Leif Glomset
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Richard Pollack & Assoc.
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Feb 2017
91 permits since 2000 (architect on 89 permits, authorized agent-others on 3 permits, engineer on 2 permits): 85 completed, 1 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 7, 2017 | Completed final sign-off Aug 2017 | 703 Market St | Skyline Construction | mechanical, electrical, plumbing for ti on the 2nd fl. ref bpa#201612144891Details
mechanical, electrical, plumbing for ti on the 2nd fl. ref bpa#201612144891 | $75,000 |
| Feb 7, 2017 | Completed final sign-off Aug 2017 | 703 Market St | Skyline Construction | mechanical, electrical, plumbing for ti on the 3rd fl. ref bpa#201612144886.Details
mechanical, electrical, plumbing for ti on the 3rd fl. ref bpa#201612144886. | $75,000 |
| Jun 30, 2014 | Completed final sign-off Apr 2015 | 153 Kearny St | Dome Construction Corp | t.i. of (e) office space including: limited new partitions, casings, lighting,finishes,electrical. no structural. life safety and sprinklers - under separate permit. n/a for the maher ordinance #155-13Details
t.i. of (e) office space including: limited new partitions, casings, lighting,finishes,electrical. no structural. life safety and sprinklers - under separate permit. n/a for the maher ordinance #155-13 | $20,000 |
| Jun 30, 2014 | Completed final sign-off Apr 2016 | 600 California St | Skyline Construction | 10th flr : t.i. to demo & construct new non-structural partitions, doors, finishes & millwork. mep, sprinkler and l/s on separate permit.Details
10th flr : t.i. to demo & construct new non-structural partitions, doors, finishes & millwork. mep, sprinkler and l/s on separate permit. | $350,000 |
| Jun 16, 2014 | Completed final sign-off Aug 2014 | 595 Market St | Gci, Inc | #2500- mechanical & electrical work for tenant improvement. ref. ti 201405064976.Details
#2500- mechanical & electrical work for tenant improvement. ref. ti 201405064976. | $52,000 |
| Jan 9, 2014 | Completed final sign-off Jun 2014 | 155 05th St | Sc Builders, Inc | 7th floor ti, interior remodel mep anfd life safety (fa and sprinklers) shall be submitted under separate permits. compliance with ordinance #155-13 not required. excavation <50 cu.yd.Details
7th floor ti, interior remodel mep anfd life safety (fa and sprinklers) shall be submitted under separate permits. compliance with ordinance #155-13 not required. excavation <50 cu.yd. | $2,000,000 |
| Jan 9, 2014 | Completed final sign-off Sep 2014 | 155 05th St | Sc Builders, Inc | 6th floor tenant improvement, interior office remodel including construcito n of non-rated partitions & interior finishes, mechaical, electrical, plumbing, sprinkler & fire alarm under separate permit. compliance with ordinance #155-13 not required. excavation <50 cu.yd.Details
6th floor tenant improvement, interior office remodel including construcito n of non-rated partitions & interior finishes, mechaical, electrical, plumbing, sprinkler & fire alarm under separate permit. compliance with ordinance #155-13 not required. excavation <50 cu.yd. | $2,000,000 |
| Dec 13, 2013 | Completed final sign-off Jul 2014 | 77 Geary St | Principal Builders Inc. | 5th and 6th floors:structural installation of communicating stair between 5th and 6th floor in ti space. sprinkler/life safety under separate permit, stairs design build.Details
5th and 6th floors:structural installation of communicating stair between 5th and 6th floor in ti space. sprinkler/life safety under separate permit, stairs design build. | $125,000 |
| Dec 3, 2013 | Completed final sign-off May 2014 | 595 Market St | Gci, Inc | 19th floor interior tenant improvement including demolition, new partitions, plumbing, & related finishes. no structural work to be performed.Details
