Block 3595, lot 048
3440 20th St
- City’s use
- Multi-Family Residential
- Built
- 1965
- Stories
- 3
- Units
- 48
- Rooms
- 48 bathrooms
- Building
- 31,086 sq ft
- Lot
- 12,512 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
56 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2025 | Completed final sign-off Aug 2026 | 3440 20th St | B-Side Inc. | common area: structural wall repair. structural construction includes new studs, plywood and mudsill. nov# 202544910Details
common area: structural wall repair. structural construction includes new studs, plywood and mudsill. nov# 202544910 | $5,000 |
| Aug 6, 2025 | Completed final sign-off Oct 2025 | 3440 20th St | Redlog Flooring Services Corp | unit 311 and 314 balcony repairs - sister severely deteriorated framing. repair minor deterioration with woodepox or approved equivalent. replace full stucco soffit vents.Details
unit 311 and 314 balcony repairs - sister severely deteriorated framing. repair minor deterioration with woodepox or approved equivalent. replace full stucco soffit vents. | $25,000 |
| Aug 17, 2022 | Completed final sign-off Oct 2022 | 3440 20th St | Brighter Bay Builders Inc | unit 202. install 1 new clothes washer and dryer. no wall demo.Details
unit 202. install 1 new clothes washer and dryer. no wall demo. | $4,500 |
| Jun 28, 2022 | Completed final sign-off Sep 2022 | 3440 20th St | unit# 107 - install one (n) clothes washer & dryer.Details
unit# 107 - install one (n) clothes washer & dryer. | $4,000 | |
| Jun 28, 2022 | Completed final sign-off Sep 2022 | 3440 20th St | Brighter Bay Builders Inc | unit# 106 - install one (n) clothes washer & dryer.Details
unit# 106 - install one (n) clothes washer & dryer. | $4,000 |
| Jun 15, 2022 | Completed final sign-off Jan 2023 | 3440 20th St | Au Electric Corporation/Aec Alarms | fire as-built for pa# 201908027686. install additional fire devices as needed on ground level. new 9 adu units by installing new lf sounders in all sleeping areas & pull station, smoke, horn/ strobe in common area. ref adu pa# 202002184665.Details
fire as-built for pa# 201908027686. install additional fire devices as needed on ground level. new 9 adu units by installing new lf sounders in all sleeping areas & pull station, smoke, horn/ strobe in common area. ref adu pa# 202002184665. | $10,000 |
| Jun 24, 2021 | Never finaled issued Jun 2021, no final | 3440 20th St | O'connor Plumbing & Fire Protection | provide fire sprinkler system on ground floor and new underground per nfpa 24. ref app#202002184665Details
provide fire sprinkler system on ground floor and new underground per nfpa 24. ref app#202002184665 | $50,000 |
| Apr 8, 2021 | Completed final sign-off May 2021 | 3440 20th St | B-Side Inc. | #111. rehab bathroom, rehab kitchen, replace washer/dryer.Details
#111. rehab bathroom, rehab kitchen, replace washer/dryer. | $25,000 |
| Sep 16, 2020 | Never finaled issued Sep 2020, no final | 3440 20th St | Doherty Restoration, Inc. | remove ~100 sf of existing dry rotted wood siding. replace in kind. not visible from street.Details
remove ~100 sf of existing dry rotted wood siding. replace in kind. not visible from street. | $6,500 |
| Jun 18, 2020 | Expired or cancelled withdrawn Feb 2021 | 3440 20th St | unit 212: convert (e) kitchen to nook, relocate kitchen, rehabilitate (e) bathroom, install washer/dryerDetails
unit 212: convert (e) kitchen to nook, relocate kitchen, rehabilitate (e) bathroom, install washer/dryer | $40,000 | |
| Feb 18, 2020 | Completed final sign-off Jan 2023 | 3440 20th St | Doherty Restoration, Inc. | convert garage spaces into (9) new adu's per ordinance no. 162-16 for a building total of (48) units.Details
convert garage spaces into (9) new adu's per ordinance no. 162-16 for a building total of (48) units. | $200,000 |
| Nov 13, 2019 | Never finaled issued Nov 2019, no final | 3440 20th St | street space only | ||
