Block 2746, lot 035
3500 Market St
- City’s use
- Multi-Family Residential
- Built
- 1961
- Stories
- 3
- Units
- 17
- Rooms
- 17 bathrooms
- Building
- 15,348 sq ft
- Lot
- 7,949 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2025 | Completed final sign-off Jun 2025 | 3500 Market St | to obtain final inspection for work approved under pa# 201606291229 and pa# 201603162194. all work is complete.Details
to obtain final inspection for work approved under pa# 201606291229 and pa# 201603162194. all work is complete. | ||
| Jun 26, 2025 | Completed final sign-off Jun 2025 | 3500 Market St | to obtain final inspection for work approved under pa# 202302071573. all work is completeDetails
to obtain final inspection for work approved under pa# 202302071573. all work is complete | ||
| Jun 20, 2025 | Completed final sign-off Jul 2025 | 3500 Market St | Commercial Fire Protection Llc | as built pa 202503041531. elevator cab is provided with fire fighter's light symble. updated elevator checklist. f.a control relay added in emr. annunciator panel model updated. smoke to be replaced with heat detector on 5 level. equipment legend, matrix, calculators, and fire riser diagram updated.Details
as built pa 202503041531. elevator cab is provided with fire fighter's light symble. updated elevator checklist. f.a control relay added in emr. annunciator panel model updated. smoke to be replaced with heat detector on 5 level. equipment legend, matrix, calculators, and fire riser diagram updated. | |
| May 15, 2025 | Completed final sign-off Jun 2025 | 3500 Market St | Casman Construction Inc | replace sheetrock in garage that was damaged by water. 5/8 dentshield to be installed. to comply with complaint #202293622 item #3Details
replace sheetrock in garage that was damaged by water. 5/8 dentshield to be installed. to comply with complaint #202293622 item #3 | $2,000 |
| Mar 4, 2025 | Completed final sign-off Aug 2025 | 3500 Market St | Commercial Fire Protection Llc | add (1)new idnac repeater next to facu on the 1st level.update fire riser diagram,calculations, equipment legend.ref# pa#202306160259 and 202410082535Details
add (1)new idnac repeater next to facu on the 1st level.update fire riser diagram,calculations, equipment legend.ref# pa#202306160259 and 202410082535 | |
| Oct 8, 2024 | Completed final sign-off Aug 2025 | 3500 Market St | Commercial Fire Protection Llc | revision to 202306160259: change electrical rm to trush rm, add 3 lf horns to e) unit on 5th/f. add 11 lf horns to e) bedrooms previously dining rms. update fire riser, diagram, calculations equipment listDetails
revision to 202306160259: change electrical rm to trush rm, add 3 lf horns to e) unit on 5th/f. add 11 lf horns to e) bedrooms previously dining rms. update fire riser, diagram, calculations equipment list | |
| Jun 16, 2023 | Completed final sign-off Aug 2025 | 3500 Market St | Commercial Fire Protection Llc | t.i. upgrade to (e) fire alarm devices to be replaced: manual pull stations,smoke detectors,(e) bells to be replcaed with horn strobes unto with 520hz low-freq audibles installed in accorance to sffd ab's & 2022 nfpa72, 1225 and other applicable nfpa standards.facp monitored by starlink 24v cells.Details
t.i. upgrade to (e) fire alarm devices to be replaced: manual pull stations,smoke detectors,(e) bells to be replcaed with horn strobes unto with 520hz low-freq audibles installed in accorance to sffd ab's & 2022 nfpa72, 1225 and other applicable nfpa standards.facp monitored by starlink 24v cells. | $59,000 |
| Feb 7, 2023 | Expired or cancelled expired Jun 2025 | 3500 Market St | Velox Construction Inc/Velox Des & Const | to comply with nov# 202293622 roof leaking repair; repair in kind.Details
to comply with nov# 202293622 roof leaking repair; repair in kind. | $1,000 |
| Feb 7, 2023 | Expired or cancelled expired Jun 2025 | 3500 Market St | Velox Construction Inc/Velox Des & Const | to obtain final inspection for work approved under pa#: 201603162194 and 201606921229 all work is completeDetails
to obtain final inspection for work approved under pa#: 201603162194 and 201606921229 all work is complete | |
| Sep 2, 2022 | Expired or cancelled expired Jun 2025 | 3500 Market St | to obtain final inspection for work approved under pa#201606291229. all work is complete.Details
to obtain final inspection for work approved under pa#201606291229. all work is complete. | ||
| Aug 25, 2022 | Never finaled issued Sep 2022, no final | 3500 Market St | unit #204: remodel in kind, kitchen and bathroom remodel: updated lighting throughout unit.Details
unit #204: remodel in kind, kitchen and bathroom remodel: updated lighting throughout unit. | $5,000 | |
| Jan 16, 2019 | Completed final sign-off Apr 2019 | 3500 Market St | Sol Builders | revision to soft story permit #201609157899. eliminate two strong wall and a shear wall modify concrete beam detail per site condition.Details
revision to soft story permit #201609157899. eliminate two strong wall and a shear wall modify concrete beam detail per site condition. | |
