Block 2612, lot 046
1045 14th St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 4
- Rooms
- 5 bathrooms
- Building
- 3,953 sq ft
- Lot
- 3,449 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 11, 2026 | In progress issued Sep 2026 | 1045 14th St | Vnb Engineering Inc | build 2-3 soil segregation bins in rear yard of 2x materials, 30" tall,remove previously excavated soil from storage area to bins and cover to assess hard soil. demo sheet rock to perform exploratory work in future. close sheetrock openings and fire tape/cauld as appropriate,repair rear stairs <50%Details
build 2-3 soil segregation bins in rear yard of 2x materials, 30" tall,remove previously excavated soil from storage area to bins and cover to assess hard soil. demo sheet rock to perform exploratory work in future. close sheetrock openings and fire tape/cauld as appropriate,repair rear stairs <50% | $5,000 |
| May 8, 2026 | In progress issued May 2026 | 1047 14th St | Xteam Design Construction | remove and replace ceiling and wall covering throughout unit in kind with 5/8" type x sheet rock. approx 2,400 sq ft.Details
remove and replace ceiling and wall covering throughout unit in kind with 5/8" type x sheet rock. approx 2,400 sq ft. | $9,000 |
| Apr 21, 2026 | In progress issued Aug 2026 | 1047 14th St | Xteam Design Construction | unit 1047: add new bath to e) bedroom 1, add new bathroom @ e) bathroom, convert e) living rm to new bedroom, kitchen relocationDetails
unit 1047: add new bath to e) bedroom 1, add new bathroom @ e) bathroom, convert e) living rm to new bedroom, kitchen relocation | $40,000 |
| Dec 10, 2024 | In progress issued Mar 2025 | 1045 14th St | O'toole Construction Inc. | 1) replace failing retaining wall at front of the property. 2)create new storage space. 3)estimated excavation is 45 cubic yards. 4) sequenced excavation for replacement retaining wall.Details
1) replace failing retaining wall at front of the property. 2)create new storage space. 3)estimated excavation is 45 cubic yards. 4) sequenced excavation for replacement retaining wall. | $200,000 |
| Apr 12, 2024 | In progress issued Apr 2024 | 1045 14th St | exploratory permit to investiaget sagging in ground level floor aat front of building. all work to be patched and repaired upon completion of exploration.Details
exploratory permit to investiaget sagging in ground level floor aat front of building. all work to be patched and repaired upon completion of exploration. | $1,000 | |
| Mar 5, 2024 | In progress issued Mar 2024 | 1045 14th St | All Star Fire Protection Llc | install new fire sprinklers per nfpa 13r thru new unit at basement & partial first fl. including 2" dedicated service. ref to 201912048594Details
install new fire sprinklers per nfpa 13r thru new unit at basement & partial first fl. including 2" dedicated service. ref to 201912048594 | $13,500 |
| May 13, 2022 | Never finaled issued May 2022, no final | 1045 14th St | Velox Construction Inc/Velox Des & Const | unit #1045a :revision to stairs and windows. ref# bpa#2019-1204-8594Details
unit #1045a :revision to stairs and windows. ref# bpa#2019-1204-8594 | |
| Oct 13, 2021 | Never finaled issued Oct 2021, no final | 1045 14th St | Velox Construction Inc/Velox Des & Const | foundation rev to pa 201912048594 and 202106102149Details
foundation rev to pa 201912048594 and 202106102149 | |
| Jun 10, 2021 | Never finaled issued Jul 2021, no final | 1045 14th St | Velox Construction Inc/Velox Des & Const | to comply with nov #202033220 - foundation revision to pa #2021912048594Details
to comply with nov #202033220 - foundation revision to pa #2021912048594 | $50,000 |
| Dec 4, 2019 | Never finaled issued Feb 2020, no final | 1045 14th St | Hymac Construction Inc | unit #1045a 1st floor: remodel/relocate existing bathroom and kitchen. at basement, modify existing floor space to 2 new bedrooms, new family, 2 new bathrooms, and new interior stair for unit #1045a.Details
unit #1045a 1st floor: remodel/relocate existing bathroom and kitchen. at basement, modify existing floor space to 2 new bedrooms, new family, 2 new bathrooms, and new interior stair for unit #1045a. | $120,000 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 1045 14th St | street space permitDetails
street space permit | ||
| Mar 11, 2004 | Completed final sign-off Mar 2004 | 1045 14th St | replace 2 patio doors in back of the house aluminum sliding door. to comply with item#4 on nov#Details
replace 2 patio doors in back of the house aluminum sliding door. to comply with item#4 on nov# | $3,500 | |
| Jun 12, 2002 | Completed final sign-off Sep 2002 | 1045 14th St | Mullins General Construction & Fine Pain | repair dry rot on rear stairs and landingsDetails
repair dry rot on rear stairs and landings | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Velox Construction Inc/Velox Des & Const (3), Xteam Design Construction (2), All Star Fire Protection Llc, Hymac Construction Inc, Mullins General Construction & Fine Pain, O'toole Construction Inc., Vnb Engineering Inc
- Architects
- Bill Xie Guan
- Engineers
- Sergio Mayorga (2), Erwin Otoole
- Authorized agent-otherss
- Ross Larson
- Designers
- Kenneth King Ung
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.