Design Build Develp. Stru
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jul 2003
- Last 24 months
- 0 permits filed
34 permits since 2000: 23 completed, 11 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2003 | Completed final sign-off Mar 2004 | 501 02nd St | oti-2 4th floor, me, ls, elDetails
oti-2 4th floor, me, ls, el | |
| May 30, 2003 | Completed final sign-off Mar 2004 | 501 02nd St | unoccupied interior demoDetails
unoccupied interior demo | $42,000 |
| May 30, 2003 | Completed final sign-off Mar 2004 | 501 02nd St | #400- oti-1, new demizing wall at (e) space, add new elect panel to seperate adjacent spaceDetails
#400- oti-1, new demizing wall at (e) space, add new elect panel to seperate adjacent space | $36,000 |
| Dec 6, 2002 | Completed final sign-off Dec 2002 | 1303 Evans Av | construct 1 new office seperation wall, no new lighting & no increase of wattageDetails
construct 1 new office seperation wall, no new lighting & no increase of wattage | $1,600 |
| Nov 5, 2002 | Completed final sign-off May 2003 | 2225 Jerrold Av | voluntary seismic upgrade of (e) bldg., accessibility upgrades as listed on plansDetails
voluntary seismic upgrade of (e) bldg., accessibility upgrades as listed on plans | $320,000 |
| Oct 24, 2002 | Completed final sign-off Mar 2003 | 131 Steuart St | voluntary upgrade to common area doors for ratings and accessiblity onlyDetails
voluntary upgrade to common area doors for ratings and accessiblity only | $39,000 |
| Oct 4, 2002 | Expired or cancelled cancelled Oct 2003 | 3450 03rd St | 3/f- floor framing onlyDetails
3/f- floor framing only | $30,000 |
| May 24, 2002 | Completed final sign-off Aug 2002 | 139 Townsend St | oti-2 revised 5th floor-lsDetails
oti-2 revised 5th floor-ls | |
| Mar 12, 2002 | Completed final sign-off Jun 2002 | 360 Spear St | oti-2, 1st flr, el,me,spDetails
oti-2, 1st flr, el,me,sp | $8,000 |
| Feb 28, 2002 | Completed final sign-off Jun 2002 | 360 Spear St | oti-1 1st floor el me ls spDetails
oti-1 1st floor el me ls sp | $40,000 |
| Dec 12, 2001 | Completed final sign-off May 2002 | 501 02nd St | re-rout ductwork and new fire smoke dampersDetails
re-rout ductwork and new fire smoke dampers | $10,000 |
| Nov 20, 2001 | Expired or cancelled cancelled Aug 2002 | 501 02nd St | demo of (e) interior partitions ceiling plumbing (at break rm) add finishes thruout suite 415 on 4/fDetails
demo of (e) interior partitions ceiling plumbing (at break rm) add finishes thruout suite 415 on 4/f | $30,000 |
| Oct 15, 2001 | Expired or cancelled expired Feb 2004 | 131 Steuart St | repair waterproofing under existing rooftop equipments, elec & plumbn disconnect-reconnect is requirDetails
repair waterproofing under existing rooftop equipments, elec & plumbn disconnect-reconnect is requir | $15,000 |
| Aug 3, 2001 | Completed final sign-off Aug 2002 | 139 Townsend St | oti-2 5th flr-el,me,ls,spDetails
oti-2 5th flr-el,me,ls,sp | $120,000 |
| Aug 2, 2001 | Completed final sign-off Aug 2002 | 139 Townsend St | oti-1, 5th flr - el,me,ls,spDetails
oti-1, 5th flr - el,me,ls,sp | $120,000 |
| Apr 26, 2001 | Completed final sign-off Jul 2001 | 139 Townsend St | oti-2 1st floor el me ls spDetails
oti-2 1st floor el me ls sp | $250,000 |
| Apr 26, 2001 | Completed final sign-off Jul 2001 | 139 Townsend St | oti-2 mezannine el me sp l/sDetails
oti-2 mezannine el me sp l/s | $150,000 |
| Mar 30, 2001 | Completed final sign-off Jul 2001 | 139 Townsend St | oti-1 mess & g/floor, ltg, mech, ls, sprDetails
oti-1 mess & g/floor, ltg, mech, ls, spr | $60,000 |
| Mar 30, 2001 | Completed final sign-off Jul 2001 | 139 Townsend St | oti-1, 1st floor, el, me, ls, spDetails
oti-1, 1st floor, el, me, ls, sp | $200,000 |
| Mar 20, 2001 | Expired or cancelled expired Sep 2003 | 182 02nd St | renew to pa #200003245356Details
renew to pa #200003245356 | |
| Mar 20, 2001 | Expired or cancelled expired Jul 2001 | 182 02nd St | renew pa 200003245355, 8712756 & 8602442 for final inspectionDetails
renew pa 200003245355, 8712756 & 8602442 for final inspection | |
| Mar 20, 2001 | Expired or cancelled expired Sep 2003 | 182 02nd St | renew appn. #2000-06-01-2323/2000-07-29-6461Details
renew appn. #2000-06-01-2323/2000-07-29-6461 | |
| Mar 20, 2001 | Expired or cancelled expired Jul 2001 | 182 02nd St | renew for pa #200003245358Details
renew for pa #200003245358 | |
| Mar 20, 2001 | Expired or cancelled expired Jul 2001 | 182 02nd St | renew appn. 200004056510Details
renew appn. 200004056510 | |
| Mar 20, 2001 | Completed final sign-off Mar 2001 | 182 02nd St | renew for pa #200004-05-6458Details
renew for pa #200004-05-6458 | |
| Feb 14, 2001 | Completed final sign-off May 2001 | 625 Market St | seismic bracing - structural) revision to app#200005028771Details
seismic bracing - structural) revision to app#200005028771 | $500 |
| Jan 18, 2001 | Completed final sign-off May 2001 | 625 Market St | oti-3 2nd flr lsDetails
oti-3 2nd flr ls | $1,000 |
| Jan 17, 2001 | Completed final sign-off May 2001 | 625 Market St | oti-2 revision 2nd floor el,me,spDetails
oti-2 revision 2nd floor el,me,sp | $6,000 |
| Jan 8, 2001 | Completed final sign-off May 2001 | 625 Market St | life safety on basement only, seismic retrofit project under appr.#200005028771Details
life safety on basement only, seismic retrofit project under appr.#200005028771 | $2,000 |
| Oct 17, 2000 | Completed final sign-off May 2001 | 625 Market St | oti-2 2nd floor electrical,mechanical,lifesafty,sprinklerDetails
oti-2 2nd floor electrical,mechanical,lifesafty,sprinkler | $28,500 |
| Jul 24, 2000 | Completed final sign-off Aug 2000 | 333 Market St | ammend permit #913141/appn. 200006132477(add 2 sprinkler hds)Details
ammend permit #913141/appn. 200006132477(add 2 sprinkler hds) | $500 |
| Jun 28, 2000 | Expired or cancelled expired Apr 2001 | 800 Chestnut St | renew expired appn. 9912997Details
renew expired appn. 9912997 | |
| Jun 28, 2000 | Expired or cancelled expired Apr 2001 | 800 Chestnut St | renew expired appn. 9916987Details
renew expired appn. 9916987 | |
| Mar 24, 2000 | Expired or cancelled expired Sep 2000 | 800 Chestnut St | rev to pa-9911657- add two new 4 by 8 metal windows in existing wall in existing classroom (faces exDetails
rev to pa-9911657- add two new 4 by 8 metal windows in existing wall in existing classroom (faces ex | $8,000 |