Block 0260, lot 016
433 California St
- City’s use
- Commercial Office
- Built
- 1913
- Stories
- 11
- Building
- 108,925 sq ft
- Lot
- 17,481 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
119 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2023 | Never finaled filed Jun 2023, never issued | 433 California St | t.i. on single floor: new non-load bearing partitions, floor finishes, ceilings, millwork, ligihting, plumbing, hvac distribution, electrical distribution.Details
t.i. on single floor: new non-load bearing partitions, floor finishes, ceilings, millwork, ligihting, plumbing, hvac distribution, electrical distribution. | $2,180,000 | |
| Dec 12, 2022 | Never finaled issued Dec 2022, no final | 433 California St | Pioneer Fire Inc. | fire sprinklers 11th fl: convert (71) pendents to uprights remove (14) pendents. gc ti pa# 202212087912Details
fire sprinklers 11th fl: convert (71) pendents to uprights remove (14) pendents. gc ti pa# 202212087912 | $30,000 |
| Dec 8, 2022 | Completed final sign-off May 2024 | 433 California St | Principal Builders Inc. | 11/f: ti: demo of non bearing partitions, men and women restrooms, ceilings, light fixtures, electrical, finishes and millwork.Details
11/f: ti: demo of non bearing partitions, men and women restrooms, ceilings, light fixtures, electrical, finishes and millwork. | $60,000 |
| Feb 4, 2021 | Never finaled issued Apr 2021, no final | 433 California St | Bilcor Inc | fire life safety: install (1) dedicated elevator sub-panel, (3) control relay module, (1) dual monitor module, (14) smoke detector w/base, (1) cellular communicatorDetails
fire life safety: install (1) dedicated elevator sub-panel, (3) control relay module, (1) dual monitor module, (14) smoke detector w/base, (1) cellular communicator | $13,200 |
| Jan 15, 2020 | Never finaled issued Jan 2020, no final | 433 California St | change use at 2nd fl, suite 210 from office to instructional use. no demolition or construction workDetails
change use at 2nd fl, suite 210 from office to instructional use. no demolition or construction work | ||
| Aug 13, 2019 | Never finaled issued Aug 2019, no final | 433 California St | street space w/mtaDetails
street space w/mta | ||
| Jun 17, 2015 | Completed final sign-off Sep 2015 | 433 California St | Matrix Hg Inc | roof level - replace existing r-11 centrifugal chiller with new r-134a high efficiency helical rotary chiller in the same location. connect to existing electrical service, revise piping as required to accommodate the new chiller. provide new insulation on all new chilled water piping. n/a maher ordiDetails
roof level - replace existing r-11 centrifugal chiller with new r-134a high efficiency helical rotary chiller in the same location. connect to existing electrical service, revise piping as required to accommodate the new chiller. provide new insulation on all new chilled water piping. n/a maher ordi | $125,000 |
| Mar 11, 2015 | Expired or cancelled withdrawn Apr 2015 | 50 Leidesdorff St | gr fl interior restaurant "b"occupancy includes new seating, bar, kitchen, storage, disabled access restrooms, new finishes throughout, basement work includes new walk in cooler, employee lockers, storage. mep and title 24 under sep permit. n/a for maherDetails
gr fl interior restaurant "b"occupancy includes new seating, bar, kitchen, storage, disabled access restrooms, new finishes throughout, basement work includes new walk in cooler, employee lockers, storage. mep and title 24 under sep permit. n/a for maher | $201,000 | |
| Dec 9, 2014 | Expired or cancelled cancelled Jul 2019 | 50 Leidesdorff St | replacement of exterior storefront, entry doors, exterior are a way improvements for outdoor dining. with new trellis & outdoor lighting. new signage along leidesdorff street under separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
replacement of exterior storefront, entry doors, exterior are a way improvements for outdoor dining. with new trellis & outdoor lighting. new signage along leidesdorff street under separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $165,000 | |
| May 12, 2014 | Completed final sign-off May 2014 | 433 California St | Bilcor Inc | 6th floor - remove amd replace 2 wall mount horn-strobes, remove and replace 1 wall strobe, install 4 wall mount horn-strobes. t.i. #2014.0429.4438. maher n/a.Details
6th floor - remove amd replace 2 wall mount horn-strobes, remove and replace 1 wall strobe, install 4 wall mount horn-strobes. t.i. #2014.0429.4438. maher n/a. | $2,800 |
| Apr 29, 2014 | Completed final sign-off Aug 2014 | 433 California St | Ayoob & Peery Plumbing Co Inc | 6th floor - relocate fire sprinkler heads per tenant improvement ( 2 relocate) . ref #2014.0416.3326. compliance with ordinance #155-13 not requiredDetails
