Block 0653, lot 021
2028 Fillmore St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,750 sq ft
- Lot
- 2,495 sq ft
- Zoning
- FILLMR
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 2028 Fillmore St | interior renovation of partitions for new changing rooms, breakroom,and hallway. new exterior shed.Details
interior renovation of partitions for new changing rooms, breakroom,and hallway. new exterior shed. | $20,000 | |
| Dec 19, 2024 | In progress filed Dec 2024, not yet issued | 2028 Fillmore St | tenant improvement of e shop to add 1 dressing room, no plumbing, mechanical, structural for facade work.Details
tenant improvement of e shop to add 1 dressing room, no plumbing, mechanical, structural for facade work. | $20,000 | |
| Jul 26, 2022 | Completed final sign-off Feb 2023 | 2028 Fillmore St | Winfield Building Group Dba C.W. Dillion | minor interior retail renovation. no change to exterior, fire safety, plumbing or mechanical. millwork and non structural partitions to be removed. new partitions, millwork and lighting to be added.Details
minor interior retail renovation. no change to exterior, fire safety, plumbing or mechanical. millwork and non structural partitions to be removed. new partitions, millwork and lighting to be added. | $70,000 |
| Aug 27, 2010 | Completed final sign-off Oct 2010 | 2028 Fillmore St | Everbuilt Construction, Inc. | tenant improvment to retail space. work inlcludes partition walls, new floor and wall finishes, new lighting, cabinetryDetails
tenant improvment to retail space. work inlcludes partition walls, new floor and wall finishes, new lighting, cabinetry | $80,000 |
| Aug 17, 2010 | Never finaled issued Aug 2010, no final | 2030 Fillmore St | street space and mta parkingDetails
street space and mta parking | ||
| Jun 18, 2010 | Never finaled issued Jun 2010, no final | 2030 Fillmore St | street space and mtaDetails
street space and mta | ||
| Apr 14, 2010 | Completed final sign-off Jul 2010 | 2028 Fillmore St | Everbuilt Construction, Inc. | voluntary structural upgrade. revision to 201003188508. installation of moment resisting steel frameDetails
voluntary structural upgrade. revision to 201003188508. installation of moment resisting steel frame | $12,500 |
| Mar 18, 2010 | Completed final sign-off Mar 2011 | 2030 Fillmore St | Everbuilt Construction, Inc. | remodel of (e) kitchen, bathrms., laundry & family rm. replace furnace, insulate wall where accessible & entire attic.Details
remodel of (e) kitchen, bathrms., laundry & family rm. replace furnace, insulate wall where accessible & entire attic. | $80,000 |
| Mar 18, 2010 | Completed final sign-off Jul 2010 | 2028 Fillmore St | Everbuilt Construction, Inc. | (n) ada unisex toilet rm., misc. structural repairs, inssulate where accessible, patch drywall as required, install (n) entry door & door to rear yard. provide (n) electrical service, install (n) furnace & ductwork.Details
(n) ada unisex toilet rm., misc. structural repairs, inssulate where accessible, patch drywall as required, install (n) entry door & door to rear yard. provide (n) electrical service, install (n) furnace & ductwork. | $75,000 |
| Feb 3, 2010 | Completed final sign-off Apr 2010 | 2028 Fillmore St | Everbuilt Construction, Inc. | interior demolition per ab-17 of non structural interior walls and floor coverings at ground floor level. patch and paint as required.all work in retain space 2028 fillmore.Details
interior demolition per ab-17 of non structural interior walls and floor coverings at ground floor level. patch and paint as required.all work in retain space 2028 fillmore. | $3,000 |
| Dec 14, 2004 | Expired or cancelled cancelled May 2008 | 2028 Fillmore St | relocating (e) store on filmore to new space down the street at 2028 filmore st.Details
relocating (e) store on filmore to new space down the street at 2028 filmore st. | $100,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Everbuilt Construction, Inc. (5), Winfield Building Group Dba C.W. Dillion
- Architects
- Elias Horat, Monighan Monighan, Paul Rotter
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.