Block 0147, lot 001
1355 Stockton St
- City’s use
- Commercial Hotel
- Built
- 1907
- Stories
- 3
- Units
- 3
- Rooms
- 6 bathrooms
- Building
- 12,309 sq ft
- Lot
- 4,503 sq ft
- Zoning
- NBEACH
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
33 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 30, 2021 | Never finaled issued Oct 2021, no final | 1355 Stockton St | George Line Construction | rev to pa202009083730: mep package - title 24 compliance for g/f commercial only.Details
rev to pa202009083730: mep package - title 24 compliance for g/f commercial only. | |
| May 5, 2021 | Completed final sign-off Jun 2021 | 1355 Stockton St | Aura Fire Safety Inc | install fire sprinkler monitoring system per nfpa 72. refer to fire sprinkler plans approved. fire alarm wiring, pull stations, smoke detectors, fire sprinkler # 2020-0223-5400. riser include 2 butterfly, flow switch, exterior bellDetails
install fire sprinkler monitoring system per nfpa 72. refer to fire sprinkler plans approved. fire alarm wiring, pull stations, smoke detectors, fire sprinkler # 2020-0223-5400. riser include 2 butterfly, flow switch, exterior bell | $9,600 |
| Apr 5, 2021 | Completed final sign-off Nov 2021 | 1355 Stockton St | Ningzhi Hu Signs Company | install electric single faced wall sign: "metropolitan bank"Details
install electric single faced wall sign: "metropolitan bank" | $1,000 |
| Jan 26, 2021 | Completed final sign-off Feb 2021 | 1355 Stockton St | George Line Construction | new structural slab for vault and new concrete vault walls. ref pa 202009083730 drawings are for vault shown on plans originally. these are additional documents for the vault design.Details
new structural slab for vault and new concrete vault walls. ref pa 202009083730 drawings are for vault shown on plans originally. these are additional documents for the vault design. | $15,000 |
| Dec 7, 2020 | Never finaled filed Dec 2020, never issued | 1355 Stockton St | Luminous Fire Alarm | sprinkler monitoring per nfpa 72. | $6,800 |
| Sep 8, 2020 | Never finaled issued Dec 2020, no final | 1355 Stockton St | George Line Construction | t.i. for new financial services in (e) space, new partition walls & drop ceiling, break roomDetails
t.i. for new financial services in (e) space, new partition walls & drop ceiling, break room | $47,245 |
| Jun 8, 2020 | Never finaled issued Jun 2020, no final | 1355 Stockton St | street space | ||
| Feb 25, 2020 | Completed final sign-off Jun 2021 | 1355 Stockton St | Aura Fire Safety Inc | gr fl only 29 heads, nfpa 13 and 2" dedicated fire lineDetails
gr fl only 29 heads, nfpa 13 and 2" dedicated fire line | $48,850 |
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 1355 Stockton St | street space/mta meters | ||
| Nov 18, 2019 | Completed final sign-off Dec 2019 | 1355 Stockton St | revision to pa #201712126287. relocate steel moment frame and revised details.Details
revision to pa #201712126287. relocate steel moment frame and revised details. | ||
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 1355 Stockton St | street space w/mta | ||
| Jul 26, 2019 | Never finaled issued Jul 2019, no final | 1355 Stockton St | street space w/mta | ||
| May 10, 2019 | Completed final sign-off Feb 2020 | 1355 Stockton St | Bai Construction | add 2 baths, add new walls and infill new floor inthe 1st floor.Details
add 2 baths, add new walls and infill new floor inthe 1st floor. | $120,000 |
| Apr 16, 2019 | Completed final sign-off Dec 2019 | 1355 Stockton St | Bai Construction | rev to pa# 201712126287: relocate steel moment frames and shear wallsDetails
rev to pa# 201712126287: relocate steel moment frames and shear walls | |
| Mar 22, 2019 | Never finaled issued Mar 2019, no final | 1355 Stockton St | street space | ||
| Dec 12, 2017 | Completed final sign-off Dec 2019 | 1355 Stockton St | Bai Construction | residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
residential: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $80,000 |
| Dec 12, 2017 | Completed final sign-off Dec 2019 | 1355 Stockton St | Bai Construction | commercial: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
commercial: soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $40,000 |
