Block 0849, lot 023
573 Page St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 20, 2024 | Completed final sign-off Jun 2024 | 573 Page St | E & E General Builder Inc | existing split bath to be made into a bath & half with the addition of a toilet in the main bath & a small sink in the water closet, plumbing will be relocated for the additional toilet & for moving the tub & adding the sink. a nw ceiling fan & 3 can lights are the only electrical change. n0 strctrDetails
existing split bath to be made into a bath & half with the addition of a toilet in the main bath & a small sink in the water closet, plumbing will be relocated for the additional toilet & for moving the tub & adding the sink. a nw ceiling fan & 3 can lights are the only electrical change. n0 strctr | $20,000 |
| Feb 8, 2024 | Completed final sign-off Feb 2024 | 575 Page St | Velox Construction Inc/Velox Des & Const | water damage build back in kind. two locatin 25 sqft pert location. existing fire reated drywall to remain.Details
water damage build back in kind. two locatin 25 sqft pert location. existing fire reated drywall to remain. | $5,000 |
| Dec 12, 2023 | Completed final sign-off Apr 2024 | 577 Page St | Velox Construction Inc/Velox Des & Const | bathroom renovation with new shower and tile sub panel upgrade to include new dedicated circuit for bathroomDetails
bathroom renovation with new shower and tile sub panel upgrade to include new dedicated circuit for bathroom | $25,000 |
| Nov 16, 2017 | Never finaled issued Nov 2017, no final | 573 Page St | street spaceDetails
street space | ||
| Oct 11, 2017 | Never finaled issued Oct 2017, no final | 573 Page St | street spaceDetails
street space | ||
| Aug 2, 2017 | Completed final sign-off Dec 2017 | 573 Page St | Hakewill Construction Co. Inc. | remove damaged siding at west side lightwell & south facade replace with new siding. repair dryrot at existing decks and stairs at south side of building less than 50%Details
remove damaged siding at west side lightwell & south facade replace with new siding. repair dryrot at existing decks and stairs at south side of building less than 50% | $50,000 |
| Nov 13, 2006 | Completed final sign-off Dec 2006 | 573 Page St | Sears Home Improvemt Prod, | renew 200606133818 for final only.Details
renew 200606133818 for final only. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.