Permit GraphShortlistSan Francisco building permits since 2000

Todd M. See

License
M30765
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M30765 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Wsp Usa
Based in
San Francsico
On San Francisco permits
Apr 2006 to Jun 2022

36 permits since 2000 (engineer on 35 permits, architect on 1 permit): 22 completed, 12 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Hathaway Dinwiddie Co. (10), Skyline Construction (5), Swinerton Builders (3), Field Construction Inc., Gci, Inc, Novo Construction Inc, Paradigm General Contractors, Rossi Builders Inc., Sc Builders, Inc, Turner Construction Co
Architects
Dan Huntsman (2), Douglas Zucker (2), John Long (2), Anne Torney, Barry Bourbon, Clifton Boswell, George S Soskin, Rollie Childers
Engineers
Jillian P. Moritz (5), Caroline Fenlon-Harding (2), Amanda J. Brownlee, Blake Dilsworth, Edward Rivera, L.H. Nishkian, Laurie K. Johnston, Ruben Villafuerte Jr., Sarah Kushera

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 10, 2022Completed
final sign-off Feb 2025
945 Market StSkyline Constructionexterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates.
Details
Permit
202206106082
Permit issued
Jul 10, 2023
Final sign-off
Feb 11, 2025

exterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates.

Open the permit page

$10,600,000
Jan 24, 2022Completed
final sign-off Mar 2023
221 Main StRossi Builders Inc.suite 1340: interior t.i. in (e) space. rmeove (e) walls. replace with full height, upgarde building security card readers, match (e) finishes. no exterior or restroom work.
Details
Permit
202201246529
Permit issued
Mar 7, 2022
Final sign-off
Mar 27, 2023

suite 1340: interior t.i. in (e) space. rmeove (e) walls. replace with full height, upgarde building security card readers, match (e) finishes. no exterior or restroom work.

Open the permit page

$528,197
Jun 9, 2021Completed
final sign-off Dec 2021
199 Fremont StSkyline Constructiondemo of existing catering kitchen and gallery/seating area. proposal includes a large catering kitchen w/ additional back of house spaces, severy stations, seating and janitor closet. improvements incl non bearing partitions, ceilings and finsihes. food to be cooked off site and served out of electr
Details
Permit
202106092033
Permit issued
Aug 4, 2021
Final sign-off
Dec 1, 2021

demo of existing catering kitchen and gallery/seating area. proposal includes a large catering kitchen w/ additional back of house spaces, severy stations, seating and janitor closet. improvements incl non bearing partitions, ceilings and finsihes. food to be cooked off site and served out of electr

Open the permit page

$3,000,000
Apr 28, 2021Expired or cancelled
withdrawn Jun 2021
575 Market Streplacement of 4 (e) cooling towers at penthouse level. towers shall be replaced in situ and connected to (e) mechanical, electrical & plumbing.
Details
Permit
202104289497

replacement of 4 (e) cooling towers at penthouse level. towers shall be replaced in situ and connected to (e) mechanical, electrical & plumbing.

Open the permit page

$1,100,000
Oct 22, 2020Completed
final sign-off Jan 2022
415 Mission StHathaway Dinwiddie Co.update plumbing documents per discussions with city plumbing department and on-site conditions. ref pa # 201802050382. permit revision # 3 submission.
Details
Permit
202010227179
Permit issued
Dec 9, 2020
Final sign-off
Jan 24, 2022

update plumbing documents per discussions with city plumbing department and on-site conditions. ref pa # 201802050382. permit revision # 3 submission.

Open the permit page

Oct 20, 2020Never finaled
issued Dec 2020, no final
101 01st Stupdates to tenant smoke control matrices (phase 2) for record on floors p1 thru 1, 3-6, 31-35, 44-61. see drawing reference list for applicable permits #'s. maher n/a.
Details
Permit
202010206964
Permit issued
Dec 2, 2020

updates to tenant smoke control matrices (phase 2) for record on floors p1 thru 1, 3-6, 31-35, 44-61. see drawing reference list for applicable permits #'s. maher n/a.

Open the permit page

Aug 25, 2020Never finaled
issued Sep 2020, no final
101 01st Stupdated smoke control matrices, phase 1. for record perposes on floors 7-30 and 39-43 ref list of applicable permits + application numbers.
Details
Permit
202008252599
Permit issued
Sep 26, 2020

updated smoke control matrices, phase 1. for record perposes on floors 7-30 and 39-43 ref list of applicable permits + application numbers.

