David Ojala
- License
- S5957
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S5957 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Mar 2020 to Nov 2026
4 permits since 2000 (engineer on 4 permits): 2 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Bcci Construction Company (2), Dome Construction Corp, The Whiting-Turner Contracting Company
- Architects
- David De Valeria, Jeffrey Keith Luney
- Engineers
- Antonio Jacksalem, Levi G. Abarte, Meng Hsiu Chen
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 555 California St | Bcci Construction Company | 51st flr - structural deferred submittal to support approved architectural permit. ref#: 202610059017Details
51st flr - structural deferred submittal to support approved architectural permit. ref#: 202610059017 | $50,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 555 California St | Bcci Construction Company | 51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms.Details
51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms. | $1,935,000 |
| Nov 3, 2023 | Completed final sign-off Jan 2025 | 982 Mission St | The Whiting-Turner Contracting Company | remodel of bldg & voluntary lateral force-resisting system alteration. accessibility upgrades.new ada ramp railing w/ relocating (e) stair exit door at lev 1.add rail at mezz.adding (n) wall out-of-plane & diaphram load transfer from diaphragm to braced frames. strengthen (e) collector connectn.Details
remodel of bldg & voluntary lateral force-resisting system alteration. accessibility upgrades.new ada ramp railing w/ relocating (e) stair exit door at lev 1.add rail at mezz.adding (n) wall out-of-plane & diaphram load transfer from diaphragm to braced frames. strengthen (e) collector connectn. | $1,792,526 |
| Mar 5, 2020 | Completed final sign-off Dec 2020 | 595 Market St | Dome Construction Corp | new stair finishes for existing exit access stair connecting floors 29 & 30, stair work consists of new finishes and minor structural detailing.Details
new stair finishes for existing exit access stair connecting floors 29 & 30, stair work consists of new finishes and minor structural detailing. | $400,000 |