Permit GraphShortlistSan Francisco building permits since 2000

Bradley Hollub

License
M33234
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M33234 at the Board for Professional Engineers
Listed as
authorized agent-others, designer, engineer
Firm
Randall Lamb Assoc
Based in
San Francisco
On San Francisco permits
Nov 2014 to Nov 2026

57 permits since 2000 (engineer on 56 permits, authorized agent-others on 1 permit, designer on 1 permit): 29 completed, 19 in progress, 3 never finaled, 6 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Skyline Construction (10), Matrix Hg Inc (8), Principal Builders Inc. (6), Msr Mechanical Llc (4), Novo Construction Inc (4), Clune Construction Company L P (3), W. Bradley Electric (2), Anderson, Rowe & Buckley, Inc., Bcci Construction Company, Ca United Mechanical, Inc, City Building Inc., Dpr Construction A, Marchetti Group, Plant Construction Co, Lp, Richlen Construction, Sc Builders, Inc, Source Planning And Construction Inc
Architects
Adam Murphy (3), Michael Zelazek (3), Donnie Lam (2), Ashley Miller, David De Valeria, David Raymond Hecht, Elizabeth Utley Hagerty, Erin Uesugi, George Soskin, James Maxwell, James Terry, Mark Koenigs, Patrick Daly, Rebecca Swanner, Sharon Russo, Stanley H Lew, Thomas Braham, Walt Thomas, William Raymond Turner
Engineers
Stephen Shaffer (11), Aaron J. Strauch (9), Alexander Joseph Pacheco (4), Christopher Lloyd (4), Elisabeth M Allen (4), Amanda Garcia (3), Dean Macy (3), Jennifer Keeene (3), Joseph Williams (3), Habtom Tewelde (2), Ivano Russo (2), Rudolfo P Bustos Iii (2), Anindya Dutta, Anthony Bruno, Carlo Biscocho, Christopher Jordan Malabed, Joseph L Williams, Kurt Kohler, Lewis M Gronniger, Sherry Chaumpluke

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
filed Nov 2026, not yet issued
600 Montgomery St33rd floor: tenant improvement work includes new interior non-structural partitions, power outlets, light fixtures, ceiling assembly, millwork, plumbing and finishes. no change in use or area.
Details
Permit
202611100622

33rd floor: tenant improvement work includes new interior non-structural partitions, power outlets, light fixtures, ceiling assembly, millwork, plumbing and finishes. no change in use or area.

Open the permit page

$886,170
Oct 30, 2026In progress
filed Oct 2026, not yet issued
840 Battery Stlevel 2: interior tenant improvement includes new partitions, ceilings, finishes. mep included
Details
Permit
202610300153

level 2: interior tenant improvement includes new partitions, ceilings, finishes. mep included

Open the permit page

$3,223,130
Oct 30, 2026In progress
filed Oct 2026, not yet issued
840 Battery Stlevel 1: interior tenant improvement includes new partitions, ceilings, finishes. mep
Details
Permit
202610300141

level 1: interior tenant improvement includes new partitions, ceilings, finishes. mep

Open the permit page

$4,840,908
Oct 19, 2026In progress
issued Oct 2026
88 Spear StPrincipal Builders Inc.9th fl - deferred mep to pa 202610028988
Details
Permit
202610199584
Permit issued
Oct 23, 2026

9th fl - deferred mep to pa 202610028988

Open the permit page

$766,000
Oct 5, 2026In progress
filed Oct 2026, not yet issued
225 Bush St15th fl - construction and cosmetic finish updates to existing break room area. 2 new food serving stations and turn existing storage to a non-cooking prep kitchen
Details
Permit
202610059024

15th fl - construction and cosmetic finish updates to existing break room area. 2 new food serving stations and turn existing storage to a non-cooking prep kitchen

Open the permit page

$454,138
Aug 13, 2026In progress
issued Aug 2026
1570 Bay StMatrix Hg Increplacement of 3 bard units, 2 serving the swgr building and 1 serving the battery building and structural support to support the units. no new fire smoke dampers required.
Details
Permit
202608136498
Permit issued
Aug 13, 2026

replacement of 3 bard units, 2 serving the swgr building and 1 serving the battery building and structural support to support the units. no new fire smoke dampers required.

