Block 1036, lot 037
2 Parker Ave
- City’s use
- Multi-Family Residential
- Built
- 1930
- Stories
- 3
- Units
- 15
- Rooms
- 24 bedrooms, 15 bathrooms
- Building
- 16,380 sq ft
- Lot
- 7,363 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 2 Parker Av | Speedy Building And Construction | to comply with complaint #202310015 fire proof ground floor walls and ceilings to include any penetrationDetails
to comply with complaint #202310015 fire proof ground floor walls and ceilings to include any penetration | $2,000 |
| Jan 29, 2020 | Never finaled filed Jan 2020, never issued | 2 Parker Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $120,000 | |
| Apr 16, 2019 | Completed final sign-off Jul 2019 | 2 Parker Av | Speedy Construction Inc | unit 201: one kitchen, 1 bath remodel. no structural workDetails
unit 201: one kitchen, 1 bath remodel. no structural work | $20,000 |
| Feb 19, 2016 | Completed final sign-off Apr 2016 | 2 Parker Av | Speedy Construction ****See Note | bathroom remodel #101.Details
bathroom remodel #101. | $13,000 |
| Dec 16, 2015 | Completed final sign-off Feb 2016 | 2 Parker Av | Speedy Construction ****See Note | kitchen and bathroom remodel at unit #104, no new wall and no existing wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150.0(k)3 and 150.0(k)8.Details
kitchen and bathroom remodel at unit #104, no new wall and no existing wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150.0(k)3 and 150.0(k)8. | $23,000 |
| Feb 18, 2015 | Completed final sign-off May 2015 | 2 Parker Av | Speedy Construction ****See Note | comply with nov 201410851 for apartment 102 2nd fl. replace kitchen appliances. replace door headers and wall construction in kitchen areaDetails
comply with nov 201410851 for apartment 102 2nd fl. replace kitchen appliances. replace door headers and wall construction in kitchen area | $5,000 |
| May 22, 2014 | Completed final sign-off Jun 2014 | 2 Parker Av | Qse Construction | for documentation only: this permit is to correct scope of work filed under permit #2014.0307.0250. to certify (e) anchor bolts installed under permit #8922889 were 5/8" anchor bolts 48" on center installed around permiter of bldg. foundation. (note no other work for seismic compliance)Details
for documentation only: this permit is to correct scope of work filed under permit #2014.0307.0250. to certify (e) anchor bolts installed under permit #8922889 were 5/8" anchor bolts 48" on center installed around permiter of bldg. foundation. (note no other work for seismic compliance) | |
| Mar 7, 2014 | Expired or cancelled cancelled Sep 2014 | 2 Parker Av | Qse Construction | strengthen (e) sill plates w/ (n) anchor bolts to (e) foundation. use 3/4"dia ab @16"oc. in cc holes to foundatioin bottom w/ plate washers, strengthen wood joist connectins w/ simpson l90 each side joists. pressure grout form garage footingDetails
strengthen (e) sill plates w/ (n) anchor bolts to (e) foundation. use 3/4"dia ab @16"oc. in cc holes to foundatioin bottom w/ plate washers, strengthen wood joist connectins w/ simpson l90 each side joists. pressure grout form garage footing | $8,550 |
| Aug 11, 2011 | Expired or cancelled cancelled Jan 2026 | 2 Parker Av | kitchen remodel in unit #104; replace flooring, cabinets, counters and new appliancesDetails
kitchen remodel in unit #104; replace flooring, cabinets, counters and new appliances | ||
| May 27, 2011 | Completed final sign-off Aug 2011 | 2 Parker Av | Mark Joseph Jansheski | remodel kitchen and bath & comply w/complaint # 201134863. unit 101 & 103.Details
remodel kitchen and bath & comply w/complaint # 201134863. unit 101 & 103. | $12,000 |
| Apr 3, 2006 | Completed final sign-off Jun 2006 | 2 Parker Av | remove cabinets in kitchen and replace with new cabinets and granite counter. 3 wall cabinets and 4 base cabinets.Details
remove cabinets in kitchen and replace with new cabinets and granite counter. 3 wall cabinets and 4 base cabinets. | $5,000 | |
| Apr 9, 2004 | Completed final sign-off Jul 2004 | 2 Parker Av | replace wood on deck 2'x4' next to metal stairsDetails
replace wood on deck 2'x4' next to metal stairs | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Speedy Construction ****See Note (3), Qse Construction (2), Mark Joseph Jansheski, Speedy Building And Construction, Speedy Construction Inc
- Architects
- Sergio Mayorga
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.