Block 3721, lot 073
101 02nd St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 3, 2011 | Completed final sign-off Jul 2011 | 101 02nd St | R L H Fire Protection Inc | fire sprinkler ti on 7th floor. relocate 38 heads and add 17 headsDetails
fire sprinkler ti on 7th floor. relocate 38 heads and add 17 heads | $27,500 |
| Dec 9, 2010 | Completed final sign-off Mar 2011 | 101 02nd St | Hathaway Dinwiddie Co. | construct 3 new offices. minor repair/replacement of finishes. convert 1 room to conference room. fire alarm/sprinkler under sep permitDetails
construct 3 new offices. minor repair/replacement of finishes. convert 1 room to conference room. fire alarm/sprinkler under sep permit | $150,000 |
| Oct 15, 2010 | Completed final sign-off Dec 2010 | 101 02nd St | Novo Construction Inc | 3rd floor:t.i. include the demolition of non structural partition and building of new non structural partitions. all new or rvised hvac electrical and life safety . hvac and electrical in this permit. building fully sprinkleredDetails
3rd floor:t.i. include the demolition of non structural partition and building of new non structural partitions. all new or rvised hvac electrical and life safety . hvac and electrical in this permit. building fully sprinklered | $450,000 |
| Aug 19, 2010 | Completed final sign-off Oct 2010 | 101 02nd St | Hathaway Dinwiddie Co. | 10th floor ste 1000 -create conference room by building new walls & adding doors. fire alarm & sprinkler work to be carried under seperate permitDetails
10th floor ste 1000 -create conference room by building new walls & adding doors. fire alarm & sprinkler work to be carried under seperate permit | $45,000 |
| Jul 29, 2010 | Completed final sign-off Oct 2010 | 101 02nd St | Peacock Construction Inc | 16th fl :ti includes demo of non struct partitons and building new non struc partitions. all new or revised. hvac,elec,plumb, life safety work design build sep permit. building fully sprinkleredDetails
16th fl :ti includes demo of non struct partitons and building new non struc partitions. all new or revised. hvac,elec,plumb, life safety work design build sep permit. building fully sprinklered | $130,000 |
| Jun 8, 2010 | Completed final sign-off Aug 2010 | 101 02nd St | Novo Construction Inc | office ti on the 22nd floor. include demo of non structural partitions and building new non- struc partitions. all new or revisedhvac, elec, plbg and life safety work is fully engineered. building is fully sprinkleredDetails
office ti on the 22nd floor. include demo of non structural partitions and building new non- struc partitions. all new or revisedhvac, elec, plbg and life safety work is fully engineered. building is fully sprinklered | $438,000 |
| Jun 2, 2010 | Completed final sign-off Jul 2010 | 101 02nd St | R L H Fire Protection Inc | t/i upgrade on an (e) fire sprinkler sys. for the 16th. flr. (suite#1601-#1602-#1603) relocate 46-hd; add 8-hd; remove 7-hd, total-53.Details
t/i upgrade on an (e) fire sprinkler sys. for the 16th. flr. (suite#1601-#1602-#1603) relocate 46-hd; add 8-hd; remove 7-hd, total-53. | $13,500 |
| May 21, 2010 | Completed final sign-off Jul 2010 | 101 02nd St | Field Construction Inc. | 24th. flr. t. i. includes demo o non-structural partitions & bldg. (n) non-structural & building. (n) nonstructural partitions. no hvac, no plumbing, no life safety required. fire sprinklers & electrical to submitted under separate permit. bldg. is fully sprinklered.Details
24th. flr. t. i. includes demo o non-structural partitions & bldg. (n) non-structural & building. (n) nonstructural partitions. no hvac, no plumbing, no life safety required. fire sprinklers & electrical to submitted under separate permit. bldg. is fully sprinklered. | $30,000 |