| Sep 15, 2016 | Completed final sign-off Apr 2019 | 3500 Market St | Sol Builders | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $150,000 |
| Jun 29, 2016 | Expired or cancelled expired Mar 2023 | 3500 Market St | M 2 Design (Ck Id) | kitchen and bath remodel, like for like. no changes to walls or addition or removal of walls.Details
kitchen and bath remodel, like for like. no changes to walls or addition or removal of walls. | $15,000 |
| Mar 16, 2016 | Expired or cancelled expired Mar 2023 | 3500 Market St | M 2 Design (Ck Id) | apt 203: remodel kitchen, no change in layout & openings. upgrade electrical panel. min 50% wattage in kitchen lighting shall be high efficiency.Details
apt 203: remodel kitchen, no change in layout & openings. upgrade electrical panel. min 50% wattage in kitchen lighting shall be high efficiency. | $15,000 |
| Jun 15, 2015 | Completed final sign-off Jul 2015 | 3500 Market St | M&M Builders | comply with nov 201527193 (item 3 only) dated 2/26/2015. repair existing roof deck in kind which is approved under appl. #8313008. approx. 385 sq. ft.Details
comply with nov 201527193 (item 3 only) dated 2/26/2015. repair existing roof deck in kind which is approved under appl. #8313008. approx. 385 sq. ft. | $5,000 |
| Nov 8, 2012 | Completed final sign-off Jan 2013 | 3500 Market St | one kitchen & 1 bath remodel. like for like. no structural work, no change in wall opening layout. min 50% kitchen of total pmermanent light wattage shall be he. comply with cbc 2010 sec 420. for co alarmsDetails
one kitchen & 1 bath remodel. like for like. no structural work, no change in wall opening layout. min 50% kitchen of total pmermanent light wattage shall be he. comply with cbc 2010 sec 420. for co alarms | $15,000 | |
| Nov 1, 2012 | Completed final sign-off Jan 2013 | 3500 Market St | kitchen & bath remodel apt 102, non structural like for likeDetails
kitchen & bath remodel apt 102, non structural like for like | $21,500 | |
| Sep 12, 2012 | Completed final sign-off Feb 2016 | 3500 Market St | #202- to obtain final inspection for work approved under pa#201103232693 all work is complete.Details
#202- to obtain final inspection for work approved under pa#201103232693 all work is complete. | ||
| Aug 28, 2012 | Completed final sign-off Nov 2012 | 3500 Market St | 1 kitchen & 1 bathroom remodel in apt #201. no structural, like for likeDetails
1 kitchen & 1 bathroom remodel in apt #201. no structural, like for like | $18,000 | |
| Dec 1, 2011 | Completed final sign-off Nov 2012 | 3500 Market St | Astorga Const Company | install 4 sprinkler heads on trash chute. new sprinkler system per nfpa 13. to comply with nov 201159390. first floor garage.Details
install 4 sprinkler heads on trash chute. new sprinkler system per nfpa 13. to comply with nov 201159390. first floor garage. | $900 |
| Nov 10, 2011 | Never finaled issued Dec 2011, no final | 3500 Market St | comply with nov 201159390; rebuild garbage structure at rear of building. repair and replace walkway joisting as needed.Details
comply with nov 201159390; rebuild garbage structure at rear of building. repair and replace walkway joisting as needed. | $18,000 | |
| Jul 14, 2011 | Never finaled issued Jul 2011, no final | 3500 Market St | #303 - kitchen and bathroom remodel. kitchen: remove & replace cabinets and counter top. bathroom: remove & replace cabinets and fixtures. kitchen: at least 50% high efficacy (he) lighting to comply cec 150(k), bathroom: he or occupancy sensor. no change to exhaust system.Details
#303 - kitchen and bathroom remodel. kitchen: remove & replace cabinets and counter top. bathroom: remove & replace cabinets and fixtures. kitchen: at least 50% high efficacy (he) lighting to comply cec 150(k), bathroom: he or occupancy sensor. no change to exhaust system. | $25,000 | |
| Mar 23, 2011 | Expired or cancelled expired Jul 2012 | 3500 Market St | to comply w/nov #201107521. kitchen & bath remodeling.Details
to comply w/nov #201107521. kitchen & bath remodeling. | $30,000 | |
| Mar 23, 2011 | Never finaled issued Mar 2011, no final | 3500 Market St | kitchen & bathroom remodel. kitchen: remove & replace cabinets and counter top. bathroom: remove & replace toilet vanity & top. kitchen: at least 50% he lighting / cec 150 (k). bathroom: he or occupancy sensor.Details
kitchen & bathroom remodel. kitchen: remove & replace cabinets and counter top. bathroom: remove & replace toilet vanity & top. kitchen: at least 50% he lighting / cec 150 (k). bathroom: he or occupancy sensor. | $30,000 | |
| Jan 20, 2011 | Never finaled issued Jan 2011, no final | 3500 Market St | kitchen & bathroom remodel; kitchen-remove & replace cabinets & countertops. bathroom-move toilet & vanity only (no tub or shower).Details
kitchen & bathroom remodel; kitchen-remove & replace cabinets & countertops. bathroom-move toilet & vanity only (no tub or shower). | $32,000 | |
| Aug 7, 2006 | Completed final sign-off Mar 2007 | 3500 Market St | infill 2 walls at elevatior shaft s/subseuent ada upgrades 1hr constructionDetails
infill 2 walls at elevatior shaft s/subseuent ada upgrades 1hr construction | $39,283 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.