Wen Bin Li Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Jun 2024
- Last 24 months
- 0 permits filed
42 permits since 2000: 38 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2024 | Completed final sign-off Oct 2024 | 1216 Clay St | unit #102: one bathroom and one kitchen remodel (replace light, cabinet, plumbing fixtures, replace electric heats and mold est). to comply violation #202311101.Details
unit #102: one bathroom and one kitchen remodel (replace light, cabinet, plumbing fixtures, replace electric heats and mold est). to comply violation #202311101. | $40,000 |
| Jul 20, 2023 | Completed final sign-off Aug 2023 | 1050 Girard St | new fence in rear yardDetails
new fence in rear yard | $3,500 |
| Apr 25, 2023 | Completed final sign-off Aug 2024 | 622 40th Av | comply with nov 202304704 add 3-2x4 studs and double plates at 3rd fl. remove and replace sheet rock damaged by water (along main stair wall) remove nd replace exterior siding next to neighborrs light courtDetails
comply with nov 202304704 add 3-2x4 studs and double plates at 3rd fl. remove and replace sheet rock damaged by water (along main stair wall) remove nd replace exterior siding next to neighborrs light court | $20,000 |
| Oct 4, 2018 | Completed final sign-off Mar 2019 | 2102 Filbert St | unit 2: remodel kitchen and bathroom. replace (4) back side windows. patch and paint whole unit. no wall removal.Details
unit 2: remodel kitchen and bathroom. replace (4) back side windows. patch and paint whole unit. no wall removal. | $30,000 |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 795 Geary St | apt 306: remodel kitchen and bathroom. fix or replace bathroom windows. windows not visible from street. u-factor = .32 max. 5' x 8' bath, 12' x 7' kitchen. (2) total windowsDetails
apt 306: remodel kitchen and bathroom. fix or replace bathroom windows. windows not visible from street. u-factor = .32 max. 5' x 8' bath, 12' x 7' kitchen. (2) total windows | $37,000 |
| May 29, 2018 | Completed final sign-off Aug 2018 | 795 Geary St | unit #305: remodel kitchen and bathrooms. fi or replace in-kind bathroom windows. paint unit. windows not visible from street/ lighting per cec 150.0(k)Details
unit #305: remodel kitchen and bathrooms. fi or replace in-kind bathroom windows. paint unit. windows not visible from street/ lighting per cec 150.0(k) | $40,000 |
| Feb 22, 2018 | Completed final sign-off Jun 2018 | 2102 Filbert St | apt. #3: remodel bathroom and kitchen. replace (3) windows in back stairs. patch and paint apartment. replace stove. countertop. appliance. bathtub, etc. n/a maherDetails
apt. #3: remodel bathroom and kitchen. replace (3) windows in back stairs. patch and paint apartment. replace stove. countertop. appliance. bathtub, etc. n/a maher | $25,000 |
| Oct 20, 2017 | Never finaled issued Oct 2017, no final | 1446 Jackson St | for unit #5 on 3rd floor- replace baseboard heat with furnace system. n/a ordinance #155-13Details
for unit #5 on 3rd floor- replace baseboard heat with furnace system. n/a ordinance #155-13 | $5,000 |
| Jun 23, 2017 | Completed final sign-off May 2018 | 1446 Jackson St | non-struct. remodel in unit #5. relocate kitchen. remodel exist. bath. add new master bath. insulate ext. wall. replace all windows. ( not facing the street)Details
non-struct. remodel in unit #5. relocate kitchen. remodel exist. bath. add new master bath. insulate ext. wall. replace all windows. ( not facing the street) | $50,000 |
| Apr 4, 2017 | Completed final sign-off Jun 2017 | 1300 Golden Gate Av | unit #304 remodel kitchen & bathroom. paint whole unit, replace bathroom window, refinish hardwood floor.Details
unit #304 remodel kitchen & bathroom. paint whole unit, replace bathroom window, refinish hardwood floor. | $25,000 |
| Mar 10, 2017 | Completed final sign-off Jun 2017 | 830 Sutter St | unit #17: remodel kitchen and bathroom, in kind.Details
unit #17: remodel kitchen and bathroom, in kind. | $25,000 |
| Jan 5, 2017 | Completed final sign-off Sep 2017 | 539 11th Av | remodel (e) kitchen and powder room on 2nd flr. remodel (e) bathroom on 3rd flr. add 1 new bathroom on 3rd flr (top floor)Details