6th floor - relocate fire sprinkler heads per tenant improvement ( 2 relocate) . ref #2014.0416.3326. compliance with ordinance #155-13 not required | $1,028 |
| Apr 16, 2014 | Completed final sign-off Feb 2015 | 433 California St | Novo Construction Inc | #600: t.i. work for construction of some non-load bearing partitions, new carpet and paint finishes, new furniture systems. extg base bldg infrastructure systems to remain in place. no structural work required. n/a for the maher ordinance #155-13- sprinklers and fire alarm separate permit.Details
#600: t.i. work for construction of some non-load bearing partitions, new carpet and paint finishes, new furniture systems. extg base bldg infrastructure systems to remain in place. no structural work required. n/a for the maher ordinance #155-13- sprinklers and fire alarm separate permit. | $92,000 |
| Sep 23, 2013 | Completed final sign-off Oct 2013 | 433 California St | Bilcor Inc | provide fire alarm monitoring module to connect to fire alarm system for an existing suppression panel installed under application number 2011-0527-6955 at the server room on 7th floor.Details
provide fire alarm monitoring module to connect to fire alarm system for an existing suppression panel installed under application number 2011-0527-6955 at the server room on 7th floor. | $1,000 |
| Sep 12, 2013 | Never finaled issued Sep 2013, no final | 433 California St | Intelligent Technologies & Services Inc | to obtain final inspection for work approved under pa# 201105276955. all work is complete.Details
to obtain final inspection for work approved under pa# 201105276955. all work is complete. | |
| Jan 7, 2013 | Never finaled issued Jan 2013, no final | 433 California St | C B F Inc | ti#2012-09-24-0445. install 10 ceiling horn-strobes. install 2 ceiling strobes. install 3 smoke detector with base, connect new notification circuit to existing circuit#3.Details
ti#2012-09-24-0445. install 10 ceiling horn-strobes. install 2 ceiling strobes. install 3 smoke detector with base, connect new notification circuit to existing circuit#3. | $4,500 |
| Jan 7, 2013 | Expired or cancelled cancelled Sep 2023 | 433 California St | C B F Inc | ti pa#2012-09-24-0445. install 10 ceiling horn-strobes, install 3 smoke detector w/ base, connect new notification circuit to (e) circuit #3.Details
ti pa#2012-09-24-0445. install 10 ceiling horn-strobes, install 3 smoke detector w/ base, connect new notification circuit to (e) circuit #3. | |
| Dec 17, 2012 | Never finaled issued Dec 2012, no final | 433 California St | Pribuss Engineering Inc | revision to pa#2012-10-17-2215. fire sprinkler t.i. as built per inspector. relocate 37 sprinklers, add 6 sprinklers, total 43.Details
revision to pa#2012-10-17-2215. fire sprinkler t.i. as built per inspector. relocate 37 sprinklers, add 6 sprinklers, total 43. | |
| Oct 17, 2012 | Completed final sign-off Mar 2013 | 433 California St | Pribuss Engineering Inc | fire sprinkler t.i. relocate 38 sprinkler. add 6. ti. ref pa# 201209240445.Details
fire sprinkler t.i. relocate 38 sprinkler. add 6. ti. ref pa# 201209240445. | $22,643 |
| Sep 24, 2012 | Completed final sign-off Mar 2013 | 433 California St | Nibbi Bros Assoc Inc. | work in suite 210 & 220: non structural interior tenant improvement to e office spaces on the 2nd fl. combine 2 suites and associated restroom accessibility. mep, sprinkler/life safety separate permits.Details
work in suite 210 & 220: non structural interior tenant improvement to e office spaces on the 2nd fl. combine 2 suites and associated restroom accessibility. mep, sprinkler/life safety separate permits. | $1,167,446 |
| Feb 28, 2012 | Completed final sign-off Mar 2012 | 433 California St | Carter Brothers Fire & Life Safety | suite #600-add 5 new horn/strobes to an (e) fire alarm systemDetails
suite #600-add 5 new horn/strobes to an (e) fire alarm system | $5,600 |
| May 27, 2011 | Completed final sign-off Nov 2013 | 433 California St | Intelligent Technologies & Services Inc | 7th floor server room - install new clean agent fire protection system.Details
7th floor server room - install new clean agent fire protection system. | $9,099 |
| May 24, 2011 | Completed final sign-off May 2011 | 433 California St | Carter Brothers Fire & Life Safety | #1100 as builts for ap #201105176206 for fire alarm. this includes 1 pull station, 4 wall horn/strobe, 1 wall strobe, 2 ceiling horn/strobes. replace 2 - 110 horn/strobes with 135 cd horn strobes.Details
