30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 4, 2012 | Never finaled issued May 2012, no final | 450 Stanyan St | Signtech Electrical Advertising Inc. | install 1 non-illuminated wall signs at ground level.Details
install 1 non-illuminated wall signs at ground level. | $1,000 |
| Apr 4, 2012 | Completed final sign-off Aug 2012 | 450 Stanyan St | Signtech Electrical Advertising Inc. | install 2 illuminated wall signs at top level of buildingDetails
install 2 illuminated wall signs at top level of building | $6,000 |
| Nov 7, 2011 | Completed final sign-off Dec 2011 | 2250 Hayes St | Bay Cities Fire Protection | suite #505-add 11 new pendent sprinklers, the area is fed from the (e) 2" feed main in hallwayDetails
suite #505-add 11 new pendent sprinklers, the area is fed from the (e) 2" feed main in hallway | $3,600 |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 2250 Hayes St | Slembrouck-Many Corporation | 5th floor-install new extends panel in new storage room, install new smoke detector above booster. install 3 new duct detectors to 3 new fsd's. install 6 new strobe lights & 2 new horn/strobes.Details
5th floor-install new extends panel in new storage room, install new smoke detector above booster. install 3 new duct detectors to 3 new fsd's. install 6 new strobe lights & 2 new horn/strobes. | $7,000 |
| Oct 21, 2011 | Completed final sign-off Nov 2011 | 2250 Hayes St | Creedence Corporation | office t- st.mary's medical office on the 5th fl, rm 505. reframe 60' lin. of new walls, adjust elec., add 4 exam rm sinks, repair or replace sheetrock, new lights, flooring, painting. fire sprinkler, fa, mep under separate permitDetails
office t- st.mary's medical office on the 5th fl, rm 505. reframe 60' lin. of new walls, adjust elec., add 4 exam rm sinks, repair or replace sheetrock, new lights, flooring, painting. fire sprinkler, fa, mep under separate permit | $115,000 |
| Sep 21, 2011 | Expired or cancelled cancelled Jan 2020 | 2250 Hayes St | replace existing windows on 3rd floor. replace in kind, but thermolly improved.Details
replace existing windows on 3rd floor. replace in kind, but thermolly improved. | $88,000 | |
| Aug 11, 2011 | Completed final sign-off Sep 2011 | 450 Stanyan St | Slembrouck-Many Corporation | modify existing fa system on 1st floor only. adding 1 new door holder with smokes on either side of the door. adding 2 new relays for 3 different auto doors. all 3 sets of doors will have smoke detectors on either side.Details
modify existing fa system on 1st floor only. adding 1 new door holder with smokes on either side of the door. adding 2 new relays for 3 different auto doors. all 3 sets of doors will have smoke detectors on either side. | $2,500 |
| Mar 11, 2011 | Expired or cancelled cancelled Aug 2012 | 450 Stanyan St | Jemcom | (e) three antennas to be relocated from east face to north face of existing building. application for all other work under review by oshpd.Details
(e) three antennas to be relocated from east face to north face of existing building. application for all other work under review by oshpd. | $6,000 |
| Feb 23, 2011 | Expired or cancelled cancelled Oct 2011 | 450 Stanyan St | Slembrouck-Many Corporation | modify (e) fire alarm system on 1st fl. add 3 new relays to tie new door operators into fa system. add 1 new door hold and tie into (e) door hold circuit. new smoke detectors on both sides of ea set of doors with new operator's dor holdDetails
modify (e) fire alarm system on 1st fl. add 3 new relays to tie new door operators into fa system. add 1 new door hold and tie into (e) door hold circuit. new smoke detectors on both sides of ea set of doors with new operator's dor hold | $7,500 |