| Oct 8, 2019 | Never finaled issued Oct 2019, no final | 3440 20th St | Axel8 Construction | unit #105: kitchen (64sq ft), and bathroom (49sq ft) rehab. install washer and dryer(ventless)Details
unit #105: kitchen (64sq ft), and bathroom (49sq ft) rehab. install washer and dryer(ventless) | $20,000 |
| Aug 2, 2019 | Completed final sign-off Aug 2020 | 3440 20th St | Au Electric Corporation/Aec Alarms | upgrade existing fire alarm to comply with sffc 103.7.6.1 and nfpa 72Details
upgrade existing fire alarm to comply with sffc 103.7.6.1 and nfpa 72 | $40,000 |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 3440 20th St | streetspace | ||
| Dec 21, 2017 | Never finaled issued Dec 2017, no final | 3440 20th St | street space | ||
| Nov 8, 2017 | Never finaled issued Nov 2017, no final | 3440 20th St | street space | ||
| Nov 3, 2017 | Completed final sign-off Mar 2018 | 3440 20th St | Casman Construction Inc | unit #101: rehabilitate e bathroom, existing kitchen, install washer dryerDetails
unit #101: rehabilitate e bathroom, existing kitchen, install washer dryer | $25,000 |
| Oct 19, 2017 | Never finaled issued Oct 2017, no final | 3440 20th St | street space permit | ||
| Sep 28, 2017 | Completed final sign-off May 2018 | 3440 20th St | Rain Defense | to comply with nov 201704961 stucco/exterior finish will be like kind to match. revision to pa 2017-0808-4260 structural repairs discovered after removing dryrot. dryrot was discovered during work done on pa 2017-0522-7311Details
to comply with nov 201704961 stucco/exterior finish will be like kind to match. revision to pa 2017-0808-4260 structural repairs discovered after removing dryrot. dryrot was discovered during work done on pa 2017-0522-7311 | $24,999 |
| Aug 8, 2017 | Completed final sign-off Feb 2018 | 3440 20th St | Rain Defense | modification of pa # 201705227311. replace termite damage and dryrot on the botton balcony above the garage door. inkind repair of approx 20 sf of siding due to dry rot. less than 50%. in kind street facing.Details
modification of pa # 201705227311. replace termite damage and dryrot on the botton balcony above the garage door. inkind repair of approx 20 sf of siding due to dry rot. less than 50%. in kind street facing. | |
| Jul 28, 2017 | Never finaled issued Jul 2017, no final | 3440 20th St | street space | ||
| May 22, 2017 | Completed final sign-off Feb 2018 | 3440 20th St | Rain Defense | replace 24 aluminum-framed windows and sliding doors in-kind and repair stucco to match around new window and door installations.Details
replace 24 aluminum-framed windows and sliding doors in-kind and repair stucco to match around new window and door installations. | $280,000 |
| Dec 1, 2016 | Completed final sign-off Aug 2017 | 3440 20th St | Nava Pro Construction | unit #309, 2nd flr: remodel (e) bathroom, kitchen and add washer & dryerDetails
unit #309, 2nd flr: remodel (e) bathroom, kitchen and add washer & dryer | $25,000 |
| Sep 22, 2016 | Completed final sign-off Mar 2017 | 3440 20th St | Nava Pro Construction | 2/f #114- remodel existing bathroom, remodel existing kitchen, add washer & dryer.Details
2/f #114- remodel existing bathroom, remodel existing kitchen, add washer & dryer. | $25,000 |
| Jun 8, 2016 | Never finaled issued Jun 2016, no final | 3440 20th St | B-Side Inc. | apt 109: kitchen remodel : new cabs, countertop replacement. bathroom rneovation: new fixtures and lighting. tub replacement.Details
apt 109: kitchen remodel : new cabs, countertop replacement. bathroom rneovation: new fixtures and lighting. tub replacement. | $20,000 |
| Jun 8, 2016 | Never finaled issued Jun 2016, no final | 3440 20th St | B-Side Inc. | apt 209: kitchen remodel. new cabs, countertop, bathroom renovation: new fixtures and lighting, use (e) tub.Details
apt 209: kitchen remodel. new cabs, countertop, bathroom renovation: new fixtures and lighting, use (e) tub. | $20,000 |