#1100 as builts for ap #201105176206 for fire alarm. this includes 1 pull station, 4 wall horn/strobe, 1 wall strobe, 2 ceiling horn/strobes. replace 2 - 110 horn/strobes with 135 cd horn strobes. | |
| May 17, 2011 | Completed final sign-off Jun 2011 | 433 California St | Carter Brothers Fire & Life Safety | 11th floor suite #1100 - add to an existing fire alarm system new fa devices in t.i. ( ap #201104214589) this includes 7 new strobes.Details
11th floor suite #1100 - add to an existing fire alarm system new fa devices in t.i. ( ap #201104214589) this includes 7 new strobes. | $4,900 |
| Apr 21, 2011 | Completed final sign-off Jun 2011 | 433 California St | U A Construction | 11th flr: demo partition walls, relocate walls,relocate electrical, relocate hvac thermostat, replace carpet and paintDetails
11th flr: demo partition walls, relocate walls,relocate electrical, relocate hvac thermostat, replace carpet and paint | $66,794 |
| Oct 19, 2010 | Completed final sign-off Dec 2010 | 70 Leidesdorff St | installation of new ventless (ul listed) cooktop system. installation of exhaust fan system. fire suppression system and fire alrm connection separate permit.Details
installation of new ventless (ul listed) cooktop system. installation of exhaust fan system. fire suppression system and fire alrm connection separate permit. | $2,000 | |
| Sep 21, 2010 | Completed final sign-off Nov 2010 | 433 California St | Carter Brothers Fire & Life Safety | 10th floor, suite 1030 - add new speakers & strobes to an (e) fire alarm system in a (n) t.i. space. this includes 4-speakers/strobes & 3-strobes.Details
10th floor, suite 1030 - add new speakers & strobes to an (e) fire alarm system in a (n) t.i. space. this includes 4-speakers/strobes & 3-strobes. | $4,700 |
| Jun 25, 2010 | Completed final sign-off Dec 2010 | 433 California St | Ayoob & Peery Plumbing Co Inc | relocate & remove fire sprinkler heads per tenant improvements. 2-relocate, 2-remove.Details
relocate & remove fire sprinkler heads per tenant improvements. 2-relocate, 2-remove. | $1,200 |
| May 25, 2010 | Completed final sign-off Sep 2010 | 433 California St | Commercial Interior Builders Inc | ste 300 minor tenant improvement: expand tel/comroom, new millwork in break room, enclose area for conf. room. change men's restroom stall swing, relocate light fixture. mep under separate permit, sprinkler & life safety as req'd.Details
ste 300 minor tenant improvement: expand tel/comroom, new millwork in break room, enclose area for conf. room. change men's restroom stall swing, relocate light fixture. mep under separate permit, sprinkler & life safety as req'd. | $38,500 |
| Apr 22, 2010 | Never finaled issued May 2010, no final | 70 Leidesdorff St | install exhaust and return air ducts for ventilation of cooking appliances (aka 453 california st.)Details
install exhaust and return air ducts for ventilation of cooking appliances (aka 453 california st.) | $6,000 | |
| Nov 16, 2009 | Completed final sign-off Dec 2009 | 433 California St | G L C Construction Company Inc | 5th floor. minor demolition patch & repair, join 2 suites.Details
5th floor. minor demolition patch & repair, join 2 suites. | $30,000 |
| Jul 29, 2009 | Completed final sign-off Aug 2009 | 433 California St | electrical work on 8th fl. install new lights, switches, occupancy sensors. ti approved under 2009.07.08.2222Details
electrical work on 8th fl. install new lights, switches, occupancy sensors. ti approved under 2009.07.08.2222 | $12,000 | |
| Jul 22, 2009 | Completed final sign-off Aug 2009 | 433 California St | C B F Inc | life safety system monofratien. on 8th floor. strobe light & 3 horn/strobes.Details
life safety system monofratien. on 8th floor. strobe light & 3 horn/strobes. | $1,500 |
| Jul 8, 2009 | Completed final sign-off Aug 2009 | 433 California St | Merrcon Inc. | 8th fl-tenant improvement to (e) ste on multi-tenant flr-new demising of ste from 1 ste into 2 stes, reduce size of telecom area to make rm for new office,no new lights/mechanical. 20% ada upgrade to include new automatic door opener @ mens restrm entry. electrical & life safety under seperate permDetails
8th fl-tenant improvement to (e) ste on multi-tenant flr-new demising of ste from 1 ste into 2 stes, reduce size of telecom area to make rm for new office,no new lights/mechanical. 20% ada upgrade to include new automatic door opener @ mens restrm entry. electrical & life safety under seperate perm | $31,500 |
| Jun 4, 2009 | Completed final sign-off Jul 2009 | 433 California St | Merrcon Inc. | to obtain fianl inspection for work approved under pa#200710185727. all work has been completed.Details
to obtain fianl inspection for work approved under pa#200710185727. all work has been completed. | |