Open the permit page

May 22, 2020Never finaled
issued Jun 2020, no final
415 Mission Stupdates to the smoke controle matrices for record purposes reference original site permit pa201303132080. maher n/a.
Details
Permit
202005227714
Permit issued
Jun 17, 2020

updates to the smoke controle matrices for record purposes reference original site permit pa201303132080. maher n/a.

Open the permit page

Mar 9, 2020Never finaled
filed Mar 2020, never issued
425 Mission Stproj-20-0304; base building mep infrastructure for future tenant improvements on ground floor & second level. ** maher: n/a **
Details
Permit
202003096542

proj-20-0304; base building mep infrastructure for future tenant improvements on ground floor & second level. ** maher: n/a **

Open the permit page

$50,000
Aug 16, 2019Never finaled
issued Dec 2019, no final
140 New Montgomery StSwinerton Buildersdeferred mep for ti full 24th floor & partial 22nd & 23rd flr ref 201908078136
Details
Permit
201908168986
Permit issued
Dec 3, 2019

deferred mep for ti full 24th floor & partial 22nd & 23rd flr ref 201908078136

Open the permit page

$250,000
Aug 28, 2018Completed
final sign-off Jun 2019
415 Mission StHathaway Dinwiddie Co.revision to smoke control fan & damper matrices on levels 60 & 61. scope also includes relocation of refrigeration rack from 61st to 60th fl. ref: pa# 201712196849(60th fl:t.i), pa# 201804166392(60th fl:rev) pa# 201712196851(61st fl.t.i.)
Details
Permit
201808288594
Permit issued
Aug 30, 2018
Final sign-off
Jun 18, 2019

revision to smoke control fan & damper matrices on levels 60 & 61. scope also includes relocation of refrigeration rack from 61st to 60th fl. ref: pa# 201712196849(60th fl:t.i), pa# 201804166392(60th fl:rev) pa# 201712196851(61st fl.t.i.)

Open the permit page

Jun 26, 2018Completed
final sign-off Jun 2019
415 Mission StHathaway Dinwiddie Co.19th, 20th & 21st flr - as built revision to smoke control fan & damper matries
Details
Permit
201806263019
Permit issued
Jul 3, 2018
Final sign-off
Jun 18, 2019

19th, 20th & 21st flr - as built revision to smoke control fan & damper matries

Open the permit page

Jun 26, 2018Completed
final sign-off Jun 2019
415 Mission StHathaway Dinwiddie Co.16th-18th flr - as built revision to smoke control fan & damper matries
Details
Permit
201806263021
Permit issued
Jul 3, 2018
Final sign-off
Jun 18, 2019

16th-18th flr - as built revision to smoke control fan & damper matries

Open the permit page

Jun 26, 2018Completed
final sign-off Jun 2019
415 Mission StHathaway Dinwiddie Co.22nd-24th flr - as built revision to smoke control fan & damper matries ref pa#s 201804237105, 201804237098, 201804237104
Details
Permit
201806263023
Permit issued
Jul 3, 2018
Final sign-off
Jun 18, 2019

22nd-24th flr - as built revision to smoke control fan & damper matries ref pa#s 201804237105, 201804237098, 201804237104

Open the permit page

May 1, 2018Completed
final sign-off Oct 2019
415 Mission StHathaway Dinwiddie Co.revision to smoke control fan & damper matrix on levels 13, 14, 15. ref pa# 201710171480 (13th), 201710171482 (14th), 201711063185 (15th). maher na
Details
Permit
201805017927
Permit issued
May 4, 2018
Final sign-off
Oct 7, 2019

revision to smoke control fan & damper matrix on levels 13, 14, 15. ref pa# 201710171480 (13th), 201710171482 (14th), 201711063185 (15th). maher na

Open the permit page

Dec 28, 2017Completed
final sign-off Feb 2019
350 Mission StGci, Incfloors 6,7,& 8: interior construction including selective demolition, relocation of drinking fountain and construction of wing wall partition. minor mechanical and electrical. n/a for maher
Details
Permit
201712287541
Permit issued
Jan 11, 2018
Final sign-off
Feb 15, 2019

floors 6,7,& 8: interior construction including selective demolition, relocation of drinking fountain and construction of wing wall partition. minor mechanical and electrical. n/a for maher

Open the permit page

$120,000
Nov 6, 2017Completed
final sign-off Sep 2019
415 Mission StHathaway Dinwiddie Co.15th floor single tenant improvement of rentire floor. work includes access flooring, partitions, mep & finishes.
Details
Permit
201711063185
Permit issued
Dec 13, 2017
Final sign-off
Sep 19, 2019

15th floor single tenant improvement of rentire floor. work includes access flooring, partitions, mep & finishes.

