19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 7, 2025 | Completed final sign-off Apr 2026 | 280 Spear St | Baxter Construction | apt 39b: open drywall in 3 bathrooms to accomodate plumbing, remove and replace three toilets, two tubs. all in kind.Details
apt 39b: open drywall in 3 bathrooms to accomodate plumbing, remove and replace three toilets, two tubs. all in kind. | $45,000 |
| Aug 1, 2023 | Completed final sign-off Dec 2023 | 280 Spear St | Dawson Electric, Inc. | red cloud to replace automac & reprogram current bda to sf upgradeed frequenciesDetails
red cloud to replace automac & reprogram current bda to sf upgradeed frequencies | $14,000 |
| Jan 9, 2023 | Completed final sign-off Apr 2023 | 280 Spear St | Baxter Construction | #40c: revision to pa#202010136398' additional permit for increase valuation of project. same scope of work as previous permit. modify extg ceilings to accomodate new lighting, remodel kitchen, powder room, master bath and laundry room. all plmg locations remain the same. no relocation.Details
#40c: revision to pa#202010136398' additional permit for increase valuation of project. same scope of work as previous permit. modify extg ceilings to accomodate new lighting, remodel kitchen, powder room, master bath and laundry room. all plmg locations remain the same. no relocation. | $115,000 |
| Aug 30, 2022 | Never finaled issued Aug 2022, no final | 280 Spear St | Pacific Auxiliary Fire Alarm | 1st fl: fire alarm t.i.. adding 4 speaker-strobes and 2 duct detectors to (e) notifier nfs2-3030 fire alarm system. ref pa# 202204071791.Details
1st fl: fire alarm t.i.. adding 4 speaker-strobes and 2 duct detectors to (e) notifier nfs2-3030 fire alarm system. ref pa# 202204071791. | $13,578 |
| Aug 26, 2022 | Completed final sign-off Oct 2022 | 280 Spear St | Allied Fire Protection | 280 spear st. #1b: add (11) ssp sprinkers from (11) (e) ssu shell sprinkles to accomodate modified lightng and calings add (1) ssu from (e) ssu (exposed) plug (2) (e) ssu sprinklers above new ceilingDetails
280 spear st. #1b: add (11) ssp sprinkers from (11) (e) ssu shell sprinkles to accomodate modified lightng and calings add (1) ssu from (e) ssu (exposed) plug (2) (e) ssu sprinklers above new ceiling | $12,500 |
| May 11, 2022 | Completed final sign-off Sep 2022 | 280 Spear St | Air Perfection Heating & Air Condition | ground fl: installation of a hvac heat pump system, ductings, and associated componenets. ref pa# 202203049293.Details
ground fl: installation of a hvac heat pump system, ductings, and associated componenets. ref pa# 202203049293. | $70,000 |
| May 2, 2022 | Completed final sign-off Jul 2022 | 280 Spear St | Allied Fire Protection | add 14 fire sprinklers from (e) shell sprinkler system to new suspended ceilingsDetails
add 14 fire sprinklers from (e) shell sprinkler system to new suspended ceilings | $9,870 |
| Apr 7, 2022 | Completed final sign-off Dec 2022 | 280 Spear St | Cookline Construction Inc | ground fl/ ste #1b t.i. non bearing interior walls- mep systems, wine bar and cabinets, brear room.Details
ground fl/ ste #1b t.i. non bearing interior walls- mep systems, wine bar and cabinets, brear room. | $142,000 |
| Mar 4, 2022 | Completed final sign-off Sep 2022 | 280 Spear St | Bbc Construction Inc. | commercial space 1a: t.i. for new optometry: 3 exam rooms, lab,pantry and retail. electrical, life/safety,mechanical, plumbing and sprinkler work under sep permit.Details
commercial space 1a: t.i. for new optometry: 3 exam rooms, lab,pantry and retail. electrical, life/safety,mechanical, plumbing and sprinkler work under sep permit. | $175,000 |