| Jun 4, 2009 | Completed final sign-off Jul 2009 | 433 California St | Merrcon Inc. | to obtain fianl inspection for work approved under pa#200708078922. all work has been completed.Details
to obtain fianl inspection for work approved under pa#200708078922. all work has been completed. | |
| Jun 4, 2009 | Completed final sign-off Jul 2009 | 433 California St | Merrcon Inc. | to obtain fianl inspection for work approved under pa#200710115206. all work has been completed.Details
to obtain fianl inspection for work approved under pa#200710115206. all work has been completed. | |
| Jun 4, 2009 | Completed final sign-off Jul 2009 | 433 California St | Merrcon Inc. | to obtain fianl inspection for work approved under pa#200710104940. all work has been completed.Details
to obtain fianl inspection for work approved under pa#200710104940. all work has been completed. | |
| May 13, 2009 | Completed final sign-off Jul 2009 | 433 California St | Fabpro | tank restraints for existing water storage tanks in basement and 2 in rooftop enclosed mechanical room.Details
tank restraints for existing water storage tanks in basement and 2 in rooftop enclosed mechanical room. | $22,500 |
| Mar 6, 2008 | Never finaled issued Mar 2008, no final | 433 California St | Tyco Integrated Security | replace old dialer with new comminicator panel unidode 5ud and install new smoke detector above. connect ex. panel to new dialer to monitor alarm and trouble per nfpa 72 remote system monitoring all work in basement.Details
replace old dialer with new comminicator panel unidode 5ud and install new smoke detector above. connect ex. panel to new dialer to monitor alarm and trouble per nfpa 72 remote system monitoring all work in basement. | $2,338 |
| Oct 18, 2007 | Expired or cancelled expired Jun 2009 | 433 California St | C B F Inc | life safety modifications on the 2nd floor. furnish and install 1 dual sync. module, 2 strobe lights and 5 horn strobe lightsDetails
life safety modifications on the 2nd floor. furnish and install 1 dual sync. module, 2 strobe lights and 5 horn strobe lights | $3,800 |
| Oct 12, 2007 | Never finaled issued Oct 2007, no final | 433 California St | Mc Millan Electric | electrical 2nd floor. install 2 x 2 fixtures, switches, duplex receptacles, tele data provisions. relocate existing down lights to 2 x 4 fixture. addition of ceiling mounted & wall mounted occupancy sensors.Details
electrical 2nd floor. install 2 x 2 fixtures, switches, duplex receptacles, tele data provisions. relocate existing down lights to 2 x 4 fixture. addition of ceiling mounted & wall mounted occupancy sensors. | $20,000 |
| Oct 11, 2007 | Expired or cancelled expired Jul 2009 | 433 California St | Merrcon Inc. | mechanical work. add vav's supply ducting permit #1128520 app #200708078922Details
mechanical work. add vav's supply ducting permit #1128520 app #200708078922 | $17,000 |
| Oct 10, 2007 | Expired or cancelled expired May 2009 | 433 California St | Geo M Robinson & Co | alteration to existing fire sprinkler system for bostom medical group in 2nd level. relocate 9 sprinkler heads.Details
alteration to existing fire sprinkler system for bostom medical group in 2nd level. relocate 9 sprinkler heads. | $3,900 |
| Aug 7, 2007 | Expired or cancelled expired May 2009 | 433 California St | Merrcon Inc. | t.i.consists of interior remodel of existing office suite i ncluding accessible sink,casework, construction of new partitions, alteration to ceiling & light fixtures. add power locations.new finishes throughout.mep & fire/life safety under seperate permit.no exterior workDetails
t.i.consists of interior remodel of existing office suite i ncluding accessible sink,casework, construction of new partitions, alteration to ceiling & light fixtures. add power locations.new finishes throughout.mep & fire/life safety under seperate permit.no exterior work | $145,500 |
| Mar 21, 2007 | Completed final sign-off Apr 2007 | 433 California St | Merrcon Inc. | oti rev. (rev. to #2007/01/23/2376)Details
oti rev. (rev. to #2007/01/23/2376) | $50 |
| Jan 23, 2007 | Completed final sign-off Apr 2007 | 433 California St | Hawk Mechanical Inc | adding one vav cooling only box with new ceiling diffusers.Details
adding one vav cooling only box with new ceiling diffusers. | $8,100 |
| Dec 19, 2006 | Completed final sign-off Jan 2007 | 433 California St | Merrcon Inc. | plvg 2 existing sprnkler heads that were observed to be too close together asfter interior partitions were removedDetails
plvg 2 existing sprnkler heads that were observed to be too close together asfter interior partitions were removed | $300 |
