Sergio Mayorga
- Listed as
- architect, authorized agent-others, engineer
- On San Francisco permits
- Jan 2022 to Aug 2026
10 permits since 2000 (engineer on 8 permits, architect on 2 permits, authorized agent-others on 1 permit): 6 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2026 | Completed final sign-off Sep 2026 | 651 29th Av | Cliff Point Construction Inc | revision to pa# 202603107298. documentation of 3rd party special inspections in lieu of sfbc 108a.5.4 and eor report in reference to nov #202648939Details
revision to pa# 202603107298. documentation of 3rd party special inspections in lieu of sfbc 108a.5.4 and eor report in reference to nov #202648939 | |
| May 27, 2026 | Expired or cancelled withdrawn Sep 2026 | 712 Silliman St | erect a one-story, type 5, rear storage shed.Details
erect a one-story, type 5, rear storage shed. | $20,000 | |
| Mar 10, 2026 | Completed final sign-off Sep 2026 | 651 29th Av | Cliff Point Construction Inc | add two skylights, add plaster walls in rear yard. repair and replace front stairs in kind add mechanical room in garage. violation 202648939Details
add two skylights, add plaster walls in rear yard. repair and replace front stairs in kind add mechanical room in garage. violation 202648939 | $39,740 |
| Dec 11, 2025 | In progress filed Dec 2025, not yet issued | 651 29th Av | Cliff Point Construction Inc | add two skylights.Details
add two skylights. | $500 |
| Sep 3, 2025 | In progress issued Sep 2025 | 1530 Leavenworth St | K Bali Construction | revision to pa # 2025-0630-9810. units 1, 2, 3 & 4. (e) kitchen relocation (e) bathroom remodel. (n) washer and dryer- convert (e) kitchen into (n) office.Details
revision to pa # 2025-0630-9810. units 1, 2, 3 & 4. (e) kitchen relocation (e) bathroom remodel. (n) washer and dryer- convert (e) kitchen into (n) office. | $28,000 |
| Aug 29, 2025 | Completed final sign-off Sep 2026 | 651 29th Av | Cliff Point Construction Inc | kitchen remodel. add island, bring up to code, open wall between living room & kitchen, add laundry nook, 3 bath remodel. 2nd fl: one bathroom added, all low flow fixtures, add sliding door on 1st fl. add led lights in rooms. bring electrical to code, install heat pump, repair & replace plumbingDetails
kitchen remodel. add island, bring up to code, open wall between living room & kitchen, add laundry nook, 3 bath remodel. 2nd fl: one bathroom added, all low flow fixtures, add sliding door on 1st fl. add led lights in rooms. bring electrical to code, install heat pump, repair & replace plumbing | $56,730 |
| Jun 13, 2025 | Completed final sign-off Sep 2025 | 1145 Wisconsin St | A M C Builders Inc. | revision to pa 2024-0731-7667 (n) foundation at rear wall (e) stairs framing repair. (n) dormer framing revisionDetails
revision to pa 2024-0731-7667 (n) foundation at rear wall (e) stairs framing repair. (n) dormer framing revision | $8,000 |
| Oct 23, 2024 | Completed final sign-off Sep 2025 | 1145 Wisconsin St | A M C Builders Inc. | addition of (n), 2 (n) bathrooms & family room on 1st fl. relocate (e) bedroom & (e) bathroom & remodel (e) kitchen on 2nd fl. remodel (e) bedroom and addition of (n) bathroom at attic. (n) dormer on roof.Details
addition of (n), 2 (n) bathrooms & family room on 1st fl. relocate (e) bedroom & (e) bathroom & remodel (e) kitchen on 2nd fl. remodel (e) bedroom and addition of (n) bathroom at attic. (n) dormer on roof. | $150,000 |
| Oct 5, 2022 | Completed final sign-off Mar 2025 | 2315 Sacramento St | Velox Construction Inc/Velox Des & Const | 1st/f unit 1: remodel & relocate (e) kitchen & bathroom. addition of 2 (n) baths & laundry. relocate (e) bedroom, addition of (n) bedroom. 2nd/f unit 2: remodel & relocate (e) kitchen & bathroom. addition of 2 (n) baths & laundry. relocate (e) bedroom, addition of 2 (n) bedroom.Details
1st/f unit 1: remodel & relocate (e) kitchen & bathroom. addition of 2 (n) baths & laundry. relocate (e) bedroom, addition of (n) bedroom. 2nd/f unit 2: remodel & relocate (e) kitchen & bathroom. addition of 2 (n) baths & laundry. relocate (e) bedroom, addition of 2 (n) bedroom. | $150,000 |
| Jan 14, 2022 | Never finaled issued Mar 2022, no final | 819 Valencia St | Bic Construction Inc | building a bar for hard liquor, building a counter, add all necessary plumbing and electrical work to install all necessary equipments.Details
building a bar for hard liquor, building a counter, add all necessary plumbing and electrical work to install all necessary equipments. | $10,000 |