Block 0050, lot 006C
764 Chestnut St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 2
- Units
- 2
- Rooms
- 7 bedrooms, 2 bathrooms
- Building
- 2,738 sq ft
- Lot
- 1,441 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 16, 2025 | Completed final sign-off Jun 2025 | 764 Chestnut St | G M Building And Construction Inc | revision to pa #200904095976 & 202410183313 1st fl: reconfiguration of master bathroom & remove partition walls btwn storage and garage area. 2nd fl: change from laundry to powder room & reconfiguration of bathroom, laundry at closet area. 3rd fl: return the room back its original use as bedroomDetails
revision to pa #200904095976 & 202410183313 1st fl: reconfiguration of master bathroom & remove partition walls btwn storage and garage area. 2nd fl: change from laundry to powder room & reconfiguration of bathroom, laundry at closet area. 3rd fl: return the room back its original use as bedroom | |
| Feb 20, 2025 | Completed final sign-off Apr 2025 | 766 Chestnut St | G M Building And Construction Inc | replace front windows to comply w/ complaint #202534179 window replacement. 8 windows total. inkind. max u factor 0.30.Details
replace front windows to comply w/ complaint #202534179 window replacement. 8 windows total. inkind. max u factor 0.30. | $12,500 |
| Jan 14, 2025 | Completed final sign-off Jun 2025 | 764 Chestnut St | revision to permit 202410183313 and 200904095976 (ref 202406184761): structural only - add footing below exterior wall along east property line crawl space area.Details
revision to permit 202410183313 and 200904095976 (ref 202406184761): structural only - add footing below exterior wall along east property line crawl space area. | ||
| Nov 18, 2024 | Completed final sign-off Jan 2025 | 766 Chestnut St | Estrada Design Build | non-structural interior remodel to convert portion of (e) den to new bathroom. remove 11' non bearing wall. add new corner sink to the existing toilet. add new floating toilet in existing bathroom.Details
non-structural interior remodel to convert portion of (e) den to new bathroom. remove 11' non bearing wall. add new corner sink to the existing toilet. add new floating toilet in existing bathroom. | $9,000 |
| Oct 18, 2024 | Completed final sign-off Jun 2025 | 764 Chestnut St | structural revision to approved permit pa #200904095976 and 202406184761. no change to original rear windows on 2nd and 3rd floor. replace moment frame with plywood shearwall at rear wall. add'l strengthening by adding walls ea side of interior stair. new grade beam and spread footings at line bDetails
structural revision to approved permit pa #200904095976 and 202406184761. no change to original rear windows on 2nd and 3rd floor. replace moment frame with plywood shearwall at rear wall. add'l strengthening by adding walls ea side of interior stair. new grade beam and spread footings at line b | ||
| Jun 18, 2024 | Expired or cancelled withdrawn May 2025 | 764 Chestnut St | to comply w/ notice of violation 02294463Details
to comply w/ notice of violation 02294463 | ||
| Jun 18, 2024 | Completed final sign-off Jun 2025 | 764 Chestnut St | recommencement and completion of work approved under pa#200904095976.Details
recommencement and completion of work approved under pa#200904095976. | $50,000 | |
| Jun 18, 2024 | Completed final sign-off Jun 2024 | 764 Chestnut St | to obtain final inspection for work approved under pa# 200902192430. all work is complete.Details
to obtain final inspection for work approved under pa# 200902192430. all work is complete. | ||
| Oct 3, 2023 | Completed final sign-off Apr 2024 | 764 Chestnut St | Sonoma Build Group Inc | to comply with nov 202294463 move right door (764) r" to left front doorDetails
to comply with nov 202294463 move right door (764) r" to left front door | $2,750 |
| Dec 13, 2021 | Completed final sign-off Aug 2022 | 766 Chestnut St | Velox Construction Inc/Velox Des & Const | remodel e kitchen, bath, family room into new bedroom. all work on 2nd flDetails
remodel e kitchen, bath, family room into new bedroom. all work on 2nd fl | $55,000 |
| Dec 10, 2021 | Never finaled issued Dec 2021, no final | 764 Chestnut St | Velox Construction Inc/Velox Des & Const | remodel (e) kitchen and bathroom; addition of washer & dryer; convert (e) family room to (n) bedroomDetails
remodel (e) kitchen and bathroom; addition of washer & dryer; convert (e) family room to (n) bedroom | $55,000 |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 766 Chestnut St | Y D Construction Co. Inc. | 2 kitchens and two full bathrooms and two half bathrooms. remodel on 2nd and 3rd floor in kind same locationDetails
2 kitchens and two full bathrooms and two half bathrooms. remodel on 2nd and 3rd floor in kind same location | $30,000 |
| Apr 9, 2009 | Never finaled issued Feb 2010, no final | 764 Chestnut St | remodel consists of interior renovations of upper & provide new stairs of lower unit. master suite addition to lower unit# 764 behind garage. replace all windows, voluntary strengthening steel frame at rear facade. (master suite) m. bedroom, m. bathroom & closet.Details
remodel consists of interior renovations of upper & provide new stairs of lower unit. master suite addition to lower unit# 764 behind garage. replace all windows, voluntary strengthening steel frame at rear facade. (master suite) m. bedroom, m. bathroom & closet. | $53,000 | |
| Feb 19, 2009 | Expired or cancelled expired Oct 2010 | 764 Chestnut St | S F Garage Company Inc. | provide a new steel beam to support the floor joist above. remove existing brick footing to new conc. footing.Details
provide a new steel beam to support the floor joist above. remove existing brick footing to new conc. footing. | $8,000 |
| Jan 6, 2009 | Completed final sign-off Oct 2009 | 764 Chestnut St | S F Garage Company Inc. | provide a garage door opening at the building. provide car parking area inside in the bldg. provide the curb cut in the front of the bldgDetails
provide a garage door opening at the building. provide car parking area inside in the bldg. provide the curb cut in the front of the bldg | $18,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- G M Building And Construction Inc (2), S F Garage Company Inc. (2), Velox Construction Inc/Velox Des & Const (2), Estrada Design Build, Sonoma Build Group Inc, Y D Construction Co. Inc.
- Architects
- Horon Lee
- Engineers
- Harold Howell (2), Horon Lee (2), Andrew Ghofrani, Jason Langkammerer
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.