| Nov 28, 2006 | Completed final sign-off Jan 2007 | 433 California St | C B F Inc | 6th floor-life safety system modification at 433 california street suite 620-adelco, 1 dual sync module, 1 pull station, 5 strobe lights (wall mount), 3 horns/strobes (wall mount), 1 remote notification power supply.Details
6th floor-life safety system modification at 433 california street suite 620-adelco, 1 dual sync module, 1 pull station, 5 strobe lights (wall mount), 3 horns/strobes (wall mount), 1 remote notification power supply. | $6,000 |
| Nov 28, 2006 | Completed final sign-off Mar 2007 | 433 California St | C B F Inc | 10th floor-life safety system modifications-433 california street, 10th floor forward mgmt. 2 storbe lights, 5 horn/strobes & 1 pull station.Details
10th floor-life safety system modifications-433 california street, 10th floor forward mgmt. 2 storbe lights, 5 horn/strobes & 1 pull station. | $4,500 |
| Nov 9, 2006 | Completed final sign-off Jan 2007 | 433 California St | Merrcon Inc. | oti-1 6th floor el, me, l/sDetails
oti-1 6th floor el, me, l/s | $20,400 |
| Nov 7, 2006 | Completed final sign-off Mar 2007 | 433 California St | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvements. (7) relocates,(2) remove.Details
relocate fire sprinkler heads per tenant improvements. (7) relocates,(2) remove. | $1,400 |
| Oct 5, 2006 | Completed final sign-off Apr 2007 | 433 California St | Anderson, Rowe & Buckley, Inc. | 2nd floor-t.i. (e) fire sprinkler system-2 new sprinklers, 3 removed sprinklers & 34 relocated sprinklers.Details
2nd floor-t.i. (e) fire sprinkler system-2 new sprinklers, 3 removed sprinklers & 34 relocated sprinklers. | $8,000 |
| Sep 26, 2006 | Completed final sign-off Mar 2007 | 433 California St | C B F Inc | life safety modification @ 433 california street. 9th floor. install 1 new dual sync module & 1 ceiling mounted horn strobe & relocate 4 strobes & 3 horn / strobes (wall mounted)Details
life safety modification @ 433 california street. 9th floor. install 1 new dual sync module & 1 ceiling mounted horn strobe & relocate 4 strobes & 3 horn / strobes (wall mounted) | $5,000 |
| Sep 26, 2006 | Completed final sign-off Mar 2007 | 433 California St | Hawk Mechanical Inc | add one vav cooling only box, some ceiling diffusers and return air grilles.Details
add one vav cooling only box, some ceiling diffusers and return air grilles. | $17,000 |
| Sep 21, 2006 | Completed final sign-off Mar 2007 | 433 California St | Mc Millan Electric | 9th floor - connecting new or relocated high fixtures & power outlets to (e) panels. no changes have been made to the (e) base building electrical system.Details
9th floor - connecting new or relocated high fixtures & power outlets to (e) panels. no changes have been made to the (e) base building electrical system. | $17,000 |
| Sep 13, 2006 | Completed final sign-off Apr 2007 | 433 California St | Principal Builders Inc. | oti-2 2nd floor el, meDetails
oti-2 2nd floor el, me | $45,000 |
| Aug 31, 2006 | Completed final sign-off Mar 2007 | 433 California St | Geo M Robinson & Co | alteration to existing fire sprinkler system: relocate 14, add: 1 ceiling sprinklers due to new wall and/or ceiling configurations.Details
alteration to existing fire sprinkler system: relocate 14, add: 1 ceiling sprinklers due to new wall and/or ceiling configurations. | $3,600 |
| Aug 29, 2006 | Completed final sign-off Apr 2007 | 433 California St | C B F Inc | 2nd floor-alteration to (e) fire sprinkler system: relocate 14, add 1 ceiling sprinklers due top new wall and/or ceiling configurations.Details
2nd floor-alteration to (e) fire sprinkler system: relocate 14, add 1 ceiling sprinklers due top new wall and/or ceiling configurations. | $8,500 |
| Aug 23, 2006 | Completed final sign-off Apr 2007 | 433 California St | Principal Builders Inc. | oti-1, 2nd floor, el, me, ls, sp.Details
oti-1, 2nd floor, el, me, ls, sp. | $138,500 |
| Aug 18, 2006 | Completed final sign-off Mar 2007 | 433 California St | Principal Builders Inc. | demo of non-load learing walls and existing flooring, rubber base, millwork, fixtures and toilet partitions.Details
demo of non-load learing walls and existing flooring, rubber base, millwork, fixtures and toilet partitions. | $8,500 |
| Aug 16, 2006 | Completed final sign-off Apr 2007 | 433 California St | Merrcon Inc. | remove interior partition walls, add one additional office at 10th floor only. for lighting only sprinklers, mechanical and electrical work will be under separate permit. no increase in office space.Details
remove interior partition walls, add one additional office at 10th floor only. for lighting only sprinklers, mechanical and electrical work will be under separate permit. no increase in office space. | $30,000 |
