Block 4967, lot 040
6275 03rd St
- City’s use
- Multi-Family Residential
- Built
- 1964
- Stories
- 3
- Units
- 11
- Rooms
- 11 bathrooms
- Lot
- 5,192 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 4, 2024 | Completed final sign-off Dec 2025 | 6275 03rd St | Deleon Builders Inc | interior remodel of liquor store to sandwich shop. to comply with health violation #1700Details
interior remodel of liquor store to sandwich shop. to comply with health violation #1700 | $60,000 |
| Jun 12, 2024 | In progress issued Jun 2024 | 6275 03rd St | legalize addres 6275 3rd st at apn 4967/040 as a commercial address.Details
legalize addres 6275 3rd st at apn 4967/040 as a commercial address. | ||
| Jun 12, 2024 | In progress issued Jun 2024 | 6260 03rd St | disable unsed addresses 6260, 6281, 6285, 6287 03rd st at apb 4967/040 per abe program.Details
disable unsed addresses 6260, 6281, 6285, 6287 03rd st at apb 4967/040 per abe program. | ||
| Mar 5, 2024 | In progress filed Mar 2024, not yet issued | 6283 03rd St | 1st floor: accessible building entrance and sidewalk upgrade. abe #201812183114 ordinance 51-16; new accessibel door to extg ground floor commercial space, new window to extg ground fl. commiercial. provide new raised paving in front of te extg ground fl commercial space.Details
1st floor: accessible building entrance and sidewalk upgrade. abe #201812183114 ordinance 51-16; new accessibel door to extg ground floor commercial space, new window to extg ground fl. commiercial. provide new raised paving in front of te extg ground fl commercial space. | $17,391 | |
| Feb 1, 2024 | Completed final sign-off Aug 2024 | 6279 03rd St | International Fire Inc | upgrade existing fire alarm system in non sprinkled building to comply with 2022 cbc/cfc, nfpa 72 and sffc sec. 1103.7.6.1. replace existing facu with new and a radio to monitor system. smokes in the common areas and pulls at each level and exit.Details
upgrade existing fire alarm system in non sprinkled building to comply with 2022 cbc/cfc, nfpa 72 and sffc sec. 1103.7.6.1. replace existing facu with new and a radio to monitor system. smokes in the common areas and pulls at each level and exit. | $18,800 |
| Dec 14, 2022 | Completed final sign-off Dec 2022 | 6279 03rd St | Guacamaya Painting Inc | replace dry-rot siding on front of building roughly 90%Details
replace dry-rot siding on front of building roughly 90% | $8,000 |
| Sep 29, 2022 | Never finaled issued Sep 2022, no final | 6279 03rd St | Bayview Construction Engineers | to obtain a final inspection for work under pa# 2017-0719-2338. all work is complete.Details
to obtain a final inspection for work under pa# 2017-0719-2338. all work is complete. | |
| Sep 26, 2019 | Expired or cancelled cancelled Jan 2026 | 6279 03rd St | comply with soft story retrofit per sfbc ch 34b fema p807. commerical portion. comply with ada requirements abe program ref 201707192338 (residential). also clarify building occupancy is mixed use which contains apartments and storesDetails
comply with soft story retrofit per sfbc ch 34b fema p807. commerical portion. comply with ada requirements abe program ref 201707192338 (residential). also clarify building occupancy is mixed use which contains apartments and stores | $9,000 | |
| Jul 19, 2017 | Never finaled issued Dec 2017, no final | 6279 03rd St | soft story retrofit per sfebc chapter 4d engineering per fema p-807Details
soft story retrofit per sfebc chapter 4d engineering per fema p-807 | $50,000 | |
| Mar 10, 2017 | Expired or cancelled cancelled Nov 2019 | 6279 03rd St | comply with soft story retrofit per sfbc chapter 34b fema p-807Details
comply with soft story retrofit per sfbc chapter 34b fema p-807 | $50,000 | |
| Sep 26, 2016 | Completed final sign-off Oct 2016 | 6279 03rd St | Tri-Signal Integration Inc. | replace faraday 15001 fire alarm panel with new firelite ms-2 fire alarm panel. all (e) fa devices are to remain intactDetails
replace faraday 15001 fire alarm panel with new firelite ms-2 fire alarm panel. all (e) fa devices are to remain intact | $4,000 |
| Feb 16, 2012 | Completed final sign-off Feb 2012 | 6279 03rd St | reroofingDetails
reroofing | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bayview Construction Engineers, Deleon Builders Inc, Guacamaya Painting Inc, International Fire Inc, Tri-Signal Integration Inc.
- Architects
- Elias Hoat, Humza Shahid Chowdhry
- Engineers
- Humza Shahid Chowdhry, Peter Bekey
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.