19th floor interior tenant improvement including demolition, new partitions, plumbing, & related finishes. no structural work to be performed. | $80,000 |
| Dec 3, 2013 | Completed final sign-off Apr 2014 | 595 Market St | Gci, Inc | 18th floor interior tenant improvement including demolition, new partitions, plumbing, & related finishes. no structural work to be performed.Details
18th floor interior tenant improvement including demolition, new partitions, plumbing, & related finishes. no structural work to be performed. | $80,000 |
| Jul 17, 2013 | Expired or cancelled cancelled Jan 2026 | 1 Market St | Hathaway Dinwiddie Co. | new millwork, flooring, fire rated partition in elevator lobby, mep under seperate permit.Details
new millwork, flooring, fire rated partition in elevator lobby, mep under seperate permit. | $115,000 |
| Jun 19, 2013 | Completed final sign-off Sep 2013 | 1 Market St | Hathaway Dinwiddie Co. | 5th floor:new partitions, ceiling tile, carpet, lighting. mep under seperate permit, fire sprinkler under separate permitDetails
5th floor:new partitions, ceiling tile, carpet, lighting. mep under seperate permit, fire sprinkler under separate permit | $400,000 |
| Dec 18, 2012 | Completed final sign-off Aug 2016 | 650 07th St | Swinerton Builders | 1st floor -mechanical t.i. ( fire alarm & sprinklers under separate permit.), architectural t.i. under pa #2012.1016.2159. plan includes electrical t.i.Details
1st floor -mechanical t.i. ( fire alarm & sprinklers under separate permit.), architectural t.i. under pa #2012.1016.2159. plan includes electrical t.i. | |
| Dec 12, 2012 | Completed final sign-off Aug 2016 | 650 07th St | Swinerton Builders | basement - mechanical ti. ref. ti#2012-1016-2156. fire alarm & sprinklers under separate permit.Details
basement - mechanical ti. ref. ti#2012-1016-2156. fire alarm & sprinklers under separate permit. | |
| Oct 16, 2012 | Completed final sign-off Aug 2016 | 650 07th St | Swinerton Builders | tenant improvement on 1st fl consisting of new partitions, glazing, doors, telcom, av structural support framing for non load bearing partitions. mep, sprinklers, fire alarm on seperate permit.Details
tenant improvement on 1st fl consisting of new partitions, glazing, doors, telcom, av structural support framing for non load bearing partitions. mep, sprinklers, fire alarm on seperate permit. | $797,531 |
| Oct 16, 2012 | Completed final sign-off Apr 2014 | 650 07th St | Swinerton Builders | tenant improvement 3rd floor consisting new partitions, glazing, door, millwork, strucurtal framing for non load bearing partitions. mep, sprinklers, fire alarm under separate permitDetails
tenant improvement 3rd floor consisting new partitions, glazing, door, millwork, strucurtal framing for non load bearing partitions. mep, sprinklers, fire alarm under separate permit | $911,374 |
| Oct 16, 2012 | Completed final sign-off Apr 2014 | 650 07th St | Swinerton Builders | tenant improvement on 2nd fl consisting of new partitions, glazing, doors, millwork. mep, sprinkler, fire alarm on sep permitDetails
tenant improvement on 2nd fl consisting of new partitions, glazing, doors, millwork. mep, sprinkler, fire alarm on sep permit | $829,402 |
| Oct 12, 2012 | Completed final sign-off May 2014 | 650 07th St | Swinerton Builders | new communication stair between floors 1,2,3. new opening in structural wood floor deck for communicating stairsDetails
new communication stair between floors 1,2,3. new opening in structural wood floor deck for communicating stairs | $515,075 |
| Apr 25, 2012 | Completed final sign-off Feb 2013 | 600 Montgomery St | Hathaway Dinwiddie Co. | 11th floor-t/i to (e) office space including new lighting, finishes, partitions, ceiling work and non structural demo.Details