| Aug 4, 2006 | Completed final sign-off Mar 2007 | 433 California St | Merrcon Inc. | cut & patch remodel of existing tenant space. reconfigure office walls, revise lighting & finishes. space will remain partially occupied. safety submitted seperately.Details
cut & patch remodel of existing tenant space. reconfigure office walls, revise lighting & finishes. space will remain partially occupied. safety submitted seperately. | $200,000 |
| Aug 3, 2006 | Completed final sign-off Oct 2006 | 433 California St | Wcp Svcs, Dba: Venture Builders | oti-3 4th floor me.Details
oti-3 4th floor me. | $20,000 |
| Jul 18, 2006 | Completed final sign-off Oct 2006 | 433 California St | Wcp Svcs, Dba: Venture Builders | oti-2, 4th fl, el.Details
oti-2, 4th fl, el. | $25,000 |
| Jul 11, 2006 | Completed final sign-off Oct 2006 | 433 California St | C B F Inc | life safety system modifications at 433 california st. 4th floor - approx. 4 devicesDetails
life safety system modifications at 433 california st. 4th floor - approx. 4 devices | $1,000 |
| Jun 1, 2006 | Completed final sign-off Oct 2006 | 433 California St | oti-1 4th floor, ls, el, ls, sp. t.i.- existing tenant taking over vacant suite to become full floor tenant. work in expansion area and elevator lobby only. demolition,construction of new offices & expand reception & conf. room. new & (e)ceiling/lighting, new power/data outlets,minor millworkDetails
oti-1 4th floor, ls, el, ls, sp. t.i.- existing tenant taking over vacant suite to become full floor tenant. work in expansion area and elevator lobby only. demolition,construction of new offices & expand reception & conf. room. new & (e)ceiling/lighting, new power/data outlets,minor millwork | $56,000 | |
| Mar 13, 2006 | Completed final sign-off Apr 2006 | 441 California St | Wcp Svcs, Dba: Venture Builders | sprinklers- ref. appl#200602023636 ground floorDetails
sprinklers- ref. appl#200602023636 ground floor | $7,500 |
| Mar 1, 2006 | Completed final sign-off Apr 2006 | 441 California St | Wcp Svcs, Dba: Venture Builders | electrical only, reference no 200602023636 for t.i.Details
electrical only, reference no 200602023636 for t.i. | $14,925 |
| Feb 28, 2006 | Completed final sign-off Apr 2006 | 441 California St | C B F Inc | life safety/fire alarm modifications at 441 california, 1st floor, copy station. 1 pull statin, 4 horn strobesDetails
life safety/fire alarm modifications at 441 california, 1st floor, copy station. 1 pull statin, 4 horn strobes | $2,500 |
| Feb 16, 2006 | Completed final sign-off Apr 2006 | 441 California St | Wcp Svcs, Dba: Venture Builders | rvision to 200602023636-ground floor= restroom moved closer to existing waste pipe, mill work omitted. mechinical nad electrical work under eparate permit for200602023636Details
rvision to 200602023636-ground floor= restroom moved closer to existing waste pipe, mill work omitted. mechinical nad electrical work under eparate permit for200602023636 | |
| Feb 8, 2006 | Never finaled issued Feb 2006, no final | 433 California St | interior non structural demolition only under this permit. handicapped access to comply with admin bulletion ab017 sfbc. demolition of partitions, ceiling, finishes, sinks, elec panel in 1 suite on gr floorDetails
interior non structural demolition only under this permit. handicapped access to comply with admin bulletion ab017 sfbc. demolition of partitions, ceiling, finishes, sinks, elec panel in 1 suite on gr floor | $7,500 | |
| Feb 2, 2006 | Completed final sign-off Apr 2006 | 441 California St | no structural work, no change to use or coccupancy. new partitions, millwork, finshes, ceiling, and light fixtures, elec sork and plumbing,new accessible toilet rm. mech sep permit. fire alarm/sprk sep appDetails
no structural work, no change to use or coccupancy. new partitions, millwork, finshes, ceiling, and light fixtures, elec sork and plumbing,new accessible toilet rm. mech sep permit. fire alarm/sprk sep app | $100,000 | |
| Aug 10, 2005 | Completed final sign-off Aug 2005 | 433 California St | C B F Inc | l/s modifications: revision to 200507299024 3rd fl, 200507299020 4th fl symbol changes from sf to fDetails
l/s modifications: revision to 200507299024 3rd fl, 200507299020 4th fl symbol changes from sf to f | |
| Jul 29, 2005 | Completed final sign-off Aug 2005 | 433 California St | C B F Inc | l/s modifications @433 california 3/f furnish & install 1 strobe,delete 1 smoke det. & add 1 smokeDetails
l/s modifications @433 california 3/f furnish & install 1 strobe,delete 1 smoke det. & add 1 smoke | $1,000 |