| Oct 26, 2010 | Completed final sign-off Dec 2010 | 2250 Hayes St | H L S. Inc Dba Wolf General | revision to p.a. #201003178427: addition of seven sfds' to complete rating of corridor.Details
revision to p.a. #201003178427: addition of seven sfds' to complete rating of corridor. | $17,500 |
| Sep 27, 2010 | Completed final sign-off Dec 2010 | 450 Stanyan St | Slembrouck-Many Corporation | 1st & 6th floors-revision to pa# 2010-0429-1324-7 new duct smoke detectors located on the 6th floor, 3 new sprinkler switches located on the 1st floor & 3 new modules.Details
1st & 6th floors-revision to pa# 2010-0429-1324-7 new duct smoke detectors located on the 6th floor, 3 new sprinkler switches located on the 1st floor & 3 new modules. | $4,000 |
| Aug 20, 2010 | Completed final sign-off Dec 2010 | 450 Stanyan St | J K M Fire Protection | rev 201004230946, relocate chapel pipe to center and use hsw fire sprinklers verses ssuDetails
rev 201004230946, relocate chapel pipe to center and use hsw fire sprinklers verses ssu | |
| May 18, 2010 | Completed final sign-off Dec 2010 | 2250 Hayes St | Dpr Construction Inc | exterior window replacement at ground flr.Details
exterior window replacement at ground flr. | $50,000 |
| Apr 29, 2010 | Never finaled issued Jul 2010, no final | 2250 Hayes St | Slembrouck-Many Corporation | installation of (n) fire/life safety system. ref. appl.#200811126338.per approved p.o.a by sffd. this permit includes phases i,ii,and iii to be completed by july 2010. the 4th phase will be under separate permit to be completed by july 2013.Details
installation of (n) fire/life safety system. ref. appl.#200811126338.per approved p.o.a by sffd. this permit includes phases i,ii,and iii to be completed by july 2010. the 4th phase will be under separate permit to be completed by july 2013. | $28,075 |
| Apr 23, 2010 | Completed final sign-off Dec 2010 | 450 Stanyan St | J K M Fire Protection | add 42 sprinkler heads at 6th floorDetails
add 42 sprinkler heads at 6th floor | $12,000 |
| Mar 18, 2010 | Completed final sign-off Dec 2010 | 2250 Hayes St | H L S. Inc Dba Wolf General | 6th floor demo suite, demo sheetrock, take up carpet, demo plumbing, electrical & demo windows per ab-017.Details
6th floor demo suite, demo sheetrock, take up carpet, demo plumbing, electrical & demo windows per ab-017. | $12,000 |
| Mar 17, 2010 | Completed final sign-off Dec 2010 | 2250 Hayes St | H L S. Inc Dba Wolf General | 6th floor - changing windows like for like, cleaning the suite up by re-sheet rocking adding new carpet, cabinets, move electrical, move plumbing. move hvac ducts.Details
6th floor - changing windows like for like, cleaning the suite up by re-sheet rocking adding new carpet, cabinets, move electrical, move plumbing. move hvac ducts. | $199,000 |
| Mar 11, 2010 | Completed final sign-off Dec 2010 | 2250 Hayes St | Potter Fire Protection | ground floor-install fire sprinkler system an the ground floor of an (e) medical office building. extend from (e) building fire sprinkler riser, 148 fire sprinkler headsDetails
ground floor-install fire sprinkler system an the ground floor of an (e) medical office building. extend from (e) building fire sprinkler riser, 148 fire sprinkler heads | $40,000 |
| Jul 2, 2009 | Never finaled issued Jul 2009, no final | 450 Stanyan St | approx. 330 linear feet of direct bury piping-(2) 4" chilled water lines & (2) 3" heating/hot water lines to be installed below (e) driveways w/ connections to (e) stub-outs outside of (e) buildings.Details
approx. 330 linear feet of direct bury piping-(2) 4" chilled water lines & (2) 3" heating/hot water lines to be installed below (e) driveways w/ connections to (e) stub-outs outside of (e) buildings. | $160,000 | |