| Aug 11, 2015 | Never finaled filed Aug 2015, never issued | 705 Vallejo St | remodel a common shower room, no walls moved, removed or added, all fixture layouts to remain unchanged.Details
remodel a common shower room, no walls moved, removed or added, all fixture layouts to remain unchanged. | $5,000 | |
| Mar 13, 2015 | Expired or cancelled cancelled Jun 2015 | 705 Vallejo St | Hawk N Lee Co | interior remodeling: remove grd fl meter, patch all walls & finishes, install 2 each electrical meter & services for restaurant & hotel on ground floor. remove finishes walls in hallway to install subpanel on 2nd and 3rd fl hall way. adding hard-wired smoke/co detectors to each roomDetails
interior remodeling: remove grd fl meter, patch all walls & finishes, install 2 each electrical meter & services for restaurant & hotel on ground floor. remove finishes walls in hallway to install subpanel on 2nd and 3rd fl hall way. adding hard-wired smoke/co detectors to each room | $15,000 |
| Aug 29, 2008 | Never finaled issued Aug 2008, no final | 1365 Stockton St | street space permit. | ||
| Jul 30, 2008 | Never finaled issued Jul 2008, no final | 1365 Stockton St | street space permit | ||
| Jul 22, 2008 | Never finaled issued Jul 2008, no final | 1365 Stockton St | street space permit only. | ||
| Jun 20, 2008 | Completed final sign-off Oct 2008 | 1365 Stockton St | Z Construction Company Inc | ground floor: non-structural tenant improvement including demo construction of interior non-structural partitions, interior fixtures, finishes, equipment & one d.a. restroom.Details
ground floor: non-structural tenant improvement including demo construction of interior non-structural partitions, interior fixtures, finishes, equipment & one d.a. restroom. | $40,000 |
| Apr 1, 2008 | Never finaled issued Apr 2008, no final | 705 Vallejo St | street space. | ||
| Sep 22, 2006 | Never finaled issued Sep 2006, no final | 1355 Stockton St | street space permit | ||
| Jun 7, 2006 | Completed final sign-off Feb 2007 | 1355 Stockton St | Next Venture Inc Dba Sierra Group | remodel extg bank branch. replace storefront. add 1 processing room.Details
remodel extg bank branch. replace storefront. add 1 processing room. | $104,494 |
| Oct 12, 2005 | Expired or cancelled cancelled May 2008 | 1355 Stockton St | Tom's Construction | commercial type awning mounted at the store front. covered w/ canvas fabric with business name.Details
commercial type awning mounted at the store front. covered w/ canvas fabric with business name. | $2,000 |
| Oct 12, 2005 | Expired or cancelled cancelled May 2008 | 1355 Stockton St | Tom's Construction | erect sign | $2,000 |
| Oct 14, 2004 | Completed final sign-off Oct 2004 | 705 Vallejo St | Fire Protection Retrofit Specialist | renew app #200303149763Details
renew app #200303149763 | |
| Sep 16, 2004 | Never finaled issued Sep 2004, no final | 705 Vallejo St | Bay Alarm Company | scope of work is to install 1 duct to momitor 1 (e) facu monitoring required due to the recentDetails
scope of work is to install 1 duct to momitor 1 (e) facu monitoring required due to the recent | $798 |
| Feb 5, 2004 | Expired or cancelled expired Jan 2009 | 705 Vallejo St | Fire Protection Retrofit Specialist | to install fire sprinkler system to comply w/ord#170-02 (1st fl only) commercial area only.Details
to install fire sprinkler system to comply w/ord#170-02 (1st fl only) commercial area only. | $3,300 |
| Oct 10, 2003 | Never finaled issued Oct 2003, no final | 705 Vallejo St | coluntary ada compliance | $9,300 | |
| Mar 14, 2003 | Expired or cancelled expired Mar 2004 | 705 Vallejo St | Fire Protection Retrofit Specialist | install fire sprinkler system to comply with ordinance #170-02Details
install fire sprinkler system to comply with ordinance #170-02 | $24,700 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bai Construction (4), Fire Protection Retrofit Specialist (3), George Line Construction (3), Aura Fire Safety Inc (2), Tom's Construction (2), Bay Alarm Company, Hawk N Lee Co, Luminous Fire Alarm, Next Venture Inc Dba Sierra Group, Ningzhi Hu Signs Company, Z Construction Company Inc
- Architects
- Frank Ho (2), Ahmad Mohazab
- Engineers
- Darren Wong (4), Esmail Nader Rastegari, Michael Sullaway, Ramil Batiancila
- Authorized agents
- Yifeng Yu
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.