Xteam Design Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Sep 2026
- Last 24 months
- 18 permits filed
30 permits since 2000: 17 completed, 10 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Oct 2026 | 2128 Funston Av | interior remodel : two levels remodel and ground floor entry foyler, add one sub panel, 50% rear stair. includes remodel of 2 bath, one powder room and one kitchen like for like. 9/4/2026Details
interior remodel : two levels remodel and ground floor entry foyler, add one sub panel, 50% rear stair. includes remodel of 2 bath, one powder room and one kitchen like for like. 9/4/2026 | $120,000 |
| Aug 21, 2026 | In progress issued Aug 2026 | 1583 17th Av | replace (e) electrical garage door, like for like. street visible.Details
replace (e) electrical garage door, like for like. street visible. | $1,000 |
| Jul 29, 2026 | In progress issued Aug 2026 | 1583 17th Av | remove permited juliet balcany: install new upper and lower level decks and new stair. 2026002736 prjDetails
remove permited juliet balcany: install new upper and lower level decks and new stair. 2026002736 prj | $25,000 |
| Jul 28, 2026 | Completed final sign-off Sep 2026 | 465 Lansdale Av | revision 202607134952, different layout foundationDetails
revision 202607134952, different layout foundation | $22,000 |
| Jul 27, 2026 | Completed final sign-off Oct 2026 | 444 Union St | to obtain final inspection for work approved under pa# 202408289649 & 202504255280. all work is completeDetails
to obtain final inspection for work approved under pa# 202408289649 & 202504255280. all work is complete | |
| Jul 13, 2026 | Completed final sign-off Sep 2026 | 465 Lansdale Av | repalce (e) rear deck and construct a (n) deck to comply with current code in kindDetails
repalce (e) rear deck and construct a (n) deck to comply with current code in kind | $21,000 |
| May 22, 2026 | Completed final sign-off Jun 2026 | 1156 Broadway | demolish rear stair and close access door to stair.Details
demolish rear stair and close access door to stair. | $5,000 |
| May 8, 2026 | In progress issued May 2026 | 1047 14th St | remove and replace ceiling and wall covering throughout unit in kind with 5/8" type x sheet rock. approx 2,400 sq ft.Details
remove and replace ceiling and wall covering throughout unit in kind with 5/8" type x sheet rock. approx 2,400 sq ft. | $9,000 |
| Apr 21, 2026 | In progress issued Aug 2026 | 1047 14th St | unit 1047: add new bath to e) bedroom 1, add new bathroom @ e) bathroom, convert e) living rm to new bedroom, kitchen relocationDetails
unit 1047: add new bath to e) bedroom 1, add new bathroom @ e) bathroom, convert e) living rm to new bedroom, kitchen relocation | $40,000 |
| Apr 20, 2026 | In progress filed Apr 2026, not yet issued | 4044 Cesar Chavez St | revision to pa#: 202111122296 rear side expansion/horizontal addition at the attic level, add one bedroom and one bathroom, relocate one dormer, add another new dormer, remove two skylights. relocate one skylight.Details
revision to pa#: 202111122296 rear side expansion/horizontal addition at the attic level, add one bedroom and one bathroom, relocate one dormer, add another new dormer, remove two skylights. relocate one skylight. | $30,000 |
| Mar 5, 2026 | Completed final sign-off Sep 2026 | 1583 17th Av | revision to pa# 202512302990, convert (e) rec room to a den and a bedroom on ground level and widen rear door openings. extend wall between living and dining room on level 2Details
revision to pa# 202512302990, convert (e) rec room to a den and a bedroom on ground level and widen rear door openings. extend wall between living and dining room on level 2 | $60,000 |
| Feb 23, 2026 | Completed final sign-off Sep 2026 | 1583 17th Av | revision to bpa: 202512302990 remodel (e) ground floor bathroom, add a sink, retrofit and 2level 6 windows.Details
revision to bpa: 202512302990 remodel (e) ground floor bathroom, add a sink, retrofit and 2level 6 windows. | $10,000 |
| Jan 8, 2026 | Completed final sign-off Sep 2026 | 1583 17th Av | exploratory permit. open kitchen, nook, dinning rm & stair case drywallsDetails
exploratory permit. open kitchen, nook, dinning rm & stair case drywalls | $2,000 |
| Dec 30, 2025 | In progress issued Jan 2026 | 1583 17th Av | interior remodel: widen interior staircase, kitchen remodel, add one bathroom & one laundry room. remove stair at atrium and relocate existing gas furnace and water heater. ground fl: add one media room and one bathDetails
interior remodel: widen interior staircase, kitchen remodel, add one bathroom & one laundry room. remove stair at atrium and relocate existing gas furnace and water heater. ground fl: add one media room and one bath | $9,500 |
| Oct 29, 2025 | Completed final sign-off Sep 2026 | 2815 Taraval St | revision to pa #202509256105 for foundation on ground floor.Details
revision to pa #202509256105 for foundation on ground floor. | $10,000 |
| Oct 27, 2025 | Completed final sign-off Dec 2025 | 3965 24th St | to obtain final inspection for work approved under pa# 202206025509, pa# 202401224371 & pa# 202305097436. all works is complete.Details
to obtain final inspection for work approved under pa# 202206025509, pa# 202401224371 & pa# 202305097436. all works is complete. | |