| Oct 5, 2021 | Completed final sign-off Oct 2021 | 280 Spear St | Allied Fire Protection | 40/f #40c: relocate (9) existing ssp sprinklers for new & relocate walls & ceilings. ref pa#202010136398. future block/lot will be 3740434Details
40/f #40c: relocate (9) existing ssp sprinklers for new & relocate walls & ceilings. ref pa#202010136398. future block/lot will be 3740434 | $8,500 |
| Aug 19, 2021 | Completed final sign-off May 2022 | 280 Spear St | Baxter Construction | #35e: open drywall to accomodate electrical work. new track released lighting thoughout. approx. 2'x2' each area. repair in-kind.Details
#35e: open drywall to accomodate electrical work. new track released lighting thoughout. approx. 2'x2' each area. repair in-kind. | $19,000 |
| May 24, 2021 | Completed final sign-off Jul 2021 | 285 Main St | Rozen Home Builders Inc | block/lot is 3740/075: unit 208: replace (e) laminated flooring on living room and bedrooms.rpelace (e) tub, demo (e) tile only. install 2 new receptacles at living room. no structural work. no framing modifiation.Details
block/lot is 3740/075: unit 208: replace (e) laminated flooring on living room and bedrooms.rpelace (e) tub, demo (e) tile only. install 2 new receptacles at living room. no structural work. no framing modifiation. | $12,500 |
| Oct 13, 2020 | Completed final sign-off Apr 2023 | 280 Spear St | Baxter Construction | unit 40c: modify existing ceiligs to accomodate new lighting, remodel kitchen, powder room, master bath and laundry room. all plumbing locations to remain the same. no relocation.Details
unit 40c: modify existing ceiligs to accomodate new lighting, remodel kitchen, powder room, master bath and laundry room. all plumbing locations to remain the same. no relocation. | $85,000 |
| Aug 21, 2020 | Completed final sign-off Dec 2020 | 280 Spear St | Aaron Gordon Construction Inc | condo#34e: remove existing backsplash & countertops in the kitchen.replace in kind metal framed non load bearing drop down ceiling in the living room & two bedrooms. gypsum boad finish,install 8ea can lights,paint. **maher n/a**Details
condo#34e: remove existing backsplash & countertops in the kitchen.replace in kind metal framed non load bearing drop down ceiling in the living room & two bedrooms. gypsum boad finish,install 8ea can lights,paint. **maher n/a** | $25,000 |
| Jun 15, 2020 | Completed final sign-off Mar 2021 | 150 Folsom St | Bhogal Brothers Construction Inc | new t-bar ceiling, lighting and mechanical fixture within a fitness studio on the ground floor.Details
new t-bar ceiling, lighting and mechanical fixture within a fitness studio on the ground floor. | $29,375 |
| Apr 5, 2018 | Never finaled issued Apr 2018, no final | 265 Main St | per pa #201405259481, add resses to block 3740, lot 027 as; 265b, 265c, 265d, 265e, 265f main streetDetails
per pa #201405259481, add resses to block 3740, lot 027 as; 265b, 265c, 265d, 265e, 265f main street | ||
| Apr 5, 2018 | Never finaled issued Apr 2018, no final | 140 Folsom St | per pa #201405259481, add resses to block 3740, lot 027 as; 140, 150 folsom st, 265, 275, 285a main street.Details
per pa #201405259481, add resses to block 3740, lot 027 as; 140, 150 folsom st, 265, 275, 285a main street. | ||
| Apr 5, 2018 | Never finaled issued Apr 2018, no final | 110 Folsom St | per pa #201405259481, add resses to block 3740, lot 027 as; 270, 280 spear street & 110, 120,130, folsom streetDetails
per pa #201405259481, add resses to block 3740, lot 027 as; 270, 280 spear street & 110, 120,130, folsom street | ||
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 235 Main St | per occi, create new address to block 3740, lot 027 as; 235 main streetDetails
per occi, create new address to block 3740, lot 027 as; 235 main street |