Open the permit page

$2,400,000
Nov 6, 2017Completed
final sign-off Jun 2019
415 Mission StHathaway Dinwiddie Co.revision to t.i.'s on 7th , 8th & 9th levels - reference pa #201705257696, #201705307943, #201705307940 - for smoke control matrix. n/a maher ordinance
Details
Permit
201711063179
Permit issued
Nov 7, 2017
Final sign-off
Jun 18, 2019

revision to t.i.'s on 7th , 8th & 9th levels - reference pa #201705257696, #201705307943, #201705307940 - for smoke control matrix. n/a maher ordinance

Open the permit page

Oct 17, 2017Completed
final sign-off Sep 2019
415 Mission StHathaway Dinwiddie Co.13th floor - single tenant improvement for entire 13th fl. work includes access flooring, partitions, mep & finishes. maher na
Details
Permit
201710171480
Permit issued
Nov 1, 2017
Final sign-off
Sep 19, 2019

13th floor - single tenant improvement for entire 13th fl. work includes access flooring, partitions, mep & finishes. maher na

Open the permit page

$3,100,000
Oct 6, 2017Completed
final sign-off May 2019
560 Mission StParadigm General Contractors5th fl: demo & office/conference rm, improvements of pantry & minor ti, inter. drywall & finishes, new sink & mechanical & electrical. maher na
Details
Permit
201710060625
Permit issued
May 24, 2018
Final sign-off
May 29, 2019

5th fl: demo & office/conference rm, improvements of pantry & minor ti, inter. drywall & finishes, new sink & mechanical & electrical. maher na

Open the permit page

$150,000
Oct 6, 2017Expired or cancelled
cancelled Jan 2026
560 Mission St3rd fl: demo & office/conference rm, ti work at pantry & some office areas. work includes drywall, finishes, mechanical & electrical. maher na
Details
Permit
201710060623

3rd fl: demo & office/conference rm, ti work at pantry & some office areas. work includes drywall, finishes, mechanical & electrical. maher na

Open the permit page

$150,000
Jul 12, 2017Never finaled
issued Nov 2017, no final
415 Mission StSkyline Construction47th fl - mep for 2017-0517-6809. n/a for maher
Details
Permit
201707121598
Permit issued
Nov 6, 2017

47th fl - mep for 2017-0517-6809. n/a for maher

Open the permit page

$838,755
Jul 12, 2017Never finaled
issued Nov 2017, no final
415 Mission StSkyline Construction49th fl - mep for 2017-0517-6810. n/a for maher
Details
Permit
201707121593
Permit issued
Nov 6, 2017

49th fl - mep for 2017-0517-6810. n/a for maher

Open the permit page

$820,000
Jul 12, 2017Never finaled
issued Nov 2017, no final
415 Mission StSkyline Construction48th fl - mep for 2017-0517-6807
Details
Permit
201707121596
Permit issued
Nov 6, 2017

48th fl - mep for 2017-0517-6807

Open the permit page

$752,220
Jun 2, 2017Never finaled
issued Jun 2017, no final
50 Fremont StNovo Construction Inc18th fl: installation of (3) new heat pumps, includes electrical and condensate piping. (3) new heat pumps to be installed within the ceiling (2) cwp installed in ceiling, electrical connection to new mechanical equipment and condensate piping for new mechanical units to janitors sink. maher na
Details
Permit
201706028295
Permit issued
Jun 8, 2017

18th fl: installation of (3) new heat pumps, includes electrical and condensate piping. (3) new heat pumps to be installed within the ceiling (2) cwp installed in ceiling, electrical connection to new mechanical equipment and condensate piping for new mechanical units to janitors sink. maher na