| Sep 25, 2025 | Completed final sign-off Sep 2026 | 2815 Taraval St | remodel ground floor, add one study one family room one bath fire rated walls, add sliding door, replace window rear, relocated water heater and furnanceDetails
remodel ground floor, add one study one family room one bath fire rated walls, add sliding door, replace window rear, relocated water heater and furnance | $100,000 |
| Apr 25, 2025 | Expired or cancelled expired Oct 2026 | 444 Union St | revision to pa# 202408289649 and 202204111924, minor reconfiguration kitchen, bedroom & laundry area layout.Details
revision to pa# 202408289649 and 202204111924, minor reconfiguration kitchen, bedroom & laundry area layout. | |
| Aug 28, 2024 | Expired or cancelled expired Oct 2026 | 444 Union St | revision to pa# 202204111924. to delete approved bedroom, bathroom and stairs.Details
revision to pa# 202204111924. to delete approved bedroom, bathroom and stairs. | |
| Jun 11, 2024 | In progress issued Jul 2026 | 444 Union St | revision to pa 202204111924 rebuild exteior wood sheathing and stucco on basement floor, rear wall and 1st floor east side wall. rebuild/repair partial retaining wall @ basement floorDetails
revision to pa 202204111924 rebuild exteior wood sheathing and stucco on basement floor, rear wall and 1st floor east side wall. rebuild/repair partial retaining wall @ basement floor | $48,000 |
| May 29, 2024 | Completed final sign-off Aug 2024 | 300 03rd St | apt 305: remodel (e) bathrooms, remove tub and install a stand-up shohwer. replace flooring at the kitchen.Details
apt 305: remodel (e) bathrooms, remove tub and install a stand-up shohwer. replace flooring at the kitchen. | $18,000 |
| May 29, 2024 | Completed final sign-off Jun 2024 | 1326 Diamond St | rev pa 202107285324: convert the front foyer to a porch and revise backyard stair orientation.Details
rev pa 202107285324: convert the front foyer to a porch and revise backyard stair orientation. | $25,000 |
| Jan 22, 2024 | Expired or cancelled expired Dec 2025 | 3965 24th St | revision to pa# 202207289449 alteration to closet areaDetails
revision to pa# 202207289449 alteration to closet area | $1,000 |
| Jul 28, 2022 | Completed final sign-off Dec 2025 | 3965 24th St | convert existing basement to habitable space. scope includes infill a space below the floor above, 76 sqft., none visible, under 12' limit at the rear side of bldg. the conversion is to add two bedrms, two bathrms, 2 burner cooktop cooking area and a spiral stair to connect the basement & flr above.Details
convert existing basement to habitable space. scope includes infill a space below the floor above, 76 sqft., none visible, under 12' limit at the rear side of bldg. the conversion is to add two bedrms, two bathrms, 2 burner cooktop cooking area and a spiral stair to connect the basement & flr above. | $90,000 |
| Apr 11, 2022 | Completed final sign-off Aug 2026 | 444 Union St | addition of one adu unit at the first and ground floors under the state adu program. the first floor is a vacant store.Details
addition of one adu unit at the first and ground floors under the state adu program. the first floor is a vacant store. | $80,000 |
| Nov 12, 2021 | In progress issued Jul 2025 | 4044 Cesar Chavez St | addition of one adu to two-unit building. horizontal addition at rear of 2 lower levels and new deck. lower attic floor. no change to overall building height. remodel at 2 upper units including kitch, baths, stairs, and layouts. sprinkler deferred submit'l lateral upgrade under #202011209442.Details
addition of one adu to two-unit building. horizontal addition at rear of 2 lower levels and new deck. lower attic floor. no change to overall building height. remodel at 2 upper units including kitch, baths, stairs, and layouts. sprinkler deferred submit'l lateral upgrade under #202011209442. | $225,000 |
| Mar 5, 2021 | In progress issued Jul 2025 | 84 Saturn St | full remodel all levels, new bedroom in 3rd story attic with pop-up roof dormers, and new bedroom and bath at the ground floor with 9-inch excavation to increase ceiling height. full seismic/wind retrofit with new foundation and retaining wall, and shoring design. tier 1 sspa.Details
full remodel all levels, new bedroom in 3rd story attic with pop-up roof dormers, and new bedroom and bath at the ground floor with 9-inch excavation to increase ceiling height. full seismic/wind retrofit with new foundation and retaining wall, and shoring design. tier 1 sspa. | $200,000 |
| Mar 29, 2019 | Completed final sign-off Oct 2019 | 1259 14th Av | repair rear wood deck less than 50%. to comply with nov# 201921421, item #2Details
repair rear wood deck less than 50%. to comply with nov# 201921421, item #2 | $5,000 |
| Mar 22, 2019 | Completed final sign-off Nov 2019 | 68 Rome St | add new bedroom, replace exterior window on ground level, add new bathroom on 2nd levelDetails
add new bedroom, replace exterior window on ground level, add new bathroom on 2nd level | $35,000 |
| Jun 10, 2016 | Completed final sign-off Jul 2019 | 236 Cambridge St | vertical & horizontal addition. demo rear exterior wall & interior partition, adding 16' long two story to rear of bldg, 42.6 cu yd rear yard excavation, retaining wall & patio works.Details
vertical & horizontal addition. demo rear exterior wall & interior partition, adding 16' long two story to rear of bldg, 42.6 cu yd rear yard excavation, retaining wall & patio works. | $40,000 |