11th floor-t/i to (e) office space including new lighting, finishes, partitions, ceiling work and non structural demo. | $250,000 |
| Apr 9, 2012 | Completed final sign-off Aug 2012 | 123 Mission St | Gci, Inc | interior uprades of restrooms including partitions, fixtures, ceilings, lights, finishes to full code compliance. mep design build under separate permit including title 24Details
interior uprades of restrooms including partitions, fixtures, ceilings, lights, finishes to full code compliance. mep design build under separate permit including title 24 | $50,000 |
| Dec 28, 2011 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | interior upgrade of restrooms including new and relocated accessories, mechanical, electrical, and plumbing work to be under separate permitDetails
interior upgrade of restrooms including new and relocated accessories, mechanical, electrical, and plumbing work to be under separate permit | $50,000 | |
| Oct 26, 2011 | Completed final sign-off Mar 2012 | 600 Montgomery St | Hathaway Dinwiddie Co. | tenant improvement of e office space including changing 4 office fronts from gyp board to frameless glass, relocation of doors and frames, finishes, relocation of elec outlets. mep (including title 24) under separate permit.Details
tenant improvement of e office space including changing 4 office fronts from gyp board to frameless glass, relocation of doors and frames, finishes, relocation of elec outlets. mep (including title 24) under separate permit. | $79,543 |
| Aug 10, 2011 | Completed final sign-off Feb 2013 | 1 Market St | Hathaway Dinwiddie Co. | 9th floor architectural tenant improvement build-out including new partitions, millwork, & finishes. mechanical, electrical, life safety & fire sprinkler under separate permit. comply with ab 060 for it roomsDetails
9th floor architectural tenant improvement build-out including new partitions, millwork, & finishes. mechanical, electrical, life safety & fire sprinkler under separate permit. comply with ab 060 for it rooms | $1,500,000 |
| Aug 10, 2011 | Completed final sign-off Feb 2013 | 1 Market St | Hathaway Dinwiddie Co. | 3rd floor architectural tenant improvement build-out including new partitions, millwork, & finishes. mechanical, electrical, life safety & fire sprinkler under separate permit.Details
3rd floor architectural tenant improvement build-out including new partitions, millwork, & finishes. mechanical, electrical, life safety & fire sprinkler under separate permit. | $500,000 |
| Mar 16, 2011 | Completed final sign-off Nov 2012 | 123 Mission St | Gci, Inc | floor 14 t.i. of existing office including new partitions, ceiling, lighting, finishes electrical & hvac.Details
floor 14 t.i. of existing office including new partitions, ceiling, lighting, finishes electrical & hvac. | $1,000,000 |
| Dec 2, 2010 | Completed final sign-off Dec 2011 | 595 Market St | Richlen Construction | 10th floor construction of restroom upgrade to bring to code compliance includes new toilet partitions, toilet relocation & accessory relocation. mep under separate permit. barrier removalDetails
10th floor construction of restroom upgrade to bring to code compliance includes new toilet partitions, toilet relocation & accessory relocation. mep under separate permit. barrier removal | $10,000 |
| Dec 2, 2010 | Completed final sign-off Dec 2011 | 595 Market St | Richlen Construction | 7th floor construction of restroom upgrade to bring to code compliance includes new toilet partitions, toilet relocation & accessory relocation. mep under separate permit. barrier removalDetails
7th floor construction of restroom upgrade to bring to code compliance includes new toilet partitions, toilet relocation & accessory relocation. mep under separate permit. barrier removal | $10,000 |