Open the permit page

$62,906
Jun 26, 2026In progress
issued Jul 2026
345 California StSkyline Construction10th fl, ste 1000; mechanical, electrical and plumbing work for ti. ref pa 202606102955
Details
Permit
202606264003
Permit issued
Jul 20, 2026

10th fl, ste 1000; mechanical, electrical and plumbing work for ti. ref pa 202606102955

Open the permit page

$300,000
Jun 26, 2026In progress
issued Jul 2026
4 Embarcadero CenterCa United Mechanical, Incwater cooled chiller replacement
Details
Permit
202606263981
Permit issued
Jul 13, 2026

water cooled chiller replacement

Open the permit page

$1,000,000
Apr 20, 2026Completed
final sign-off Aug 2026
655 Montgomery StNovo Construction Inc6th & 7th floors - mechanical work for ti ref pa 202602065450
Details
Permit
202604209689
Permit issued
May 20, 2026
Final sign-off
Aug 11, 2026

6th & 7th floors - mechanical work for ti ref pa 202602065450

Open the permit page

$175,000
Mar 13, 2026Completed
final sign-off Oct 2026
114 Sansome StSkyline Constructionoffice ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system.
Details
Permit
202603137536
Permit issued
Apr 3, 2026
Final sign-off
Oct 16, 2026

office ti 7th fl. demo and construct non load bearing partitions, millwork, lighting, ceiling system.

Open the permit page

$1,400,000
Mar 10, 2026Completed
final sign-off May 2026
66 Kearny StSource Planning And Construction Inc1st fl - meps for 202511260493
Details
Permit
202603107224
Permit issued
Mar 10, 2026
Final sign-off
May 12, 2026

1st fl - meps for 202511260493

Open the permit page

$194,832
Jan 20, 2026In progress
issued Sep 2026
555 California StPrincipal Builders Inc.40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas
Details
Permit
202601204120
Permit issued
Sep 18, 2026

40th fl - non-structural partitions, finishes, millwork, ceilings for new open office, meeting rooms & break areas

Open the permit page

$1,198,400
Dec 30, 2025In progress
filed Dec 2025, not yet issued
333 Market Streplace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet.
Details
Permit
202512302961

replace existing electrical fire pump with new in basement. fp-eor under sep cover as deferred submittal. new pge electrical service with electric gear in a dedicated electrical closet.

Open the permit page

$600,000
Dec 30, 2025In progress
issued Feb 2026
300 Mission StSkyline Constructiontenant improvement on the 16th and 17th flr. to include conversion of private office to conference rooms convention of storage room to yoga/fitness room. intallation of dishwasher, three comp sink, hand sink and above flr grease trap to (e) dishroom. mep included.
Details
Permit
202512302939
Permit issued
Feb 26, 2026

tenant improvement on the 16th and 17th flr. to include conversion of private office to conference rooms convention of storage room to yoga/fitness room. intallation of dishwasher, three comp sink, hand sink and above flr grease trap to (e) dishroom. mep included.

Open the permit page

$160,000
Dec 18, 2025In progress
issued Jan 2026
1 Market StClune Construction Company L P13th fl - hvac ti project unit the (e) base bldg hvac system; modification to the air distribution system in the tenant space to suit arc renov including install of vav boxes and fan powered terminal for tenant needs. no new fire smoke dampers. ref pa 202512111539
Details
Permit
202512182196
Permit issued
Jan 7, 2026

13th fl - hvac ti project unit the (e) base bldg hvac system; modification to the air distribution system in the tenant space to suit arc renov including install of vav boxes and fan powered terminal for tenant needs. no new fire smoke dampers. ref pa 202512111539

Open the permit page

$300,000
Dec 16, 2025In progress
issued Sep 2026
555 California StPrincipal Builders Inc.l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.
Details
Permit
202512161909
Permit issued
Sep 18, 2026

l41: ti. non-structural partitions, finishes, millwork, ceilings for new offices, meeting rooms and break areas.

