Block 0208, lot 008
640 Clay St
- City’s use
- Commercial Hotel
- Built
- 1912
- Stories
- 4
- Units
- 3
- Rooms
- 16 bathrooms
- Building
- 27,578 sq ft
- Lot
- 5,841 sq ft
- Zoning
- CCB
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 3, 2022 | Expired or cancelled cancelled Jan 2026 | 640 Clay St | Velox Construction Inc/Velox Des & Const | install 1 1/4 drain pipe from top of storage tank down side of building, pathc and secure pipe install 42" wall behind boilerDetails
install 1 1/4 drain pipe from top of storage tank down side of building, pathc and secure pipe install 42" wall behind boiler | $1,000 |
| Jun 30, 2015 | Never finaled issued Jun 2015, no final | 640 Clay St | Alpha Construction Company | to comply with nov#201551014: repair/replace inoperable window (1) back of side; window not facing street front.Details
to comply with nov#201551014: repair/replace inoperable window (1) back of side; window not facing street front. | $500 |
| May 29, 2013 | Completed final sign-off Jun 2013 | 640 Clay St | Alpha Construction Company | to comply with ordinance 029-13 installation of grab bars in sro at hte following locations, 10 bathr and 6 showersDetails
to comply with ordinance 029-13 installation of grab bars in sro at hte following locations, 10 bathr and 6 showers | $1,500 |
| Jan 19, 2011 | Completed final sign-off Feb 2011 | 640 Clay St | Lei's Construction Company | to comply with n.o.v. # 201084909. bathroom remodel: repalce shower pan at 2nd and 3rd floor in common area.Details
to comply with n.o.v. # 201084909. bathroom remodel: repalce shower pan at 2nd and 3rd floor in common area. | $2,500 |
| Jan 19, 2011 | Completed final sign-off Feb 2011 | 640 Clay St | Lei's Construction Company | bathroom remodel: replace shower pan at 1st floor, retile floor & walls. no structural changes.Details
bathroom remodel: replace shower pan at 1st floor, retile floor & walls. no structural changes. | $2,500 |
| Feb 10, 2010 | Completed final sign-off May 2010 | 640 Clay St | Shun Construction Inc. | remodel apt.130,131,230,330. replace electrical wall heat & replace cabinets, sink and sheetrock.Details
remodel apt.130,131,230,330. replace electrical wall heat & replace cabinets, sink and sheetrock. | $4,000 |
| Dec 5, 2006 | Completed final sign-off Dec 2006 | 634 Clay St | Property Mgmnt Merchandisea | revision to 200512029367. rooms and bath renovation (room a1,a2,a3 only. reducing scope of workDetails
revision to 200512029367. rooms and bath renovation (room a1,a2,a3 only. reducing scope of work | |
| Aug 10, 2006 | Completed final sign-off Dec 2006 | 634 Clay St | Property Mgmnt Merchandisea | revisioin to 200607116190 to show on drawings, the location of sinks, lighting, receptacles, closets, smoke detectors. replace existing elec heaters. work on 2nd floor only. fire alarm and sprinkler work sep permit.Details
revisioin to 200607116190 to show on drawings, the location of sinks, lighting, receptacles, closets, smoke detectors. replace existing elec heaters. work on 2nd floor only. fire alarm and sprinkler work sep permit. | |
| Jul 11, 2006 | Completed final sign-off Jan 2009 | 634 Clay St | Property Mgmnt Merchandisea | revision to 200512029367 to make new 20' long section of hallway same as existing building 39" and make new doors same as existing 32"- area served is less than 50%.Details
revision to 200512029367 to make new 20' long section of hallway same as existing building 39" and make new doors same as existing 32"- area served is less than 50%. | |
| Dec 2, 2005 | Never finaled issued Dec 2005, no final | 640 Clay St | street space permitDetails