| Oct 29, 2010 | Completed final sign-off Feb 2011 | 101 California St | Source Planning And Construction Inc | floor 18, suite 1800 - new tenant improvement of (e) office space including new prtitions, ceiling, lighting, finishes & electrical. no structural work to be performed.Details
floor 18, suite 1800 - new tenant improvement of (e) office space including new prtitions, ceiling, lighting, finishes & electrical. no structural work to be performed. | $829,640 |
| Jul 29, 2010 | Completed final sign-off Dec 2010 | 123 Mission St | Bcci Construction Company | 20th floor tenant improvement of (e) office space including new partitoin, ceiling, lighting, finishes, electrical & hvac. no exterior or structural work, ls & sprinklers under separate permit.Details
20th floor tenant improvement of (e) office space including new partitoin, ceiling, lighting, finishes, electrical & hvac. no exterior or structural work, ls & sprinklers under separate permit. | $750,000 |
| Jul 19, 2010 | Completed final sign-off Oct 2011 | 123 Mission St | Bcci Construction Company | 19th floor tenant improvement of (e) offic espace including new partitions, ceiling, lighting, finishes, electrical & hvac. no exterior for structural work. ls & sprinkler under separate permit.Details
19th floor tenant improvement of (e) offic espace including new partitions, ceiling, lighting, finishes, electrical & hvac. no exterior for structural work. ls & sprinkler under separate permit. | $750,000 |
| May 13, 2009 | Completed final sign-off Feb 2010 | 101 Kearny St | Hathaway Dinwiddie Co. | light exterior demolition with the insulation of new windows on 2nd floor structuraly tied into (e) building. new exterior paint, finishes, replace lighting fixtures. new & replaced signage to be submitted under seperate permit.Details
light exterior demolition with the insulation of new windows on 2nd floor structuraly tied into (e) building. new exterior paint, finishes, replace lighting fixtures. new & replaced signage to be submitted under seperate permit. | $30,000 |
| Apr 20, 2009 | Completed final sign-off Apr 2009 | 303 02nd St | Swinerton Builders | revision to appl #200902252772 to provide rated wall, door, smoke damper, etc at electrical room.Details
revision to appl #200902252772 to provide rated wall, door, smoke damper, etc at electrical room. | $10,000 |
| Apr 7, 2009 | Completed final sign-off Apr 2009 | 1 Market St | Bcci Construction Company | at 7th fl: tenant improvement including new door vestible including of one new door and card reader, relocate electric door release, demolition & reconstruction of ada compliant slope, mep and fire life safety under separate permit.Details
at 7th fl: tenant improvement including new door vestible including of one new door and card reader, relocate electric door release, demolition & reconstruction of ada compliant slope, mep and fire life safety under separate permit. | $35,000 |
| Jan 8, 2009 | Completed final sign-off Jun 2009 | 1 California St | Bcci Construction Company | revision to 200806093945 in response to field request to upgrade restroom to comply to da requirementsDetails
revision to 200806093945 in response to field request to upgrade restroom to comply to da requirements | $8,000 |
| Oct 29, 2008 | Completed final sign-off Aug 2009 | 1 California St | Bcci Construction Company | tenant improvement on the 5th floor including minor demolition. new partition, ceilings, lighting, finishes, mechanical and electrical work. ls/sprinklers under separate permitDetails
tenant improvement on the 5th floor including minor demolition. new partition, ceilings, lighting, finishes, mechanical and electrical work. ls/sprinklers under separate permit | $750,000 |
| Oct 24, 2008 | Completed final sign-off Jul 2009 | 1 California St | Bcci Construction Company | 7/f- tenant improvement including new partitions, ceilings, lighting, finishes, mechanical & electrical. l.s under separate permit.Details
