Michael John Voigtlander
- License
- E11480
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E11480 at the Board for Professional Engineers
- Listed as
- authorized agent-others, engineer
- Firm
- Bwf Consulting Engineering
- Based in
- South San Francisco
- On San Francisco permits
- Oct 2013 to May 2015
3 permits since 2000 (engineer on 2 permits, authorized agent-others on 1 permit): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cannon Constructors North Inc, Nelson T Lewis Const Co Inc., Wickman Development And Construction
- Architects
- Clifton Lowe, Dara Youngdale
- Engineers
- Tommy Siu (2), Reco Vicente Prianto, Steven Rawson, Tim Heiman
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 8, 2015 | Completed final sign-off Jul 2015 | 1400 Geary Bl | Nelson T Lewis Const Co Inc. | 4th flr units 4 c&d: interior remodel: 2 studio units converted to one bedroom unit with a full bath and powder room. there is no exterior work.Details
4th flr units 4 c&d: interior remodel: 2 studio units converted to one bedroom unit with a full bath and powder room. there is no exterior work. | $85,000 |
| Jun 26, 2014 | Completed final sign-off Apr 2017 | 1830 Sutter St | Wickman Development And Construction | 2 story preschool building addition with rooftop play yard.Details
2 story preschool building addition with rooftop play yard. | $2,098,700 |
| Oct 4, 2013 | Completed final sign-off Nov 2016 | 5830 03rd St | Cannon Constructors North Inc | to erect type v, 5 stories, 1 basement, 136 units residential & parking building. (maher) compliance with ordinance no. 155-13 not required.Details
to erect type v, 5 stories, 1 basement, 136 units residential & parking building. (maher) compliance with ordinance no. 155-13 not required. | $26,000,000 |