Slembrouck-Many Corporation
- Based in
- Petaluma
- On San Francisco permits
- Apr 2010 to Mar 2019
- Last 24 months
- 0 permits filed
11 permits since 2000: 8 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2019 | Completed final sign-off Nov 2019 | 1 Shrader St | minor modification to fire life safety system adding (1) smoke detector and (1) duct detectorDetails
minor modification to fire life safety system adding (1) smoke detector and (1) duct detector | $4,680 |
| Mar 13, 2019 | Completed final sign-off Nov 2019 | 2250 Hayes St | minor modification to fire life safety system addition of 1 spot smoke detector.Details
minor modification to fire life safety system addition of 1 spot smoke detector. | $4,435 |
| Oct 2, 2014 | Never finaled issued Oct 2014, no final | 2250 Hayes St | 4th floor - install 6 new strobe lights & 1 new horn/strobe in the new t.i. area, connect to existing syncronized circuit in lobby. ref #201406269605. n/a maher ordinanceDetails
4th floor - install 6 new strobe lights & 1 new horn/strobe in the new t.i. area, connect to existing syncronized circuit in lobby. ref #201406269605. n/a maher ordinance | $3,000 |
| Mar 12, 2014 | Completed final sign-off Feb 2015 | 2250 Hayes St | 3rd floor:install new extender panel in new data room. install new smoke above booster. install 3 new duct detectors to 3 new fsd's. 3 new pull stations at each exit,monitor 1 water flow and 1 valve tamper, 17 new strobe lights and 6 new horn/strobes.Details
3rd floor:install new extender panel in new data room. install new smoke above booster. install 3 new duct detectors to 3 new fsd's. 3 new pull stations at each exit,monitor 1 water flow and 1 valve tamper, 17 new strobe lights and 6 new horn/strobes. | $15,000 |
| Oct 5, 2012 | Completed final sign-off Nov 2012 | 1 Shrader St | install new fire alarm control panel reconnect all (e) f/a devices, install smoke detector at facp. demo 4 horn/strobes, 6 smoke detectors, 1 strobe & 1 pull station in the t.i.area on the 1st floor. install new remote extender panel with sd.Details
install new fire alarm control panel reconnect all (e) f/a devices, install smoke detector at facp. demo 4 horn/strobes, 6 smoke detectors, 1 strobe & 1 pull station in the t.i.area on the 1st floor. install new remote extender panel with sd. | $11,000 |
| Oct 31, 2011 | Completed final sign-off Dec 2011 | 2250 Hayes St | 5th floor-install new extends panel in new storage room, install new smoke detector above booster. install 3 new duct detectors to 3 new fsd's. install 6 new strobe lights & 2 new horn/strobes.Details
5th floor-install new extends panel in new storage room, install new smoke detector above booster. install 3 new duct detectors to 3 new fsd's. install 6 new strobe lights & 2 new horn/strobes. | $7,000 |
| Aug 11, 2011 | Completed final sign-off Sep 2011 | 450 Stanyan St | modify existing fa system on 1st floor only. adding 1 new door holder with smokes on either side of the door. adding 2 new relays for 3 different auto doors. all 3 sets of doors will have smoke detectors on either side.Details
modify existing fa system on 1st floor only. adding 1 new door holder with smokes on either side of the door. adding 2 new relays for 3 different auto doors. all 3 sets of doors will have smoke detectors on either side. | $2,500 |
| Feb 23, 2011 | Expired or cancelled cancelled Oct 2011 | 450 Stanyan St | modify (e) fire alarm system on 1st fl. add 3 new relays to tie new door operators into fa system. add 1 new door hold and tie into (e) door hold circuit. new smoke detectors on both sides of ea set of doors with new operator's dor holdDetails
modify (e) fire alarm system on 1st fl. add 3 new relays to tie new door operators into fa system. add 1 new door hold and tie into (e) door hold circuit. new smoke detectors on both sides of ea set of doors with new operator's dor hold | $7,500 |
| Sep 27, 2010 | Completed final sign-off Dec 2010 | 450 Stanyan St | 1st & 6th floors-revision to pa# 2010-0429-1324-7 new duct smoke detectors located on the 6th floor, 3 new sprinkler switches located on the 1st floor & 3 new modules.Details
1st & 6th floors-revision to pa# 2010-0429-1324-7 new duct smoke detectors located on the 6th floor, 3 new sprinkler switches located on the 1st floor & 3 new modules. | $4,000 |
| Sep 3, 2010 | Completed final sign-off Oct 2010 | 265 Winston Dr | fire alarm system - install new booster panel, tie into (e) facp in ti area to feed 2 new pull station, 1 new smoke & 2 new duct detectors, norn/strobes & strobes to be powered by new booster panel. install a new lcd annunciator in the vestibule.Details
fire alarm system - install new booster panel, tie into (e) facp in ti area to feed 2 new pull station, 1 new smoke & 2 new duct detectors, norn/strobes & strobes to be powered by new booster panel. install a new lcd annunciator in the vestibule. | $5,500 |
| Apr 29, 2010 | Never finaled issued Jul 2010, no final | 2250 Hayes St | installation of (n) fire/life safety system. ref. appl.#200811126338.per approved p.o.a by sffd. this permit includes phases i,ii,and iii to be completed by july 2010. the 4th phase will be under separate permit to be completed by july 2013.Details
installation of (n) fire/life safety system. ref. appl.#200811126338.per approved p.o.a by sffd. this permit includes phases i,ii,and iii to be completed by july 2010. the 4th phase will be under separate permit to be completed by july 2013. | $28,075 |