7/f- tenant improvement including new partitions, ceilings, lighting, finishes, mechanical & electrical. l.s under separate permit. | $750,000 |
| Oct 8, 2008 | Completed final sign-off Sep 2009 | 1 Bush St | Gci, Inc | t.i. for partial floor/ t. i. including demolition. new partition, finishing, and electrical work/lighting all within extg office space. mechanical & plumbing.Details
t.i. for partial floor/ t. i. including demolition. new partition, finishing, and electrical work/lighting all within extg office space. mechanical & plumbing. | $119,958 |
| Aug 22, 2008 | Completed final sign-off Jan 2009 | 1 Market St | Bcci Construction Company | minor demolition to relocate new door. built out of new transaction window & new partition. associated finishes. mep & life safety under separate permit.Details
minor demolition to relocate new door. built out of new transaction window & new partition. associated finishes. mep & life safety under separate permit. | $56,000 |
| May 13, 2008 | Completed final sign-off May 2008 | 1 Market St | Bcci Construction Company | scope of work is limited to interior, non structural pre-construction demolition. area to remain unoccupied in accodance with ab-017. no increase in office space. no fire rated construction to be removed, life safety to remain operationalDetails
scope of work is limited to interior, non structural pre-construction demolition. area to remain unoccupied in accodance with ab-017. no increase in office space. no fire rated construction to be removed, life safety to remain operational | $15,500 |
| Apr 8, 2008 | Completed final sign-off Sep 2008 | 1 Market St | Bcci Construction Company | tenant improvement on the 6th floor including demolition minimal construction, mechanical, lighting , electrical and finishes. life safty under separate permitDetails
tenant improvement on the 6th floor including demolition minimal construction, mechanical, lighting , electrical and finishes. life safty under separate permit | $260,000 |
| Jan 14, 2008 | Completed final sign-off Mar 2008 | 1 Market St | Bcci Construction Company | 10th floor tenant improvement of existing office space, including addition of (3) new offices, lighting, finishes, electrical and minor demolition. mechanical & electrical under separate permit.Details
10th floor tenant improvement of existing office space, including addition of (3) new offices, lighting, finishes, electrical and minor demolition. mechanical & electrical under separate permit. | $35,000 |
| Nov 8, 2007 | Completed final sign-off Apr 2008 | 595 Market St | 30th floor: pre-construction, interior , non-structural demolition only. this floor is to remain unoccupied. exiting and occupancy to be addressed under separate permit.Details
30th floor: pre-construction, interior , non-structural demolition only. this floor is to remain unoccupied. exiting and occupancy to be addressed under separate permit. | $27,000 | |
| Nov 8, 2007 | Completed final sign-off Apr 2008 | 595 Market St | 29th floor: pre-construction, interior, non-structural demolition only. this floor is to remain unoccupied. exiting and occupancy to be addressed under separate permit.Details
29th floor: pre-construction, interior, non-structural demolition only. this floor is to remain unoccupied. exiting and occupancy to be addressed under separate permit. | $27,000 | |
| Oct 25, 2007 | Completed final sign-off Feb 2008 | 1 Market St | Dpr Construction Inc | 5th floor - minor t.i. including limited new finishes, minimal demolition, construction, electrical & mechanical. mechanical, electrical, & plumbing under separate permit.Details