| Jul 29, 2005 | Never finaled issued Jul 2005, no final | 433 California St | C B F Inc | l/s modifications @433 california 4/f furnish & install 1 fire smoke damper & emergency doorDetails
l/s modifications @433 california 4/f furnish & install 1 fire smoke damper & emergency door | $800 |
| Jul 18, 2005 | Completed final sign-off Aug 2005 | 433 California St | Wcp Svcs, Dba: Venture Builders | oti-3 3rd floor el meDetails
oti-3 3rd floor el me | $115,000 |
| Jul 1, 2005 | Never finaled issued Jul 2005, no final | 433 California St | Wcp Svcs, Dba: Venture Builders | oti-3 4th flfoor el, meDetails
oti-3 4th flfoor el, me | $89,000 |
| Jun 29, 2005 | Completed final sign-off Aug 2005 | 433 California St | Dpw Inc. | modify (e) sprinkler system on 3/f,4/f only.relocate 31 heads,add 1 new & plug off 3 headsDetails
modify (e) sprinkler system on 3/f,4/f only.relocate 31 heads,add 1 new & plug off 3 heads | $6,500 |
| Jun 23, 2005 | Never finaled issued Jul 2005, no final | 433 California St | C B F Inc | life safety system modifications @ 433 california st 4/f power supply strobe light horn strobesDetails
life safety system modifications @ 433 california st 4/f power supply strobe light horn strobes | $17,000 |
| Jun 23, 2005 | Completed final sign-off Aug 2005 | 433 California St | C B F Inc | life safety system modifcations @ 433 california street 3/f strobes horn strobes and smoke detectorsDetails
life safety system modifcations @ 433 california street 3/f strobes horn strobes and smoke detectors | $18,000 |
| Jun 8, 2005 | Completed final sign-off Nov 2005 | 433 California St | Webcor Construction Lp | 200404232090,200404232086, 200312242957Details
200404232090,200404232086, 200312242957 | |
| Jun 8, 2005 | Completed final sign-off Nov 2005 | 433 California St | Webcor Construction Lp | renew 200404191626, 200404232084Details
renew 200404191626, 200404232084 | |
| May 10, 2005 | Never finaled issued May 2005, no final | 433 California St | sidewalk repairDetails
sidewalk repair | ||
| Apr 21, 2005 | Completed final sign-off Aug 2005 | 433 California St | oti-1, 3rd floor, el, me, ls, sp.Details
oti-1, 3rd floor, el, me, ls, sp. | $77,208 | |
| Apr 21, 2005 | Expired or cancelled expired Jan 2008 | 433 California St | Wcp Svcs, Dba: Venture Builders | oti-1 4th floor el, me, l/s, spDetails
oti-1 4th floor el, me, l/s, sp | $51,474 |
| Apr 20, 2005 | Expired or cancelled cancelled Jun 2006 | 433 California St | Webcor Construction Lp | barrier removal. install new equip facilitation primary entrance.Details
barrier removal. install new equip facilitation primary entrance. | $43,000 |
| Dec 15, 2004 | Completed final sign-off Feb 2005 | 433 California St | C B F Inc | life safety system modifications. wire existing smoke detectors w/new base to shutdown new fire smokDetails
life safety system modifications. wire existing smoke detectors w/new base to shutdown new fire smok | $5,000 |
| Dec 3, 2004 | Completed final sign-off Feb 2005 | 433 California St | Dpw Inc. | relocate 2 existing sprinkler heads at room 928 onlyDetails
relocate 2 existing sprinkler heads at room 928 only | $2,500 |
| Nov 10, 2004 | Completed final sign-off Feb 2005 | 433 California St | Cannon Constructors North Inc | install a/c unit, fire smoke dampers -no increase in office spaceDetails
install a/c unit, fire smoke dampers -no increase in office space | $24,900 |
| Jul 19, 2004 | Completed final sign-off Aug 2004 | 433 California St | revision to barbier removal to pa3200405254780.Details
revision to barbier removal to pa3200405254780. | $1,000 | |
| Jun 30, 2004 | Completed final sign-off Nov 2005 | 433 California St | Webcor Construction Inc. | addition of ada (title 24) accessible door.Details
addition of ada (title 24) accessible door. | $12,000 |
| Jun 30, 2004 | Expired or cancelled expired Nov 2005 | 433 California St | Pribuss Engineering Inc | 1/f- fire sprinkler t.i.Details
1/f- fire sprinkler t.i. | $3,250 |
| May 25, 2004 | Completed final sign-off Aug 2004 | 433 California St | barrier removal/restroom remodel/fire alarsm on sep application/emergency llighting on sep applicatnDetails
barrier removal/restroom remodel/fire alarsm on sep application/emergency llighting on sep applicatn | $20,000 | |
| Apr 23, 2004 | Expired or cancelled expired Nov 2005 | 433 California St | Webcor Construction Inc. | fire proofing of (e) bldng.Details
fire proofing of (e) bldng. | $8,000 |
| Apr 23, 2004 | Expired or cancelled expired Nov 2005 | 433 California St | Webcor Construction Inc. | oti-2 1st fl spDetails
oti-2 1st fl sp | $36,000 |
| Apr 23, 2004 | Expired or cancelled expired Nov 2005 | 433 California St | Webcor Construction Inc. | oti-4 1st floor meDetails