Open the permit page

$5,419,764
Sep 25, 2025In progress
filed Sep 2025, not yet issued
333 Market Streconnection of auxiliary system to support the replacement of an existing fire pump. this includes structural attachment of fire pump, mech exhaust reconn,fuel piping reconn, & power reconn. fire pump specification and design shall be deferred submittal.
Details
Permit
202509115089

reconnection of auxiliary system to support the replacement of an existing fire pump. this includes structural attachment of fire pump, mech exhaust reconn,fuel piping reconn, & power reconn. fire pump specification and design shall be deferred submittal.

Open the permit page

$75,000
Sep 16, 2025Expired or cancelled
cancelled May 2026
650 07th StPrincipal Builders Inc.interior ti of ground fl existing office space. mechanical deferred.
Details
Permit
202509165427
Permit issued
Oct 9, 2025

interior ti of ground fl existing office space. mechanical deferred.

Open the permit page

$250,000
Aug 15, 2025In progress
issued Dec 2025
456 Montgomery StAnderson, Rowe & Buckley, Inc.install new fuel fill and day tank for a diesel fire pump.
Details
Permit
202507301910
Permit issued
Dec 4, 2025

install new fuel fill and day tank for a diesel fire pump.

Open the permit page

$125,000
Jul 18, 2025Completed
final sign-off Jul 2026
685 Market StSc Builders, Inclevel 1: deferred mep for permit 202506168762
Details
Permit
202507181134
Permit issued
Aug 6, 2025
Final sign-off
Jul 16, 2026

level 1: deferred mep for permit 202506168762

Open the permit page

$257,040
Mar 31, 2025In progress
issued Mar 2025
151 Union StMsr Mechanical Llc2 like for like water-cooled chiller replacements.
Details
Permit
202503313379
Permit issued
Mar 31, 2025

2 like for like water-cooled chiller replacements.

Open the permit page

$350,000
Mar 11, 2025Completed
final sign-off Aug 2026
550 Terry A Francois BlPrincipal Builders Inc.level 5 - interior tenant improvement, includes new non-load rearing partition, ceilings, finishes, millwork a lighting mep included.
Details
Permit
202503111984
Permit issued
May 29, 2025
Final sign-off
Aug 7, 2026

level 5 - interior tenant improvement, includes new non-load rearing partition, ceilings, finishes, millwork a lighting mep included.

Open the permit page

$10,780,569
Mar 10, 2025Completed
final sign-off Oct 2025
3250 Van Ness AvMsr Mechanical Llcreplace one (1) water cooled chiller at grade
Details
Permit
202503101880
Permit issued
Mar 10, 2025
Final sign-off
Oct 16, 2025

replace one (1) water cooled chiller at grade

Open the permit page

$175,000
Feb 19, 2025Completed
final sign-off Oct 2026
405 Howard StSkyline Construction8/f: mep for previously approved arch permit 202412126728, office ti. work includes ductwork, lighting, power and signal.
Details
Permit
202502190622
Permit issued
Apr 21, 2025
Final sign-off
Oct 16, 2026

8/f: mep for previously approved arch permit 202412126728, office ti. work includes ductwork, lighting, power and signal.

Open the permit page

$200,000
Jan 17, 2025Completed
final sign-off Oct 2026
405 Howard StSkyline Constructionmep for previously approved architectural pa# 202412126726 hvac/ductwork, new power, signal, lighting controls
Details
Permit
202501178606
Permit issued
Mar 5, 2025
Final sign-off
Oct 15, 2026

mep for previously approved architectural pa# 202412126726 hvac/ductwork, new power, signal, lighting controls

Open the permit page

$200,000
Nov 21, 2024Expired or cancelled
cancelled Mar 2025
1 Union StMsr Mechanical Llctwo like for like chillers replacment.
Details
Permit
202411215455
Permit issued
Mar 10, 2025

two like for like chillers replacment.