| Mar 10, 2016 | Completed final sign-off Jun 2016 | 3440 20th St | Palmera Construction Co | unit #112 at 2nd floor. remodel extg bathroom, remodel extg kitchen. add washer and dryer. exhaust from range not visible from the street.Details
unit #112 at 2nd floor. remodel extg bathroom, remodel extg kitchen. add washer and dryer. exhaust from range not visible from the street. | $25,000 |
| Mar 10, 2015 | Completed final sign-off Oct 2015 | 3440 20th St | K G Builder | unit 301: remodel kitchen and washer and dryer, remodel bathroomDetails
unit 301: remodel kitchen and washer and dryer, remodel bathroom | $30,000 |
| Feb 13, 2015 | Expired or cancelled withdrawn Mar 2015 | 3440 20th St | convert 2 bedroom apartment into a studio & one bedroom apartment, add kitchen, bath and 2 w/d, remodel kitchen & bath, turn unit #301 into 301 and 301b.Details
convert 2 bedroom apartment into a studio & one bedroom apartment, add kitchen, bath and 2 w/d, remodel kitchen & bath, turn unit #301 into 301 and 301b. | $30,000 | |
| Oct 16, 2014 | Completed final sign-off Dec 2014 | 3440 20th St | Precision Design & Drafting Inc | remove all towerstream antennas & associated equipment to abate ces nov #201388452 & planning department complaint #12353.Details
remove all towerstream antennas & associated equipment to abate ces nov #201388452 & planning department complaint #12353. | $500 |
| May 6, 2014 | Completed final sign-off May 2014 | 3440 20th St | Sincere Construction Company Inc | administrative permit to document that original permit from 1962 bpa 298797 and seismic strengthening bpa 201203287017 complies with 2014 sfbc a4 - no work.Details
administrative permit to document that original permit from 1962 bpa 298797 and seismic strengthening bpa 201203287017 complies with 2014 sfbc a4 - no work. | |
| Oct 24, 2013 | Completed final sign-off Dec 2014 | 3440 20th St | Sincere Construction Company Inc | repair dry rot @ exterior on 2nd, 3rd & 4th (top) floor on north and south elevation, two locations, replacement in-kind.Details
repair dry rot @ exterior on 2nd, 3rd & 4th (top) floor on north and south elevation, two locations, replacement in-kind. | $15,000 |
| Oct 3, 2013 | Completed final sign-off Dec 2013 | 3440 20th St | Wen Bin Li Construction Co | apt#306 - remodel kitchean and bathroom ; replace cabinet light fixture, hood range, sink/faucet. closet door; replace bath tub, vanity sink, blinds, carpet, heater if broken, bath room fan if needed, toilet , tile floor; to compley cec 150(k) 8 & 10.Details
apt#306 - remodel kitchean and bathroom ; replace cabinet light fixture, hood range, sink/faucet. closet door; replace bath tub, vanity sink, blinds, carpet, heater if broken, bath room fan if needed, toilet , tile floor; to compley cec 150(k) 8 & 10. | $23,000 |
| Aug 14, 2013 | Completed final sign-off Sep 2013 | 3440 20th St | Wen Bin Li Construction Co | apt #106: remodel kitchen, paint, replace cabinet,light fixture and sink/faucet, closet door, blindsDetails
apt #106: remodel kitchen, paint, replace cabinet,light fixture and sink/faucet, closet door, blinds | $18,000 |
| Jul 10, 2013 | Expired or cancelled cancelled Jan 2026 | 3440 20th St | Sincere Construction Company Inc | revision to pa #2012.03.28.7017 - at request of bldg inspector, file as-built drawing shown field.Details
revision to pa #2012.03.28.7017 - at request of bldg inspector, file as-built drawing shown field. | |
| Oct 9, 2012 | Completed final sign-off Nov 2012 | 3440 20th St | M H M Construction | unit #202:renovate kitchen and bathroom. install new kitchen cabinets, new bathroom tub, toilet. update electrical. no structural work.Details
unit #202:renovate kitchen and bathroom. install new kitchen cabinets, new bathroom tub, toilet. update electrical. no structural work. | $18,000 |