| Dec 16, 2008 | Completed final sign-off Dec 2010 | 2250 Hayes St | Dpr Construction Inc | structural demolition & upgrades to the (e) radiation therapy vault including vault foundation, load bearing walls, grade beams, radiation shielding. also included equipment anchorage & (e) slab patching details. tenant improvement at entire ground floor under pa# 2008/11/12/6338.Details
structural demolition & upgrades to the (e) radiation therapy vault including vault foundation, load bearing walls, grade beams, radiation shielding. also included equipment anchorage & (e) slab patching details. tenant improvement at entire ground floor under pa# 2008/11/12/6338. | $600,000 |
| Nov 25, 2008 | Expired or cancelled cancelled Jan 2026 | 2250 Hayes St | partial 6th flr remodel into new doctor's office consisting of 6 accessible exam rooms, accessible mens & womens public toilets and an accessible employee toilet. all other rooms and functions are fully accessibleDetails
partial 6th flr remodel into new doctor's office consisting of 6 accessible exam rooms, accessible mens & womens public toilets and an accessible employee toilet. all other rooms and functions are fully accessible | $300,000 | |
| Nov 12, 2008 | Completed final sign-off Dec 2010 | 2250 Hayes St | Dpr Construction Inc | renovation of south wing g/f to accomodate new cancer center consisting of raditation oncology center @ east end & infusion center @ the west end of the floor with shared supporting facilities in the center of the floor. mep included. remove glass block and replace with stucco & new windows.Details
renovation of south wing g/f to accomodate new cancer center consisting of raditation oncology center @ east end & infusion center @ the west end of the floor with shared supporting facilities in the center of the floor. mep included. remove glass block and replace with stucco & new windows. | $7,500,000 |
| Oct 28, 2008 | Never finaled issued Oct 2008, no final | 2250 Hayes St | approx 14200 sf of non structural full gut demo of e 1st fl medical office blg. elements include only partitions, ceiling assemblies, int finishes, mep systems, partial removal of concrete slab on gradeDetails
approx 14200 sf of non structural full gut demo of e 1st fl medical office blg. elements include only partitions, ceiling assemblies, int finishes, mep systems, partial removal of concrete slab on grade | $20,000 | |
| Feb 2, 2005 | Expired or cancelled withdrawn Jul 2005 | 450 Stanyan St | replace center antennas on all existig sectors replacing center antennas on all existing sectorsDetails
replace center antennas on all existig sectors replacing center antennas on all existing sectors | $2,500 | |
| May 21, 2003 | Expired or cancelled expired Apr 2005 | 2200 Hayes St | erect single faced indirect replacement signDetails
erect single faced indirect replacement sign | $5,000 | |
| May 21, 2003 | Never finaled issued Sep 2003, no final | 2200 Hayes St | sign replacementDetails
sign replacement | $15,000 | |
| May 21, 2003 | Never finaled issued Sep 2003, no final | 2200 Hayes St | Csi Customer Service General Contracting | erect double faced, incirect replacement signDetails
erect double faced, incirect replacement sign | $3,600 |
| May 21, 2003 | Never finaled issued Sep 2003, no final | 2200 Hayes St | Csi Customer Service General Contracting | erect single faced non illuminated signDetails
erect single faced non illuminated sign | $25,000 |
| Jun 7, 2002 | Completed final sign-off Aug 2002 | 2250 Hayes St | Csi Customer Service General Contracting | 3/f- remodel (e) medical officeDetails
3/f- remodel (e) medical office | $8,000 |
| May 16, 2002 | Expired or cancelled expired Sep 2002 | 2250 Hayes St | Csi Customer Service General Contracting | non structural demolition in rooms 18,19,20,21,22 additional permit for ti/hndicp 3rd flDetails
non structural demolition in rooms 18,19,20,21,22 additional permit for ti/hndicp 3rd fl | $5,000 |