Back to bathroom remodel contractors
Xteam Design Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to Sep 2026
- Last 24 months
- 18 permits filed
30 permits since 2000: 17 completed, 10 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
11 bathroom remodel permits: 4 completed, 6 in progress, 1 expired or cancelled. Typically 28 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Oct 2026 | 2128 Funston Av | interior remodel : two levels remodel and ground floor entry foyler, add one sub panel, 50% rear stair. includes remodel of 2 bath, one powder room and one kitchen like for like. 9/4/2026Details
interior remodel : two levels remodel and ground floor entry foyler, add one sub panel, 50% rear stair. includes remodel of 2 bath, one powder room and one kitchen like for like. 9/4/2026 | $120,000 |
| Apr 21, 2026 | In progress issued Aug 2026 | 1047 14th St | unit 1047: add new bath to e) bedroom 1, add new bathroom @ e) bathroom, convert e) living rm to new bedroom, kitchen relocationDetails
unit 1047: add new bath to e) bedroom 1, add new bathroom @ e) bathroom, convert e) living rm to new bedroom, kitchen relocation | $40,000 |
| Apr 20, 2026 | In progress filed Apr 2026, not yet issued | 4044 Cesar Chavez St | revision to pa#: 202111122296 rear side expansion/horizontal addition at the attic level, add one bedroom and one bathroom, relocate one dormer, add another new dormer, remove two skylights. relocate one skylight.Details
revision to pa#: 202111122296 rear side expansion/horizontal addition at the attic level, add one bedroom and one bathroom, relocate one dormer, add another new dormer, remove two skylights. relocate one skylight. | $30,000 |
| Feb 23, 2026 | Completed final sign-off Sep 2026 | 1583 17th Av | revision to bpa: 202512302990 remodel (e) ground floor bathroom, add a sink, retrofit and 2level 6 windows.Details
revision to bpa: 202512302990 remodel (e) ground floor bathroom, add a sink, retrofit and 2level 6 windows. | $10,000 |
| Dec 30, 2025 | In progress issued Jan 2026 | 1583 17th Av | interior remodel: widen interior staircase, kitchen remodel, add one bathroom & one laundry room. remove stair at atrium and relocate existing gas furnace and water heater. ground fl: add one media room and one bathDetails
interior remodel: widen interior staircase, kitchen remodel, add one bathroom & one laundry room. remove stair at atrium and relocate existing gas furnace and water heater. ground fl: add one media room and one bath | $9,500 |
| Sep 25, 2025 | Completed final sign-off Sep 2026 | 2815 Taraval St | remodel ground floor, add one study one family room one bath fire rated walls, add sliding door, replace window rear, relocated water heater and furnanceDetails
remodel ground floor, add one study one family room one bath fire rated walls, add sliding door, replace window rear, relocated water heater and furnance | $100,000 |
| Aug 28, 2024 | Expired or cancelled expired Oct 2026 | 444 Union St | revision to pa# 202204111924. to delete approved bedroom, bathroom and stairs.Details
revision to pa# 202204111924. to delete approved bedroom, bathroom and stairs. | |
| May 29, 2024 | Completed final sign-off Aug 2024 | 300 03rd St | apt 305: remodel (e) bathrooms, remove tub and install a stand-up shohwer. replace flooring at the kitchen.Details
apt 305: remodel (e) bathrooms, remove tub and install a stand-up shohwer. replace flooring at the kitchen. | $18,000 |
| Nov 12, 2021 | In progress issued Jul 2025 | 4044 Cesar Chavez St | addition of one adu to two-unit building. horizontal addition at rear of 2 lower levels and new deck. lower attic floor. no change to overall building height. remodel at 2 upper units including kitch, baths, stairs, and layouts. sprinkler deferred submit'l lateral upgrade under #202011209442.Details
addition of one adu to two-unit building. horizontal addition at rear of 2 lower levels and new deck. lower attic floor. no change to overall building height. remodel at 2 upper units including kitch, baths, stairs, and layouts. sprinkler deferred submit'l lateral upgrade under #202011209442. | $225,000 |
| Mar 5, 2021 | In progress issued Jul 2025 | 84 Saturn St | full remodel all levels, new bedroom in 3rd story attic with pop-up roof dormers, and new bedroom and bath at the ground floor with 9-inch excavation to increase ceiling height. full seismic/wind retrofit with new foundation and retaining wall, and shoring design. tier 1 sspa.Details
full remodel all levels, new bedroom in 3rd story attic with pop-up roof dormers, and new bedroom and bath at the ground floor with 9-inch excavation to increase ceiling height. full seismic/wind retrofit with new foundation and retaining wall, and shoring design. tier 1 sspa. | $200,000 |
| Mar 22, 2019 | Completed final sign-off Nov 2019 | 68 Rome St | add new bedroom, replace exterior window on ground level, add new bathroom on 2nd levelDetails
add new bedroom, replace exterior window on ground level, add new bathroom on 2nd level | $35,000 |