Open the permit page

$450,000
Oct 10, 2024Completed
final sign-off May 2025
1 Market StDpr Construction A35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operational
Details
Permit
202410102710
Permit issued
Nov 18, 2024
Final sign-off
May 27, 2025

35th fl: interior ti construction of non load bearing partitions, new doors, frames & glazing, new ceilings, lights, new millwork & finishes. modifications to mech & plumbing systems shall allow base building infrastructure to remain intact & operational

Open the permit page

$3,760,780
Aug 13, 2024Completed
final sign-off Nov 2025
22 04th StSkyline Constructionbasement l2: diesel fire pump replacement. 1000 gpm x 165 psi
Details
Permit
202408138575
Permit issued
Apr 14, 2025
Final sign-off
Nov 7, 2025

basement l2: diesel fire pump replacement. 1000 gpm x 165 psi

Open the permit page

$150,000
Apr 5, 2024In progress
issued Apr 2024
595 Market StMatrix Hg Inc13th fl, #1350 - revision to pa 202310259457 t-24 pages were updated to show correct forms needed
Details
Permit
202404059384
Permit issued
Apr 5, 2024

13th fl, #1350 - revision to pa 202310259457 t-24 pages were updated to show correct forms needed

Open the permit page

Mar 7, 2024In progress
issued Mar 2024
101 Mission StNovo Construction Inc18th fl - mechanical and electrical work for tenant improvement. ref pa 202312142491
Details
Permit
202403077332
Permit issued
Mar 8, 2024

18th fl - mechanical and electrical work for tenant improvement. ref pa 202312142491

Open the permit page

$12,000
Feb 23, 2024Completed
final sign-off May 2024
650 California StMatrix Hg Inc27th fl ti using base building hvac system. modifications to air distribution system in tenant space to suite arch renovations, includidng installation of water source heat pump and associated ductwork. no new fire smoke dampers required. ref 202401123873 and 202310259410
Details
Permit
202402236411
Permit issued
Feb 23, 2024
Final sign-off
May 10, 2024

27th fl ti using base building hvac system. modifications to air distribution system in tenant space to suite arch renovations, includidng installation of water source heat pump and associated ductwork. no new fire smoke dampers required. ref 202401123873 and 202310259410

Open the permit page

$45,000
Jan 29, 2024Completed
final sign-off Jun 2024
120 Kearny StMatrix Hg Inc27/f-ste 2700: modification to air distribution system in tenant space to suite architectural renovations, ref ti pa# 202311211257.
Details
Permit
202401294795
Permit issued
Feb 1, 2024
Final sign-off
Jun 11, 2024

27/f-ste 2700: modification to air distribution system in tenant space to suite architectural renovations, ref ti pa# 202311211257.

Open the permit page

$48,834
Jan 29, 2024Completed
final sign-off Jun 2024
120 Kearny StMatrix Hg Inc34/f-ste 3450: modification to air distribution system in tenant space to suite architectural renovations, ref ti pa# 202311211204.
Details
Permit
202401294793
Permit issued
Feb 1, 2024
Final sign-off
Jun 11, 2024

34/f-ste 3450: modification to air distribution system in tenant space to suite architectural renovations, ref ti pa# 202311211204.

Open the permit page

$11,203
Jan 12, 2024Completed
final sign-off May 2024
650 California StMatrix Hg Inc27/f: ti using the (e) base building hvac system. modifications to the air distribution system in the tenant space to suit architectural renovations, including installation of new vav boxes and installation of new ductwork, no new fire smoke dampers required. building permit# 202310259410.
Details
Permit
202401123873
Permit issued
Jan 19, 2024
Final sign-off
May 10, 2024

27/f: ti using the (e) base building hvac system. modifications to the air distribution system in the tenant space to suit architectural renovations, including installation of new vav boxes and installation of new ductwork, no new fire smoke dampers required. building permit# 202310259410.

Open the permit page

$69,848
Nov 10, 2023Completed
final sign-off Mar 2024
425 California StMatrix Hg Inc22nd fl - ti project using the (e) base building hvac system modificaitons to the air distribution system in the tenant space to suit architectural renovations, including replacement of vav dual duct boxes and installation of new ductwork for tenant it needs. project also includes installation fan
Details
Permit
202311100583
Permit issued
Nov 17, 2023
Final sign-off
Mar 27, 2024

22nd fl - ti project using the (e) base building hvac system modificaitons to the air distribution system in the tenant space to suit architectural renovations, including replacement of vav dual duct boxes and installation of new ductwork for tenant it needs. project also includes installation fan

Open the permit page

$84,239
Oct 5, 2023Completed
final sign-off Jan 2024
1 Lombard StMatrix Hg Incboiler replacement.
Details
Permit
202310058111
Permit issued
Oct 11, 2023
Final sign-off
Jan 25, 2024

boiler replacement.

