. remodel kitchen and bathrooms, replace windows, and mep as required. voluntary strengthening.Details
to comply with bid nov 202179235 and eid complaint 202179647. remodel kitchen and bathrooms, replace windows, and mep as required. voluntary strengthening. | $72,000 |
| Aug 29, 2019 | Completed final sign-off Oct 2021 | 2310 26th Av | lower level: master bedroom with full bath and family room. upper level: remodel kitchen, demo wall between living, dining and kitchen. build 2 level addition at extg lightwell facing blind wall of neighbor.Details
lower level: master bedroom with full bath and family room. upper level: remodel kitchen, demo wall between living, dining and kitchen. build 2 level addition at extg lightwell facing blind wall of neighbor. | $120,000 |
| Aug 28, 2017 | Expired or cancelled expired Sep 2021 | 155 Curtis St | like to like kitchen & bathroom remodel, add family room & bathroom in g/f. like to like window replacement-fiberglass to street.Details
like to like kitchen & bathroom remodel, add family room & bathroom in g/f. like to like window replacement-fiberglass to street. | $42,000 |
| Apr 8, 2013 | Completed final sign-off May 2013 | 2662 45th Av | like for like kitchen cabinetes and appliance replaced, like for like bathroom fixtures, replacing (tub, sink,toilet), new tile around the shower and bath floor. new linmoleum on kitchen floor. 4 each recessed lights on the kitchen ceiling.Details
like for like kitchen cabinetes and appliance replaced, like for like bathroom fixtures, replacing (tub, sink,toilet), new tile around the shower and bath floor. new linmoleum on kitchen floor. 4 each recessed lights on the kitchen ceiling. | $22,500 |
| Aug 27, 2012 | Completed final sign-off Jan 2013 | 1059 Leavenworth St | #20- bathroom & kitchen in kind remodeling, shower replacement on the bathroom, vanity and toilet will be replaced, new tile on the bathroom floor and around shower. remove and replace existing kitchen cabinets, counter, sink & faucet. new refrigerator, tile flooring in the kitchen.Details
#20- bathroom & kitchen in kind remodeling, shower replacement on the bathroom, vanity and toilet will be replaced, new tile on the bathroom floor and around shower. remove and replace existing kitchen cabinets, counter, sink & faucet. new refrigerator, tile flooring in the kitchen. | $13,600 |