Robert D Kerns
- License
- C34664
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Forge
- Based in
- San Francisco
- On San Francisco permits
- Nov 2020 to May 2022
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- C B 2 Builders Incorporated, Novo Construction Inc, Rudolph Commercial Interiors Inc, Rci
- Engineers
- Andrew Shuck, Teresa Emery
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2022 | Completed final sign-off Apr 2023 | 200 Larkin St | C B 2 Builders Incorporated | removal of existing concrete paver and pedestal system installed as part of gallery expansion, in preparation for a new pedestal paver system per ab-017Details
removal of existing concrete paver and pedestal system installed as part of gallery expansion, in preparation for a new pedestal paver system per ab-017 | $10,000 |
| Jan 13, 2021 | Completed final sign-off Dec 2023 | 394 Pacific Av | Rudolph Commercial Interiors Inc, Rci | remove and replace sidewalk slab & underground vaultDetails
remove and replace sidewalk slab & underground vault | $350,000 |
| Nov 6, 2020 | Completed final sign-off Sep 2021 | 600 California St | Novo Construction Inc | waterproofing/paver maintenance and barrier removal at exterior upper plaza. removal of exerior stone pavers, waterproofing system, exerior wall panels, and planter. construction of new paving, waterproofing systems, and reinstallation of (e) exterior wall panels and planter.Details
waterproofing/paver maintenance and barrier removal at exterior upper plaza. removal of exerior stone pavers, waterproofing system, exerior wall panels, and planter. construction of new paving, waterproofing systems, and reinstallation of (e) exterior wall panels and planter. | $120,000 |