Block 3721, lot 050
143 02nd St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 5
- Units
- 3
- Rooms
- 4 bathrooms
- Building
- 21,932 sq ft
- Lot
- 3,998 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
31 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2022 | Completed final sign-off Jul 2025 | 143 02nd St | Rise Rigging Llc | comply with facade ordinance inspection for subject property dated 04/05/2022. repairs of all conditions. items: repair of mortar, seal penetrations, remove of skin coat, replacement of out of plane brick, refasten existing coping.Details
comply with facade ordinance inspection for subject property dated 04/05/2022. repairs of all conditions. items: repair of mortar, seal penetrations, remove of skin coat, replacement of out of plane brick, refasten existing coping. | $50,000 |
| Jul 22, 2022 | Never finaled issued Jul 2022, no final | 143 02nd St | Rise Rigging Llc | exploratory openings in brick facde for review by structural engineer to prepare for the retrofit & strengthening work. two explatory openings 18"x18" max, one at east & one at west elevations, not visible from street. re-install brick to match existing after exploratory work is done.Details
exploratory openings in brick facde for review by structural engineer to prepare for the retrofit & strengthening work. two explatory openings 18"x18" max, one at east & one at west elevations, not visible from street. re-install brick to match existing after exploratory work is done. | $6,000 |
| Sep 9, 2021 | Completed final sign-off Feb 2022 | 143 02nd St | Constructive Solutions Inc. | 5/f -new t bar ceiling @ elevator lobby after (e) wall demolition (e) evac to be remainedDetails
5/f -new t bar ceiling @ elevator lobby after (e) wall demolition (e) evac to be remained | $20,000 |
| Sep 9, 2021 | Completed final sign-off Mar 2022 | 143 02nd St | San Francisco Fire Protection | due to t.i on the 5/f, one exist smoke detector will be relocate from wall to ceiling mount and one smoke curtain relay will be install. ref pa# 201403140766 and #201503039750Details
due to t.i on the 5/f, one exist smoke detector will be relocate from wall to ceiling mount and one smoke curtain relay will be install. ref pa# 201403140766 and #201503039750 | $1,200 |
| Dec 3, 2019 | Completed final sign-off Jan 2020 | 143 02nd St | Hp Build | revision to 201908290216 to correct reflected ceiling planDetails
revision to 201908290216 to correct reflected ceiling plan | |
| Nov 21, 2019 | Completed final sign-off Jan 2020 | 143 02nd St | Hp Build | 2nd fl - mechenical & electrical for project 2019-0829-0216 also cover correction for deferred submittal listDetails
2nd fl - mechenical & electrical for project 2019-0829-0216 also cover correction for deferred submittal list | |
| Oct 15, 2019 | Completed final sign-off Jan 2020 | 143 02nd St | Constructive Solutions Inc. | basement structural repair. maher n/a.Details
basement structural repair. maher n/a. | $14,965 |
| Sep 19, 2019 | Never finaled issued Sep 2019, no final | 143 02nd St | street spaceDetails
street space | ||
| Aug 29, 2019 | Completed final sign-off Jan 2020 | 143 02nd St | Hp Build | 2/f - interior alteration of tenant space. minor remodel of 2500 sf ofc the 3560 sf (mep/fire/life safety under sep permit if needed). operable partition under separate permit.Details
2/f - interior alteration of tenant space. minor remodel of 2500 sf ofc the 3560 sf (mep/fire/life safety under sep permit if needed). operable partition under separate permit. | $600,000 |
| Jul 5, 2019 | Expired or cancelled cancelled Oct 2019 | 143 02nd St | Constructive Solutions Inc. | 2nd flr. accessible barrier removal for a restroom. maher n/a.Details
2nd flr. accessible barrier removal for a restroom. maher n/a. | $24,965 |
| Jan 11, 2018 | Completed final sign-off May 2021 | 141 02nd St | Phoenix Electric Co. | new pedestrian light pole support at sub-sidewalk basement. maher naDetails
new pedestrian light pole support at sub-sidewalk basement. maher na | $10,000 |
| Mar 20, 2015 | Never finaled issued Mar 2015, no final | 143 02nd St | P 3 Construction & Remodeling Inc | lighting & power t.i. ref. to pa#201503039790. n/a ordinance #155-13Details
lighting & power t.i. ref. to pa#201503039790. n/a ordinance #155-13 | $25,000 |
| Mar 3, 2015 | Never finaled issued Mar 2015, no final | 143 02nd St | P 3 Construction & Remodeling Inc | revision to pa# 2015 0102 4855 plan layout change to move (1) office to westside. install fire/smoke door at elevator. maher - not req'dDetails
revision to pa# 2015 0102 4855 plan layout change to move (1) office to westside. install fire/smoke door at elevator. maher - not req'd | |
| Feb 23, 2015 | Completed final sign-off Mar 2015 | 145 02nd St | International Fire Equip | install ul300 fire system, ref. 201409257368; maher n/aDetails
install ul300 fire system, ref. 201409257368; maher n/a | $3,000 |
| Jan 2, 2015 | Never finaled issued Jan 2015, no final | 143 02nd St | P 3 Construction & Remodeling Inc | tenant improvement, 4th flr: new partitions at office & conference rooms, new power distribution, replace (e) bar sink; maher n/a; sprinkler under separate permitDetails
tenant improvement, 4th flr: new partitions at office & conference rooms, new power distribution, replace (e) bar sink; maher n/a; sprinkler under separate permit | $250,000 |