| Mar 28, 2012 | Completed final sign-off May 2014 | 3440 20th St | Sincere Construction Company Inc | voluntary partial structural strengthening at ground floor.Details
voluntary partial structural strengthening at ground floor. | $100,000 |
| Apr 27, 2011 | Completed final sign-off Jun 2011 | 3440 20th St | Eagle Ridge Construction And Roofing | #311 - remodel 1 kitchen & paint, upgrade electrical, lighting to comply to cec 150 (k). no window, wall, door or ceiling work on this permit.Details
#311 - remodel 1 kitchen & paint, upgrade electrical, lighting to comply to cec 150 (k). no window, wall, door or ceiling work on this permit. | $14,000 |
| Jan 21, 2011 | Completed final sign-off Feb 2011 | 3440 20th St | Eagle Ridge Construction And Roofing | unit #111 to comply w/his nov 200924724 - replace all kitchen cabinets, new flooring, paint, angle stops & sinks, relocate circuit box, add gfi's upgrade wiring, add dishwasher, atleast 50% high efficacy lighting (by wattage), no change to exhaust system.Details
unit #111 to comply w/his nov 200924724 - replace all kitchen cabinets, new flooring, paint, angle stops & sinks, relocate circuit box, add gfi's upgrade wiring, add dishwasher, atleast 50% high efficacy lighting (by wattage), no change to exhaust system. | $5,000 |
| Aug 31, 2010 | Completed final sign-off Dec 2010 | 3440 20th St | Eagle Ridge Construction And Roofing | remodel kitchen and bathroom like for like plumbing & electrical, new cabinets & countertop new bath vanity, reglaze tub. units 107, 209, 308Details
remodel kitchen and bathroom like for like plumbing & electrical, new cabinets & countertop new bath vanity, reglaze tub. units 107, 209, 308 | $60,000 |
| Jul 14, 2008 | Completed final sign-off Sep 2008 | 3440 20th St | On-Site Maintenance | unit 105:kitchen and bath remodel, no structural cabinets, counter tile in kind, florescent lights onlyDetails
unit 105:kitchen and bath remodel, no structural cabinets, counter tile in kind, florescent lights only | $25,000 |
| Jun 23, 2008 | Completed final sign-off Aug 2008 | 3440 20th St | On-Site Maintenance | unit 108: kitchen + 1 bath remodel, no structural, cabinets, counter, tile, fluorescent lightDetails
unit 108: kitchen + 1 bath remodel, no structural, cabinets, counter, tile, fluorescent light | $25,025 |
| Jun 17, 2008 | Completed final sign-off Sep 2008 | 3440 20th St | On-Site Maintenance | work @ unit# 207 only. kitchen & bath remodel. no structural. cabinets, counter, tile, florescent light.Details
work @ unit# 207 only. kitchen & bath remodel. no structural. cabinets, counter, tile, florescent light. | $25,100 |
| Jan 4, 2008 | Completed final sign-off Jul 2008 | 3440 20th St | On-Site Maintenance | units #310 & #307: new kitchen & bath remodel, (n) cabinets, counters, tile & flourescent lights. no structural work.Details
units #310 & #307: new kitchen & bath remodel, (n) cabinets, counters, tile & flourescent lights. no structural work. | $40,000 |
| Dec 27, 2007 | Never finaled issued Dec 2007, no final | 3440 20th St | street space permit only. | ||
| Dec 26, 2007 | Completed final sign-off Aug 2008 | 3440 20th St | On-Site Maintenance | unit#201,#211. kitchen + bath remodel. no structural. cabinets, counters, tile, fluorescent light.Details
unit#201,#211. kitchen + bath remodel. no structural. cabinets, counters, tile, fluorescent light. | $40,000 |
| Nov 30, 2007 | Completed final sign-off Dec 2007 | 3440 20th St | On-Site Maintenance | revision to app#200710044517. change unit#206 to unit#203.Details
revision to app#200710044517. change unit#206 to unit#203. | |
| Oct 4, 2007 | Completed final sign-off Dec 2007 | 3440 20th St | On-Site Maintenance | unit#206.kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor exhaust termination 3' min from pl & bldg openings.Details
unit#206.kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor exhaust termination 3' min from pl & bldg openings. | $21,000 |