5th floor - minor t.i. including limited new finishes, minimal demolition, construction, electrical & mechanical. mechanical, electrical, & plumbing under separate permit. | $150,000 |
| Oct 25, 2007 | Completed final sign-off Mar 2008 | 117 Post St | Gci, Inc | 5th floor-new full floor t.i. minimal demo. construction of new walls, doors and partitions. trades to follow: mechanical, electrical, life safety under seperate permitsDetails
5th floor-new full floor t.i. minimal demo. construction of new walls, doors and partitions. trades to follow: mechanical, electrical, life safety under seperate permits | $200,000 |
| Aug 15, 2007 | Completed final sign-off Dec 2007 | 135 Main St | Gci, Inc | 7th floor: full floor tenant improvement including construction of new offices, 2 conference rooms, copy room, filing room, lunch/lounge and service room. mep, life safety, fire sprinkler will be under separate permit. the demolition work has been completed under another permit.Details
7th floor: full floor tenant improvement including construction of new offices, 2 conference rooms, copy room, filing room, lunch/lounge and service room. mep, life safety, fire sprinkler will be under separate permit. the demolition work has been completed under another permit. | $1,200,000 |
| Aug 8, 2007 | Completed final sign-off Jan 2008 | 50 Fremont St | Ayoob & Peery Plumbing Co Inc | 16th,17th,18th flrs-relocate sprinkler per tenant improvements: 16th fl-91 relocates, 8 removed, 1 add. 17th fl-136 relocates, 33 removed. 18th fl-136 relocates, 25 removed.Details
16th,17th,18th flrs-relocate sprinkler per tenant improvements: 16th fl-91 relocates, 8 removed, 1 add. 17th fl-136 relocates, 33 removed. 18th fl-136 relocates, 25 removed. | $98,800 |
| Aug 6, 2007 | Completed final sign-off Mar 2008 | 1 Market St | Dpr Construction Inc | t.i. on 4 th floorDetails
t.i. on 4 th floor | $150,000 |
| Jul 27, 2007 | Completed final sign-off Jan 2008 | 50 Fremont St | Swinerton Builders | 18th floor interior buildout of partitions, doors & sidelites with related finishes, lighting, plumbing and mechanical work; restrooms to be brought to full compliance; demo under pa#200707207333; life safety/sprinklers under separate permitDetails
18th floor interior buildout of partitions, doors & sidelites with related finishes, lighting, plumbing and mechanical work; restrooms to be brought to full compliance; demo under pa#200707207333; life safety/sprinklers under separate permit | $1,200,000 |
| Jul 24, 2007 | Completed final sign-off Dec 2007 | 595 Market St | 25th floor-construction of new demishing wall and exiting on 25th. floor. new recessed doors for exiting.Details
25th floor-construction of new demishing wall and exiting on 25th. floor. new recessed doors for exiting. | $10,000 | |
| Jun 19, 2007 | Completed final sign-off Aug 2007 | 101 California St | Richlen Construction | 27th floor-life safety submission for suite #2750-add one smoke detector.Details
27th floor-life safety submission for suite #2750-add one smoke detector. | $2,000 |
| Jun 8, 2007 | Never finaled issued Jun 2007, no final | 101 California St | demolition only of exist office, walls,ceiling grid (non struc demo, no change to occupancy)Details
demolition only of exist office, walls,ceiling grid (non struc demo, no change to occupancy) | $28,000 | |
| May 24, 2007 | Completed final sign-off Nov 2007 | 50 Fremont St | oti-2, mellon capital, 17th fl, el, me.Details
oti-2, mellon capital, 17th fl, el, me. | $419,982 | |
| May 24, 2007 | Completed final sign-off Nov 2007 | 50 Fremont St | Swinerton Builders | oti-1, 17th floor, el, me, ls, sp.Details
oti-1, 17th floor, el, me, ls, sp. | $619,929 |
| May 24, 2007 | Completed final sign-off Dec 2007 | 50 Fremont St | Swinerton Builders | oti-2, 16th fl, el & me.Details
oti-2, 16th fl, el & me. | $419,929 |