Open the permit page

$150,000
Sep 22, 2023Completed
final sign-off Dec 2024
2150 Fulton StPlant Construction Co, Lpdeferred mep for pa# 202307172314.
Details
Permit
202309227237
Permit issued
Nov 9, 2023
Final sign-off
Dec 19, 2024

deferred mep for pa# 202307172314.

Open the permit page

$69,438
Aug 18, 2023Never finaled
issued Sep 2023, no final
585 Mission StSkyline Constructionste 100c - tenant improvement for a bank branch including new millwork for transactions done at new atm.
Details
Permit
202308184774
Permit issued
Sep 7, 2023

ste 100c - tenant improvement for a bank branch including new millwork for transactions done at new atm.

Open the permit page

$250,000
Aug 11, 2023Completed
final sign-off Mar 2024
900 North Point StMarchetti Groupdeferred mep for 202307111874
Details
Permit
202308114236
Permit issued
Sep 27, 2023
Final sign-off
Mar 25, 2024

deferred mep for 202307111874

Open the permit page

$349,200
Jul 7, 2023In progress
issued Apr 2024
111 Pine StW. Bradley Electricreplace electrical switch gear and electrical equipmemt on the tenant floors provide minor plumbing and mechanical alterations to support the electrical replacement, structural details provided for the electrical equipment. fire alarm/sprinklers under sep permits.
Details
Permit
202307071689
Permit issued
Apr 22, 2024

replace electrical switch gear and electrical equipmemt on the tenant floors provide minor plumbing and mechanical alterations to support the electrical replacement, structural details provided for the electrical equipment. fire alarm/sprinklers under sep permits.

Open the permit page

$1,500,000
Jun 8, 2023Never finaled
issued Jun 2023, no final
425 California StNovo Construction Incsuite 2400: mechanical & electrical t-24 compliance for t.i. under pa 202306019070. maher n/a
Details
Permit
202306089567
Permit issued
Jun 9, 2023

suite 2400: mechanical & electrical t-24 compliance for t.i. under pa 202306019070. maher n/a

Open the permit page

$50,000
May 16, 2023Completed
final sign-off Nov 2023
185 Berry StSkyline Construction4/f ste 4800: mep for tenant improvement, ref pa# 202304105357.
Details
Permit
202305167807
Permit issued
May 22, 2023
Final sign-off
Nov 30, 2023

4/f ste 4800: mep for tenant improvement, ref pa# 202304105357.

Open the permit page

$175,000
Feb 22, 2023Completed
final sign-off Jun 2023
1355 Market StRichlen Construction2/f suite 210: demolition and construction of non-load bearing partitions, doors, new lighting, millwork, and finishes.
Details
Permit
202302222385
Permit issued
Mar 6, 2023
Final sign-off
Jun 27, 2023

2/f suite 210: demolition and construction of non-load bearing partitions, doors, new lighting, millwork, and finishes.

Open the permit page

$700,000
Dec 30, 2022Completed
final sign-off Sep 2023
1 Market StSkyline Construction39/f: deferred mep permit for 202211307363.
Details
Permit
202212309585
Permit issued
Jan 11, 2023
Final sign-off
Sep 15, 2023

39/f: deferred mep permit for 202211307363.

Open the permit page

Oct 18, 2022Expired or cancelled
cancelled Jan 2026
1501 Tennessee Stto comply with access business entrance abe202003102554. 1st fl: barrier removal to create accessible entrance and means of egrees. new accessible lift to existing main entry door.
Details
Permit
202210184575

to comply with access business entrance abe202003102554. 1st fl: barrier removal to create accessible entrance and means of egrees. new accessible lift to existing main entry door.

Open the permit page

$10,000
Aug 23, 2022Expired or cancelled
cancelled Jan 2026
101 02nd St2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit.
Details
Permit
202208231073

2/f: non-structural demo. new non-structural partitions, door/frame/hardware, millwork, finishes. no change in occupancy, use or area. mep included in the set. life safety and sprinklers under separate permit.