Open the permit page

$200,000
May 25, 2017Never finaled
issued Jun 2017, no final
101 01st StHathaway Dinwiddie Co.revision to pa 2013-0313-2080s3/r5 relocate fuel oil vent pipes
Details
Permit
201705257697
Permit issued
Jun 6, 2017

revision to pa 2013-0313-2080s3/r5 relocate fuel oil vent pipes

Open the permit page

$1,000
Aug 5, 2016Completed
final sign-off Apr 2017
405 Howard StSc Builders, Inc3/f- rev.to pa#201606109611, atrium to be made "not occupied",new structural infill below new restrooms, minor mep. finish, power, ceiling and millwork revisions.removed 12 fsds associated w/ previous multi zone occupancy. n/a ordinance #155-13
Details
Permit
201608054300
Permit issued
Aug 10, 2016
Final sign-off
Apr 18, 2017

3/f- rev.to pa#201606109611, atrium to be made "not occupied",new structural infill below new restrooms, minor mep. finish, power, ceiling and millwork revisions.removed 12 fsds associated w/ previous multi zone occupancy. n/a ordinance #155-13

Open the permit page

$90,000
May 16, 2016Never finaled
issued Jun 2016, no final
845 Market St4th flr: mep only, architectural under pa 201604275824; new offices and upgrade restroom, t.i. space change of use from retail to office; maher n/a
Details
Permit
201605167552
Permit issued
Jun 14, 2016

4th flr: mep only, architectural under pa 201604275824; new offices and upgrade restroom, t.i. space change of use from retail to office; maher n/a

Open the permit page

$20,000
Apr 29, 2008Never finaled
issued May 2008, no final
835 Market StTurner Construction Co8th floor-reference pa# 2008-0423-0480-mechanical, electrical and plumbing. mech & elec. t-24
Details
Permit
200804290869
Permit issued
May 7, 2008

8th floor-reference pa# 2008-0423-0480-mechanical, electrical and plumbing. mech & elec. t-24

Open the permit page

$770,000
Apr 3, 2007Completed
final sign-off Aug 2007
835 Market Stoti-2, forest city development, 8th floor, el, me.
Details
Permit
200704037944
Permit issued
May 8, 2007
Final sign-off
Aug 14, 2007

oti-2, forest city development, 8th floor, el, me.

Open the permit page

$250,000
Apr 3, 2007Completed
final sign-off Aug 2007
835 Market Stoti-1, forest city development, 8th floor, el, me, ls, sp.
Details
Permit
200704037941
Permit issued
May 24, 2007
Final sign-off
Aug 14, 2007

oti-1, forest city development, 8th floor, el, me, ls, sp.

Open the permit page

$350,000
Sep 13, 2006Completed
final sign-off Jan 2007
835 Market StSwinerton Buildersoti-2 5th floor, el, me.
Details
Permit
200609132147
Permit issued
Oct 27, 2006
Final sign-off
Jan 16, 2007

oti-2 5th floor, el, me.

Open the permit page

$25,000
Sep 13, 2006Completed
final sign-off Dec 2007
835 Market StSwinerton Buildersoti-1 5th floor el, me, l/s, sp
Details
Permit
200609132146
Permit issued
Oct 27, 2006
Final sign-off
Dec 13, 2007

oti-1 5th floor el, me, l/s, sp

Open the permit page

$63,056
May 3, 2006Completed
final sign-off Aug 2007
835 Market Strevision to addenda 7 base building fire alarm, smoke control panel revision.
Details
Permit
200605030615
Permit issued
May 8, 2006
Final sign-off
Aug 24, 2007

revision to addenda 7 base building fire alarm, smoke control panel revision.

Open the permit page

Apr 27, 2006Completed
final sign-off Jan 2007
845 Market Stcti-2, bart level (basement) fe4 'coriander' el, me.
Details
Permit
200604270085
Permit issued
Jul 10, 2006
Final sign-off
Jan 4, 2007

cti-2, bart level (basement) fe4 'coriander' el, me.

Open the permit page

$113,646
Apr 27, 2006Completed
final sign-off Nov 2006
845 Market StField Construction Inc.buckhorn, basement, space# fe 5. cti-2, el, me.
Details
Permit
200604270092
Permit issued
Aug 17, 2006
Final sign-off
Nov 21, 2006

buckhorn, basement, space# fe 5. cti-2, el, me.

Open the permit page

$150,000