| Sep 25, 2014 | Completed final sign-off Mar 2015 | 145 02nd St | Bradford Construction | interior t.i. no change of use. no exterior work, alterations to non-bearing interior walls, new dining counter, alterations to extg soffits, new finishes, mep under seperate permit, alterations to extg restroom for accessibility. n/a for the maher ordinance #155-13Details
interior t.i. no change of use. no exterior work, alterations to non-bearing interior walls, new dining counter, alterations to extg soffits, new finishes, mep under seperate permit, alterations to extg restroom for accessibility. n/a for the maher ordinance #155-13 | $150,000 |
| Mar 14, 2014 | Completed final sign-off May 2014 | 143 02nd St | San Francisco Fire Protection | like for like voluntary stand alone elevator recall and supervisory control unit replacement to accomodate elevator modernization. replace existing 6 smoke detectors with new at the same location. maher ordinance # 155-13 does not applyDetails
like for like voluntary stand alone elevator recall and supervisory control unit replacement to accomodate elevator modernization. replace existing 6 smoke detectors with new at the same location. maher ordinance # 155-13 does not apply | $2,800 |
| Feb 5, 2014 | Never finaled issued Feb 2014, no final | 143 02nd St | street space and mta permitDetails
street space and mta permit | ||
| Nov 25, 2013 | Completed final sign-off Apr 2014 | 143 02nd St | P 3 Construction & Remodeling Inc | tenant improvements. interior drywall and glass partitions. millwork lighting and floor finishes. compliance with ordiance no. 155-13 not required.Details
tenant improvements. interior drywall and glass partitions. millwork lighting and floor finishes. compliance with ordiance no. 155-13 not required. | $62,000 |
| Oct 17, 2012 | Never finaled issued Aug 2013, no final | 145 02nd St | erect non-electric, projecting, doubled-faced, non-illuminated, replacement sign.Details
erect non-electric, projecting, doubled-faced, non-illuminated, replacement sign. | $2,000 | |
| Oct 2, 2012 | Never finaled issued Oct 2012, no final | 143 02nd St | Rudolph Caler/Lumen Electric | electrical work. add plugs and lighting ref ti 201208016258Details
electrical work. add plugs and lighting ref ti 201208016258 | $14,000 |
| Sep 13, 2012 | Completed final sign-off Jan 2013 | 143 02nd St | Rudolph Commercial Interiors Inc, Rci | #5, 5th floor-demo of ceiling height partitions & construction of new full height partitions, finishes, doors as well as some path of travel upgrades. mechanical, electrical, fire alarm, sprinklers on seperate permitDetails
#5, 5th floor-demo of ceiling height partitions & construction of new full height partitions, finishes, doors as well as some path of travel upgrades. mechanical, electrical, fire alarm, sprinklers on seperate permit | $64,500 |
| Aug 1, 2012 | Completed final sign-off Jan 2013 | 143 02nd St | Rudolph Commercial Interiors Inc, Rci | 3rd floor-demolition of some (e) ceiling height partitions, construction of new full height partitions & finishes. upgrade of associated path of travel issues for tenant improvement workDetails
3rd floor-demolition of some (e) ceiling height partitions, construction of new full height partitions & finishes. upgrade of associated path of travel issues for tenant improvement work | $73,176 |
| May 17, 2012 | Never finaled issued May 2012, no final | 143 02nd St | Rudolph Caler/Lumen Electric | 2nd floor - new lighting & power, 2 ac units, ref pa #2012.0501.9470Details
2nd floor - new lighting & power, 2 ac units, ref pa #2012.0501.9470 | $38,000 |
| May 1, 2012 | Completed final sign-off Jan 2013 | 143 02nd St | Rudolph Commercial Interiors Inc, Rci | non structural demo. new non structural partitions, lighting, electrical, finishes. new toilet room. no change in use, area, occupancy. mep separate permitDetails
non structural demo. new non structural partitions, lighting, electrical, finishes. new toilet room. no change in use, area, occupancy. mep separate permit | $87,000 |
| May 21, 2008 | Never finaled issued May 2008, no final | 143 02nd St | Bbc Construction Inc. | t.i. portion of (e) wall to be removed, new full height wall to subdive entire 2nd floor into 2 separate areas. two accessible single restrooms with access throught the common lobby.Details
t.i. portion of (e) wall to be removed, new full height wall to subdive entire 2nd floor into 2 separate areas. two accessible single restrooms with access throught the common lobby. | $32,000 |
| Sep 9, 2005 | Never finaled issued Sep 2005, no final | 145 02nd St | street space permitDetails
street space permit | ||
| Jul 15, 2005 | Expired or cancelled expired Jun 2007 | 145 02nd St | remodel of existing space, drywall partitions, acoustic ceilings, doors. elec & mech under separateDetails
remodel of existing space, drywall partitions, acoustic ceilings, doors. elec & mech under separate | $74,000 | |
| Jul 15, 2005 | Never finaled issued Jul 2005, no final | 145 02nd St | street spaceDetails
street space | ||
| Jun 28, 2005 | Completed final sign-off Jul 2005 | 145 02nd St | interior demo, partitin walls and fixtures, non structural on ground floorDetails
interior demo, partitin walls and fixtures, non structural on ground floor | $5,000 | |
| May 13, 2004 | Never finaled issued Jun 2004, no final | 141 02nd St | Webcor Construction Inc. | provide the backs per plan to shore bldg adjacent to new constr'n under pa#9904253 & 200312162431.Details
provide the backs per plan to shore bldg adjacent to new constr'n under pa#9904253 & 200312162431. | $7,000 |