street space permit | ||
| Dec 2, 2005 | Completed final sign-off Dec 2006 | 640 Clay St | Matrix Seismic Corp | renovation of (e) bathrooms in 2/f,3/f & 4/fDetails
renovation of (e) bathrooms in 2/f,3/f & 4/f | $30,000 |
| Oct 18, 2005 | Never finaled issued Oct 2005, no final | 640 Clay St | streetspaceDetails
streetspace | ||
| Sep 15, 2004 | Never finaled issued Sep 2004, no final | 640 Clay St | Matrix Seismic Corp | rev. to pa#2001/02/12/1894-for relocation of front steel frameDetails
rev. to pa#2001/02/12/1894-for relocation of front steel frame | |
| Jul 6, 2004 | Expired or cancelled expired Nov 2006 | 640 Clay St | High Quality Roofing Co | reroofingDetails
reroofing | $25,000 |
| May 4, 2004 | Never finaled issued May 2004, no final | 640 Clay St | Matrix Seismic Corp | renewal of permit applic. #2001/02/12/1894 umb for remainaing work of steel frame and roof anchorsDetails
renewal of permit applic. #2001/02/12/1894 umb for remainaing work of steel frame and roof anchors | $10,000 |
| Apr 14, 2004 | Completed final sign-off Jun 2004 | 640 Clay St | Property Mgmnt Merchandisea | remodel 3/f shower stall demolish tile walls to the study sex new shower pan and walls isntall ventDetails
remodel 3/f shower stall demolish tile walls to the study sex new shower pan and walls isntall vent | $6,000 |
| Apr 22, 2003 | Never finaled issued Apr 2003, no final | 634 Clay St | sidewalkDetails
sidewalk | ||
| Nov 16, 2001 | Completed final sign-off Jan 2002 | 634 Clay St | demo shower tile walls/pan, build new in like kind, replace few pc.dry rot studs, install n fl drainDetails
demo shower tile walls/pan, build new in like kind, replace few pc.dry rot studs, install n fl drain | $3,000 | |
| Nov 14, 2001 | Never finaled issued Nov 2001, no final | 640 Clay St | street space permitDetails
street space permit | ||
| Sep 25, 2001 | Completed final sign-off Jan 2002 | 640 Clay St | A.S.T.I. Services (Automatic Sprinkler) | add 148 new token hds in all units 2nd thru 4th floor only, fire sprinkler work onlyDetails
add 148 new token hds in all units 2nd thru 4th floor only, fire sprinkler work only | $19,000 |
| Feb 12, 2001 | Completed final sign-off Sep 2004 | 640 Clay St | Matrix Seismic Corp | umb special procedureDetails
umb special procedure | $85,000 |
| Dec 29, 2000 | Completed final sign-off Mar 2001 | 636 Clay St | resubmit e stairwell rating to non rated stairwell renew 09822664 for final only (200002252756)Details
resubmit e stairwell rating to non rated stairwell renew 09822664 for final only (200002252756) | ||
| Apr 10, 2000 | Completed final sign-off Mar 2001 | 636 Clay St | Aquamatic Fire Protection | tenant improvement - 1st floor and basement. design /build relocate or add 45 fire sprinklers.Details
tenant improvement - 1st floor and basement. design /build relocate or add 45 fire sprinklers. | $8,150 |
| Apr 6, 2000 | Completed final sign-off Mar 2001 | 636 Clay St | Bay Alarm Company | automatic smoke detectionin 1st floor, sprinkler monitor for entire buildingDetails
automatic smoke detectionin 1st floor, sprinkler monitor for entire building | $19,920 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Matrix Seismic Corp (4), Property Mgmnt Merchandisea (4), Alpha Construction Company (2), Lei's Construction Company (2), A.S.T.I. Services (Automatic Sprinkler), Aquamatic Fire Protection, Bay Alarm Company, High Quality Roofing Co, Shun Construction Inc., Velox Construction Inc/Velox Des & Const
- Architects
- Tai Peter Lam (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.