Living Home Construction Inc
- Based in
- Berkeley
- On San Francisco permits
- Dec 2017 to Mar 2020
- Last 24 months
- 0 permits filed
13 permits since 2000: 6 completed, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2020 | Never finaled issued Mar 2020, no final | 190 Cervantes Bl | apt 101 : bathroom remodeling. like for like, no changing of the lay out. convert tub to shower, upgrade electric, mech, plumbing up to code.Details
apt 101 : bathroom remodeling. like for like, no changing of the lay out. convert tub to shower, upgrade electric, mech, plumbing up to code. | $10,000 |
| Oct 3, 2019 | Completed final sign-off Feb 2020 | 435 Mangels Av | revision to pa#2019-0725-6954 remove non bearing wall between dining room and kitchenDetails
revision to pa#2019-0725-6954 remove non bearing wall between dining room and kitchen | $60,000 |
| Sep 18, 2019 | Completed final sign-off Jan 2020 | 7 Presidio Av | bathroom remodeling upgrade plumbing, electrical. 35 sqft 2nd storyDetails
bathroom remodeling upgrade plumbing, electrical. 35 sqft 2nd story | $22,918 |
| Aug 5, 2019 | Expired or cancelled withdrawn Feb 2021 | 157 Santa Rosa Av | 38remove (e) office space & full bathroom @ first floor and convert into (2) bedrooms and one full bathroom 438 sf.Details
38remove (e) office space & full bathroom @ first floor and convert into (2) bedrooms and one full bathroom 438 sf. | $60,000 |
| Jul 25, 2019 | Completed final sign-off Feb 2020 | 435 Mangels Av | 4 front window replacement double hung wood divided light; interior remodel - add (n) restroom & remodel kitchen, new countertops, cabinets and new appliances. window replacement in-kind shall be wood & keep teh 3 windows at the first bedroom.Details
4 front window replacement double hung wood divided light; interior remodel - add (n) restroom & remodel kitchen, new countertops, cabinets and new appliances. window replacement in-kind shall be wood & keep teh 3 windows at the first bedroom. | $85,000 |
| Jul 24, 2019 | Never finaled issued Jul 2019, no final | 161 Marview Wy | revision to pa 201905160832. install an island sink in (e) kitchen on second floorDetails
revision to pa 201905160832. install an island sink in (e) kitchen on second floor | $2,000 |
| Jul 5, 2019 | Completed final sign-off May 2020 | 68 Harriet St | ref pa 201904269060. replace 2 (e) gas fireboxes w/ 2 (n) fireboxes.Details
ref pa 201904269060. replace 2 (e) gas fireboxes w/ 2 (n) fireboxes. | $10,000 |
| Jul 2, 2019 | Expired or cancelled expired Dec 2021 | 435 Mangels Av | deck repair, less than 50% (deck on ground). 25 recessed lights, wires. repiping sewer line.Details
deck repair, less than 50% (deck on ground). 25 recessed lights, wires. repiping sewer line. | $80,000 |
| May 24, 2019 | Never finaled issued May 2019, no final | 334 Teddy Av | install recessed lights, install: total 21. 8 in bedroom, 3 hallway, 4 in kitchen, 4 in living room, 2 in entrance. all high efficacy. provide vacancy sensor/dimer to jab lights.Details
install recessed lights, install: total 21. 8 in bedroom, 3 hallway, 4 in kitchen, 4 in living room, 2 in entrance. all high efficacy. provide vacancy sensor/dimer to jab lights. | $2,000 |
| May 16, 2019 | Never finaled issued May 2019, no final | 161 Marview Wy | kitchen remodel & removing non bearing wall.Details
kitchen remodel & removing non bearing wall. | $30,000 |
| Apr 26, 2019 | Completed final sign-off May 2020 | 68 Harriet St | interior remodel to (e) 3 level live work condo unit. new kitchen new poweder room, new coat closet new pantry, remodel masterbath, remodel loft bath, new flooringDetails
interior remodel to (e) 3 level live work condo unit. new kitchen new poweder room, new coat closet new pantry, remodel masterbath, remodel loft bath, new flooring | $150,000 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 68 Harriet St | remodel (e) bathrooms at mezzanine level and ada compliant bathroom at first floor. replace flooring throughout unit with new hardwood and tiles. with acoustical underlayment. cosmetic in kind remodel.Details
remodel (e) bathrooms at mezzanine level and ada compliant bathroom at first floor. replace flooring throughout unit with new hardwood and tiles. with acoustical underlayment. cosmetic in kind remodel. | $30,000 |
| Dec 6, 2017 | Completed final sign-off Mar 2021 | 1484 47th Av | build new driveway on the side of the building. build retaining wall, new curb cut, driveway pavement, retain existing chimney.Details
build new driveway on the side of the building. build retaining wall, new curb cut, driveway pavement, retain existing chimney. | $25,000 |