| May 24, 2007 | Completed final sign-off Dec 2007 | 50 Fremont St | Swinerton Builders | oti-1, 16th floor, el, me, ls, sp.Details
oti-1, 16th floor, el, me, ls, sp. | $619,929 |
| Apr 24, 2007 | Completed final sign-off Oct 2007 | 100 01st St | oti-1 6th fl me, sp, lsDetails
oti-1 6th fl me, sp, ls | $25,000 | |
| Apr 5, 2007 | Completed final sign-off Jul 2007 | 595 Market St | Commercial Interior Builders Inc | oti-1, tishman speyer, 8th floor.Details
oti-1, tishman speyer, 8th floor. | $42,000 |
| Feb 26, 2007 | Completed final sign-off Aug 2007 | 50 Fremont St | Swinerton Builders | oti-1, mellon capital mgmt, 39th floor, el, me, ls, sp.Details
oti-1, mellon capital mgmt, 39th floor, el, me, ls, sp. | $1,000,000 |
| Feb 26, 2007 | Completed final sign-off Aug 2007 | 50 Fremont St | Swinerton Builders | oti-1, mellon capital mgmt, 38th floor, el, me, ls, sp.Details
oti-1, mellon capital mgmt, 38th floor, el, me, ls, sp. | $1,000,000 |
| Feb 26, 2007 | Completed final sign-off Aug 2007 | 50 Fremont St | Swinerton Builders | oti-2, mellon capital mgmt, 39th floor el, me.Details
oti-2, mellon capital mgmt, 39th floor el, me. | $800,000 |
| Feb 26, 2007 | Completed final sign-off Aug 2007 | 50 Fremont St | Swinerton Builders | oti-2, mellon capital mgmt, 38th floor, el, me.Details
oti-2, mellon capital mgmt, 38th floor, el, me. | $800,000 |
| Feb 21, 2007 | Completed final sign-off Oct 2007 | 301 Battery St | Bcci Construction Company | basement - tenant improvement work in the basement. convert to storage area(s), sprinklers under seperate permit.Details
basement - tenant improvement work in the basement. convert to storage area(s), sprinklers under seperate permit. | $175,000 |
| Feb 13, 2007 | Completed final sign-off Aug 2007 | 50 Fremont St | Swinerton Builders | upgrade men's & womens restrooms on 38th and 39th floor. new communicating stair between 38th & 39th floors.Details
upgrade men's & womens restrooms on 38th and 39th floor. new communicating stair between 38th & 39th floors. | $500,000 |
| Oct 16, 2006 | Completed final sign-off Mar 2007 | 3 Embarcadero Center | Field Construction Inc. | oti-3 5th floor lsDetails
oti-3 5th floor ls | $10,000 |
| Oct 6, 2006 | Expired or cancelled withdrawn Oct 2007 | 1360 Jones St | replace winows "1n-kind"Details
replace winows "1n-kind" | $200,000 | |
| Oct 4, 2006 | Expired or cancelled cancelled May 2007 | 101 Montgomery St | Cahill Const Service Inc | oti-1 23rd floor, el,ls, spDetails
oti-1 23rd floor, el,ls, sp | $218,000 |
| Jun 12, 2006 | Completed final sign-off Oct 2006 | 1360 Jones St | Scandia Builders | replace windows on 10th floor/old aluminum retrofits getting upgraded to more historically correct wood wndw with exterior aluminum claddingDetails
replace windows on 10th floor/old aluminum retrofits getting upgraded to more historically correct wood wndw with exterior aluminum cladding | $20,000 |
| Jun 1, 2006 | Completed final sign-off Nov 2006 | 50 Beale St | Swinerton Builders | construct 1 new office, relocate 2 light fixtures, 1 new handicapped accessible single accomodation restroom @ g/f only.Details
construct 1 new office, relocate 2 light fixtures, 1 new handicapped accessible single accomodation restroom @ g/f only. | $80,000 |
| Dec 1, 2005 | Completed final sign-off Mar 2006 | 595 Market St | City Building Inc. | oti-2 9/f el, meDetails
oti-2 9/f el, me | $121,500 |
| Dec 1, 2005 | Completed final sign-off Mar 2006 | 595 Market St | oti-1 9/f el, me, ls, sp. new conference room & offices with associated ceiling, electrical, lighting & finish work.Details
oti-1 9/f el, me, ls, sp. new conference room & offices with associated ceiling, electrical, lighting & finish work. | $121,500 | |
| Nov 3, 2005 | Completed final sign-off Jan 2006 | 595 Market St | City Building Inc. | oti-2, 5th floor, el, me.Details