| Jun 25, 2007 | Never finaled issued Jun 2007, no final | 101 02nd St | C B 2 Builders Incorporated | 5th floor - revision to appl 200703075669. removal of q door in rated wall for office space.Details
5th floor - revision to appl 200703075669. removal of q door in rated wall for office space. | $500 |
| Mar 27, 2007 | Completed final sign-off Apr 2007 | 101 02nd St | Novo Construction Inc | cv starr oti-2 el,me,spDetails
cv starr oti-2 el,me,sp | $15,000 |
| Mar 26, 2007 | Completed final sign-off Apr 2007 | 101 02nd St | Novo Construction Inc | oti-1 25th floor el me spDetails
oti-1 25th floor el me sp | $20,000 |
| Mar 7, 2007 | Completed final sign-off Jul 2007 | 101 02nd St | oti-1 5th floor el me ls spDetails
oti-1 5th floor el me ls sp | $50,000 | |
| Nov 14, 2005 | Completed final sign-off Mar 2006 | 101 02nd St | Anderson, Rowe & Buckley, Inc. | t.i. (e) fire sprinkler system - 22 relocates, 1 removed, 8 new, no increase in sizeDetails
t.i. (e) fire sprinkler system - 22 relocates, 1 removed, 8 new, no increase in size | $5,600 |
| Aug 16, 2005 | Completed final sign-off Mar 2006 | 101 02nd St | 12th /fl. common corrider work project. includes mech & electrical drawingsDetails
12th /fl. common corrider work project. includes mech & electrical drawings | $120,000 | |
| Aug 16, 2005 | Completed final sign-off Mar 2006 | 101 02nd St | 12th fl-partial floor t.i: demo wall, build back partition walls. also included are mech, electricalDetails
12th fl-partial floor t.i: demo wall, build back partition walls. also included are mech, electrical | $185,000 | |
| Jun 23, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | 15/f-life safety (n)1 smoke detector,8 speaker strobes,1 photoelec smoke detector,1 enterface moduleDetails
15/f-life safety (n)1 smoke detector,8 speaker strobes,1 photoelec smoke detector,1 enterface module | $20,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | oti-2 15th/fl-el,me.Details
oti-2 15th/fl-el,me. | $80,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | full floor t.i consisting of demolition.Details
full floor t.i consisting of demolition. | $90,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | oti-1 15th/fl-el,me, ls, sp.Details
oti-1 15th/fl-el,me, ls, sp. | $90,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | full floor t.i consisting of demolition.Details
full floor t.i consisting of demolition. | $90,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | oti-2, 14th floor, el, me.Details
oti-2, 14th floor, el, me. | $80,000 |
| May 16, 2005 | Completed final sign-off Dec 2005 | 101 02nd St | Novo Construction Inc | oti-1 14th/fl-el,me, ls, sp.Details
oti-1 14th/fl-el,me, ls, sp. | $90,000 |
| Aug 27, 2004 | Never finaled issued Aug 2004, no final | 101 02nd St | Hathaway Dinwiddie Co. | renew appl#200306025970 for final inspectionDetails
renew appl#200306025970 for final inspection | |
| Dec 17, 2001 | Expired or cancelled expired Sep 2005 | 101 02nd St | Taslimi Construction Co Inc | oti-1, 24th floor, el, me, ls, spDetails
oti-1, 24th floor, el, me, ls, sp | $285,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Novo Construction Inc (11), Hathaway Dinwiddie Co. (3), R L H Fire Protection Inc (2), Anderson, Rowe & Buckley, Inc., C B 2 Builders Incorporated, Field Construction Inc., Peacock Construction Inc, Taslimi Construction Co Inc
- Architects
- Leif Glomset (6), Keith Hooks (2), Nicholas Brereton, Pamela Harris, Paul And Bosman Arch
- Engineers
- Ayoob & Peery, Black & Kurtz Inc, Black + Kurtz Inc, Keith Hooks, Siemens
- Authorized agent-otherss
- Chris Erhardt (2), Leif Glomset (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.