David Ojala
- Listed as
- engineer
- On San Francisco permits
- Mar 2020 to Aug 2026
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Sep 2026 | 555 California St | Bcci Construction Company | 51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms.Details
51st floor: interior tenant improvment to replace private offices with open workstations and conference rooms. mep deferred. kitchen and stone wall under separate permit.remodel core restrooms. | $1,935,000 |
| Nov 3, 2023 | Completed final sign-off Jan 2025 | 982 Mission St | The Whiting-Turner Contracting Company | remodel of bldg & voluntary lateral force-resisting system alteration. accessibility upgrades.new ada ramp railing w/ relocating (e) stair exit door at lev 1.add rail at mezz.adding (n) wall out-of-plane & diaphram load transfer from diaphragm to braced frames. strengthen (e) collector connectn.Details
remodel of bldg & voluntary lateral force-resisting system alteration. accessibility upgrades.new ada ramp railing w/ relocating (e) stair exit door at lev 1.add rail at mezz.adding (n) wall out-of-plane & diaphram load transfer from diaphragm to braced frames. strengthen (e) collector connectn. | $1,792,526 |
| Mar 5, 2020 | Completed final sign-off Dec 2020 | 595 Market St | Dome Construction Corp | new stair finishes for existing exit access stair connecting floors 29 & 30, stair work consists of new finishes and minor structural detailing.Details
new stair finishes for existing exit access stair connecting floors 29 & 30, stair work consists of new finishes and minor structural detailing. | $400,000 |