oti-4 1st floor me | $30,000 |
| Apr 19, 2004 | Expired or cancelled expired Nov 2005 | 433 California St | C B F Inc | life safety system modifications @ 433 california 1st floor borel bankDetails
life safety system modifications @ 433 california 1st floor borel bank | $5,000 |
| Feb 23, 2004 | Completed final sign-off Apr 2004 | 433 California St | demolition of partitions, millwork, etc. in 2 ssuites at g/f, interior non-structural demoDetails
demolition of partitions, millwork, etc. in 2 ssuites at g/f, interior non-structural demo | $45,000 | |
| Jan 23, 2004 | Never finaled issued Jan 2004, no final | 433 California St | barrier removal- restroom remodel- fire alarm on sep app emergency lighting on sep appDetails
barrier removal- restroom remodel- fire alarm on sep app emergency lighting on sep app | $20,000 | |
| Dec 24, 2003 | Expired or cancelled expired Nov 2005 | 433 California St | oti-1 ground floor, me, el, sp, leDetails
oti-1 ground floor, me, el, sp, le | $360,000 | |
| Dec 18, 2002 | Completed final sign-off Mar 2003 | 433 California St | minor demolition alteration/relocation of extg light fixtures/minor electrical finishesDetails
minor demolition alteration/relocation of extg light fixtures/minor electrical finishes | $72,000 | |
| Dec 12, 2001 | Expired or cancelled expired Feb 2004 | 441 California St | Macro Builder Inc | non-bearing walls, plumbing, electrical, finish work, hvac duct workDetails
non-bearing walls, plumbing, electrical, finish work, hvac duct work | $78,000 |
| Nov 16, 2001 | Completed final sign-off Jun 2002 | 50 Leidesdorff St | adding a juice barDetails
adding a juice bar | $20,000 | |
| Nov 9, 2001 | Completed final sign-off Jan 2002 | 433 California St | C B F Inc | relocate exist 3 strobes light & horn strobe at 5th floor location.Details
relocate exist 3 strobes light & horn strobe at 5th floor location. | $400 |
| Oct 11, 2001 | Completed final sign-off Jan 2002 | 433 California St | Sure Fire Protection | oti-2, 5th floor, spr onlyDetails
oti-2, 5th floor, spr only | $2,000 |
| Oct 10, 2001 | Expired or cancelled expired Nov 2002 | 433 California St | 2 fl- fire/life safety sys. (e) tenant remodeling 1/2 of their suite, add 5 nac devices & 8" devicesDetails
2 fl- fire/life safety sys. (e) tenant remodeling 1/2 of their suite, add 5 nac devices & 8" devices | $5,000 | |
| Sep 21, 2001 | Completed final sign-off Jan 2002 | 433 California St | oti-1 5th floor eelctrical mechanical, lifesafty, sprinklerDetails
oti-1 5th floor eelctrical mechanical, lifesafty, sprinkler | $62,000 | |
| Jul 3, 2001 | Expired or cancelled expired Nov 2002 | 433 California St | oti-1 2nd floor el me ls spDetails
oti-1 2nd floor el me ls sp | $85,000 | |
| Jul 3, 2001 | Expired or cancelled expired Nov 2002 | 433 California St | oti-2 2nd floor el me spDetails
oti-2 2nd floor el me sp | $102,000 | |
| Feb 12, 2001 | Expired or cancelled expired Jun 2001 | 433 California St | fire and life safety sytem upgrade to the 2nd floorDetails
fire and life safety sytem upgrade to the 2nd floor | $5,000 | |
| Jan 5, 2001 | Expired or cancelled expired May 2001 | 433 California St | Skyline Construction | sprinkler work to be performed, no increase in space-2nd floorDetails
sprinkler work to be performed, no increase in space-2nd floor | $5,000 |
| Dec 20, 2000 | Expired or cancelled expired Jul 2001 | 433 California St | oti-2 2nd fl mech, ltgDetails
oti-2 2nd fl mech, ltg | $10,000 | |
| Dec 12, 2000 | Expired or cancelled expired Jan 2002 | 433 California St | oti-1 2nd floor el me l/s spDetails
oti-1 2nd floor el me l/s sp | $35,000 | |
| Jul 14, 2000 | Completed final sign-off Dec 2000 | 433 California St | Pribuss Engineering Inc | fire sprinkler t-1 /best offer 433 calif 9flr jc1519Details
fire sprinkler t-1 /best offer 433 calif 9flr jc1519 | $8,000 |
| Jun 19, 2000 | Completed final sign-off Dec 2000 | 433 California St | oti-3 9th floor lsDetails
oti-3 9th floor ls | $7,500 | |
| May 31, 2000 | Completed final sign-off Dec 2000 | 433 California St | oti-2, el, me, 9th floorDetails
oti-2, el, me, 9th floor | $200,000 | |
| May 24, 2000 | Completed final sign-off Dec 2000 | 433 California St | oti-1 el me ls sp 9th floorDetails
oti-1 el me ls sp 9th floor | $150,000 | |
| Mar 8, 2000 | Expired or cancelled expired Sep 2000 | 433 California St | new glass wall at conference areaDetails
new glass wall at conference area | ||
| Jan 23, 2000 | Expired or cancelled expired Jul 2000 | 433 California St | fire sprinkler system 9th flr new mains and linesDetails
fire sprinkler system 9th flr new mains and lines | $13,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.