Open the permit page

$211,514
Aug 19, 2022Completed
final sign-off May 2023
555 California StPrincipal Builders Inc.27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's.
Details
Permit
202208190901
Permit issued
Sep 13, 2022
Final sign-off
May 24, 2023

27/f: commercial t.i. new non-structural partitions, new acoustal ceilings, new finishes, new lighting, new restrooms including mep work and new fsd's.

Open the permit page

$3,120,000
Jun 16, 2022Completed
final sign-off Jun 2023
55 02nd StNovo Construction Inc24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg.
Details
Permit
202206166472
Permit issued
Jul 21, 2022
Final sign-off
Jun 8, 2023

24th fl - interior only non-structural tenant improvement to (e) office space; sow: wall reconfiguration, (n) finishes to match, mep, sprinkler & fire alarm. full alarmed and sprinklered bldg.

Open the permit page

$650,000
Jun 8, 2022Never finaled
issued Jun 2022, no final
71 Stevenson StMsr Mechanical Llcreplace one existing boiler with (2) modular boilers in penthouse.
Details
Permit
202206085846
Permit issued
Jun 10, 2022

replace one existing boiler with (2) modular boilers in penthouse.

Open the permit page

$120,000
May 12, 2022Completed
final sign-off Mar 2023
101 02nd StBcci Construction Company21st fl: partial floor tenant improvement. mep included. ref # 202108176536
Details
Permit
202205124159
Permit issued
Jun 1, 2022
Final sign-off
Mar 15, 2023

21st fl: partial floor tenant improvement. mep included. ref # 202108176536

Open the permit page

$210,000
May 3, 2022Completed
final sign-off May 2023
101 02nd StClune Construction Company L P24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.
Details
Permit
202205033424
Permit issued
Jun 15, 2022
Final sign-off
May 12, 2023

24th fl: office tenant improvement to include selective demolition, construction of employee breakroom / panyry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.

Open the permit page

$1,670,000
May 3, 2022Completed
final sign-off May 2023
101 02nd StClune Construction Company L P23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.
Details
Permit
202205033426
Permit issued
Jun 15, 2022
Final sign-off
May 12, 2023

23rd fl: office tenant improvement to include selective demolition, construction of employee breakroom/pantry. new non-structural partitions, finishes, ceiling, lighting, electrical and mechanical.

Open the permit page

$1,670,000
Aug 24, 2020Expired or cancelled
cancelled Jan 2026
1 Front Streplace a 1,200 ton induced draft cross flow cooling tower system on the roof.
Details
Permit
202008242517

replace a 1,200 ton induced draft cross flow cooling tower system on the roof.

Open the permit page

$215,000
Jun 5, 2019Expired or cancelled
cancelled Feb 2024
2215 Market Stground floor renovation, new ada restroom, new partitions and catering kitchen
Details
Permit
201906052587

ground floor renovation, new ada restroom, new partitions and catering kitchen

Open the permit page

$147,000
Dec 14, 2018Completed
final sign-off Jun 2023
333 Market StCity Building Inc.upgrade of the existing fuel system. replacement of existing pumps, piping, and day tanks. **maher n/a**
Details
Permit
201812148362
Permit issued
Jun 7, 2022
Final sign-off
Jun 13, 2023

upgrade of the existing fuel system. replacement of existing pumps, piping, and day tanks. **maher n/a**

Open the permit page

$400,000
May 4, 2016Completed
final sign-off Mar 2017
550 California StSkyline Construction4th floor: extg server room expansion with new hvac, ups and power distribution. n/a for maher
Details
Permit
201605046469
Permit issued
May 12, 2016
Final sign-off
Mar 14, 2017

4th floor: extg server room expansion with new hvac, ups and power distribution. n/a for maher

Open the permit page

$350,000
Nov 14, 2014Completed
final sign-off Jul 2017
550 California StW. Bradley Electricreplacement of(e) 480v bus duct riser distribution system which includes removal of (e) service switchboard 3 cables iwth new 480v calbe riser distriburion and switcher. maher/na
Details
Permit
201411141483
Permit issued
Jul 29, 2015
Final sign-off
Jul 13, 2017

replacement of(e) 480v bus duct riser distribution system which includes removal of (e) service switchboard 3 cables iwth new 480v calbe riser distriburion and switcher. maher/na

Open the permit page

$3,000,000