Michael Moores
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Ellerbe Becket, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2008 to Jan 2022
7 permits since 2000 (architect on 5 permits, engineer on 2 permits, authorized agent-others on 1 permit): 7 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 14, 2022 | Completed final sign-off Oct 2022 | 939 Ellis St | Kaiser Foundation Health Plan Inc | project involves replacement of door hardware found not to be in compliance as part of sffd annual inspection work inclues: replacement of door hardware at conference room 7103 (noted as conference room #7 on report), stair 1 door, stiar 2 door and stair vestibule at level 7.Details
project involves replacement of door hardware found not to be in compliance as part of sffd annual inspection work inclues: replacement of door hardware at conference room 7103 (noted as conference room #7 on report), stair 1 door, stiar 2 door and stair vestibule at level 7. | $15,000 |
| Sep 28, 2017 | Completed final sign-off Dec 2017 | 1 Daniel Burnham Ct | Commercial Interior Builders Inc | #230- revision to 201709016651, plan reveision to layout of recepti9on 205, addition of data outlets, revision to toilet 209 finishes. n/a ordinance #155-13Details
#230- revision to 201709016651, plan reveision to layout of recepti9on 205, addition of data outlets, revision to toilet 209 finishes. n/a ordinance #155-13 | $280,000 |
| Sep 22, 2017 | Completed final sign-off Jan 2018 | 1 Daniel Burnham Ct | Commercial Interior Builders Inc | 2nd fl, ste 230c plumbing, mechanical & electrical ti; 2nd floor. ref pa 2014-0901-6651. n/a ordinance #155-13Details
2nd fl, ste 230c plumbing, mechanical & electrical ti; 2nd floor. ref pa 2014-0901-6651. n/a ordinance #155-13 | $54,000 |
| Sep 1, 2017 | Completed final sign-off Jan 2018 | 1 Daniel Burnham Ct | Commercial Interior Builders Inc | 2/f: non rated partitions and doors, new floor finishes, paint, casework maher not reqDetails
2/f: non rated partitions and doors, new floor finishes, paint, casework maher not req | $280,000 |
| May 18, 2010 | Completed final sign-off Dec 2010 | 2250 Hayes St | Dpr Construction Inc | exterior window replacement at ground flr.Details
exterior window replacement at ground flr. | $50,000 |
| Dec 16, 2008 | Completed final sign-off Dec 2010 | 2250 Hayes St | Dpr Construction Inc | structural demolition & upgrades to the (e) radiation therapy vault including vault foundation, load bearing walls, grade beams, radiation shielding. also included equipment anchorage & (e) slab patching details. tenant improvement at entire ground floor under pa# 2008/11/12/6338.Details
structural demolition & upgrades to the (e) radiation therapy vault including vault foundation, load bearing walls, grade beams, radiation shielding. also included equipment anchorage & (e) slab patching details. tenant improvement at entire ground floor under pa# 2008/11/12/6338. | $600,000 |
| Nov 12, 2008 | Completed final sign-off Dec 2010 | 2250 Hayes St | Dpr Construction Inc | renovation of south wing g/f to accomodate new cancer center consisting of raditation oncology center @ east end & infusion center @ the west end of the floor with shared supporting facilities in the center of the floor. mep included. remove glass block and replace with stucco & new windows.Details
renovation of south wing g/f to accomodate new cancer center consisting of raditation oncology center @ east end & infusion center @ the west end of the floor with shared supporting facilities in the center of the floor. mep included. remove glass block and replace with stucco & new windows. | $7,500,000 |