| Oct 4, 2007 | Completed final sign-off Dec 2007 | 3440 20th St | On-Site Maintenance | unit#212.kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor exhaust termination 3' min from pl & bldg openings.Details
unit#212.kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor exhaust termination 3' min from pl & bldg openings. | $21,000 |
| Sep 17, 2007 | Completed final sign-off Nov 2007 | 3440 20th St | On-Site Maintenance | unit #103- kitchen/bathroom remodel inkind.no structural changes. no window door or wall alteration. kitchen: at least 50% of lighting wattae must be flourscent.bath: fluorescent or motion controlled sensor.exhaust termination 3' min. from p.l. & bldg. opening.Details
unit #103- kitchen/bathroom remodel inkind.no structural changes. no window door or wall alteration. kitchen: at least 50% of lighting wattae must be flourscent.bath: fluorescent or motion controlled sensor.exhaust termination 3' min. from p.l. & bldg. opening. | $21,000 |
| Sep 6, 2007 | Completed final sign-off Dec 2007 | 3440 20th St | On-Site Maintenance | #206- kitchen/bathroom remodel in kind.no structural changes,no window door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. exhaust termination 3' min. from pl. & bldg. opening.Details
#206- kitchen/bathroom remodel in kind.no structural changes,no window door or wall alterations. kitchen: at least 50% of lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. exhaust termination 3' min. from pl. & bldg. opening. | $22,000 |
| Aug 22, 2007 | Completed final sign-off Nov 2007 | 3440 20th St | On-Site Maintenance | unit#109. kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen: at least 50% lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. exhaust termination 3' min from pl. & bldg openings.Details
unit#109. kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen: at least 50% lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. exhaust termination 3' min from pl. & bldg openings. | $20,000 |
| Aug 22, 2007 | Never finaled issued Aug 2007, no final | 3440 20th St | street space | ||
| Aug 22, 2007 | Completed final sign-off Dec 2007 | 3440 20th St | On-Site Maintenance | unit#304. kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen: at least 50% lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. exhaust termination 3' min from pl. & bldg openings.Details
unit#304. kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen: at least 50% lighting wattage must be fluorescent. bath: fluorescent or motion controlled sensor. exhaust termination 3' min from pl. & bldg openings. | $22,000 |
| Jul 13, 2007 | Completed final sign-off Dec 2007 | 3440 20th St | On-Site Maintenance | work @ unit# 114 only. kitchen / bathroom remodel in kind.no structural changes. no window, door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor. exhaust termination 3' minium from property line & bldg openings.Details
work @ unit# 114 only. kitchen / bathroom remodel in kind.no structural changes. no window, door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor. exhaust termination 3' minium from property line & bldg openings. | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- On-Site Maintenance (13), B-Side Inc. (4), Sincere Construction Company Inc (4), Eagle Ridge Construction And Roofing (3), Rain Defense (3), Au Electric Corporation/Aec Alarms (2), Brighter Bay Builders Inc (2), Doherty Restoration, Inc. (2), Nava Pro Construction (2), Wen Bin Li Construction Co (2), Axel8 Construction, Casman Construction Inc, K G Builder, M H M Construction, O'connor Plumbing & Fire Protection, Palmera Construction Co, Precision Design & Drafting Inc, Redlog Flooring Services Corp
- Architects
- Joe Kon, John Hood
- Engineers
- Joe Win Kon (2), Christopher Kahanek, Erik Mcgregor, Patrick Buscovich
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.