oti-2, 5th floor, el, me. | $90,000 |
| Oct 21, 2005 | Completed final sign-off Mar 2006 | 595 Market St | Dome Construction Corp | oti-1, 6th floor, suite 650, el, me, ls, sp.Details
oti-1, 6th floor, suite 650, el, me, ls, sp. | $235,690 |
| Oct 17, 2005 | Completed final sign-off Nov 2005 | 1 Sansome St | oti-1 36th floor/t.i. consisting of partitions, doors, finishes , ada upgrades all work on 36th floorDetails
oti-1 36th floor/t.i. consisting of partitions, doors, finishes , ada upgrades all work on 36th floor | $20,000 | |
| Oct 7, 2005 | Completed final sign-off Oct 2005 | 101 Montgomery St | Cahill Const Service Inc | build 20 lineal feet of ceilings high drywall partition relocate 1-door + frame. revision to permit#200508241064.Details
build 20 lineal feet of ceilings high drywall partition relocate 1-door + frame. revision to permit#200508241064. | $2,500 |
| Oct 4, 2005 | Completed final sign-off Dec 2005 | 4 Embarcadero Center | Field Construction Inc. | oti-2, 5th floor, el, me.Details
oti-2, 5th floor, el, me. | $45,000 |
| Sep 29, 2005 | Expired or cancelled cancelled Mar 2007 | 595 Market St | upgrade (e) server room walls & addition of battery racks.Details
upgrade (e) server room walls & addition of battery racks. | $20,000 | |
| Sep 20, 2005 | Completed final sign-off Jul 2008 | 932 Mission St | Britannia Construction, Inc. | fire repair to historical building same in kind. no structural work. ada upgrade toilet, entry.Details
fire repair to historical building same in kind. no structural work. ada upgrade toilet, entry. | $300,000 |
| Sep 19, 2005 | Completed final sign-off Aug 2006 | 4 Embarcadero Center | Turner Construction Co | oti-1, 7th floor, el, me, ls, sp.Details
oti-1, 7th floor, el, me, ls, sp. | $300,000 |
| Sep 14, 2005 | Completed final sign-off Oct 2005 | 595 Market St | soft demolition of extg retail space with associated electrical and finish workDetails
soft demolition of extg retail space with associated electrical and finish work | $27,000 | |
| Aug 24, 2005 | Completed final sign-off Oct 2005 | 101 Montgomery St | Cahill Const Service Inc | oti-1 12/f el, me, ls, spDetails
oti-1 12/f el, me, ls, sp | $88,000 |
| Aug 23, 2005 | Completed final sign-off Nov 2005 | 595 Market St | oti-1 5th fl, el, me, ls, sp.Details
oti-1 5th fl, el, me, ls, sp. | $290,000 | |
| Jun 14, 2005 | Completed final sign-off Oct 2005 | 595 Market St | demo of existing deli with assoc electrical & finish work on 1st fl.Details
demo of existing deli with assoc electrical & finish work on 1st fl. | $27,000 | |
| May 17, 2005 | Completed final sign-off Jun 2005 | 1 Sansome St | minor office tenant improvement, including new partitions, furniture reconfiguration, no mechanicalDetails
minor office tenant improvement, including new partitions, furniture reconfiguration, no mechanical | $19,500 | |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | oti-1 15th/fl-el,me, ls, sp.Details
oti-1 15th/fl-el,me, ls, sp. | $90,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | full floor t.i consisting of demolition.Details
full floor t.i consisting of demolition. | $90,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | full floor t.i consisting of demolition.Details
full floor t.i consisting of demolition. | $90,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | oti-2 15th/fl-el,me.Details
oti-2 15th/fl-el,me. | $80,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | oti-1 14th/fl-el,me, ls, sp.Details
oti-1 14th/fl-el,me, ls, sp. | $90,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | oti-2, 14th floor, el, me.Details
oti-2, 14th floor, el, me. | $80,000 |
| May 9, 2005 | Completed final sign-off Nov 2005 | 101 Montgomery St | Cahill Const Service Inc | oti-1 17th floor el me ls spDetails
oti-1 17th floor el me ls sp | $88,000 |