remodel (e) kitchen and powder room on 2nd flr. remodel (e) bathroom on 3rd flr. add 1 new bathroom on 3rd flr (top floor) | $15,000 |
| Oct 12, 2016 | Completed final sign-off Jan 2017 | 368 08th Av | remodel kitchen, replace cabinet, counter top, appliances, faucet, sink, outlets, lights.Details
remodel kitchen, replace cabinet, counter top, appliances, faucet, sink, outlets, lights. | $14,000 |
| Jun 13, 2016 | Completed final sign-off Dec 2016 | 1355 California St | #8 - remodel kitchen & bathroom, replace five windows not facing street, u-factor 0.32 max. n/a maher ordinanceDetails
#8 - remodel kitchen & bathroom, replace five windows not facing street, u-factor 0.32 max. n/a maher ordinance | $30,000 |
| May 16, 2016 | Completed final sign-off Jul 2016 | 730 Washington St | #206- bathroom and kitchen remodel, no walls removed or added.Details
#206- bathroom and kitchen remodel, no walls removed or added. | $23,000 |
| Apr 13, 2016 | Completed final sign-off Jun 2016 | 830 Sutter St | kitchen & bathroom remodel in apt#14Details
kitchen & bathroom remodel in apt#14 | $25,000 |
| Jan 15, 2016 | Completed final sign-off Apr 2016 | 729 Jones St | work in unit #310: remodel kitchen and bathroom. replace light fixtures, plumbing fixtures, replace floor/carpet.Details
work in unit #310: remodel kitchen and bathroom. replace light fixtures, plumbing fixtures, replace floor/carpet. | $20,000 |
| Dec 9, 2015 | Completed final sign-off Mar 2016 | 795 Geary St | work in unit #402: remodel kitchen and bathroom. no walls to be altered or removed.Details
work in unit #402: remodel kitchen and bathroom. no walls to be altered or removed. | $16,000 |
| Oct 1, 2015 | Completed final sign-off Jan 2016 | 1355 California St | unit #11: remodel kitchen and bathroom. reinstall light and plumbing fixtures. to comply with violation #201539853.Details
unit #11: remodel kitchen and bathroom. reinstall light and plumbing fixtures. to comply with violation #201539853. | $19,000 |
| Apr 14, 2015 | Never finaled issued Apr 2015, no final | 1246 Bush St | unit#8 revision to permit 201502128155. change ground floor storage room to habitable family room and den- sprinklers required on ground floor below unit stairs open up to- per nfpa13Details
unit#8 revision to permit 201502128155. change ground floor storage room to habitable family room and den- sprinklers required on ground floor below unit stairs open up to- per nfpa13 | |
| Feb 12, 2015 | Never finaled issued Mar 2015, no final | 1246 Bush St | relocate laundry room, (e) storage space to remain. add sprial stairs to connect with second floor unit. compliance with maher ordinance no 155-13 not required.Details
relocate laundry room, (e) storage space to remain. add sprial stairs to connect with second floor unit. compliance with maher ordinance no 155-13 not required. | $30,000 |
| Nov 3, 2014 | Completed final sign-off Dec 2014 | 805 Leavenworth St | to comply with complaint 201404701 item #2 & 3- infill gap at interior stairs to basement. n/a maher ordinanceDetails
to comply with complaint 201404701 item #2 & 3- infill gap at interior stairs to basement. n/a maher ordinance | $600 |
| Oct 23, 2014 | Completed final sign-off Dec 2014 | 729 Jones St | remodel kitchen area and bathroom fixtures only in unit 505. remove one non-structural wall adjacent to the kitchen.Details
remodel kitchen area and bathroom fixtures only in unit 505. remove one non-structural wall adjacent to the kitchen. | $18,000 |
| Oct 8, 2014 | Completed final sign-off Mar 2015 | 805 Leavenworth St | provide new ceiling for fire sprinkler addition in the laundry room.Details
provide new ceiling for fire sprinkler addition in the laundry room. | $5,000 |
| May 20, 2014 | Completed final sign-off Jul 2014 | 760 Geary St | unit #306. remodel kitchen and bathroom, replace vanity, bath tub, toilet, floor, replace cabinets, hood, move kitchen sink stove. patch and paint unit, replace light fixtures, no change on wall.Details
unit #306. remodel kitchen and bathroom, replace vanity, bath tub, toilet, floor, replace cabinets, hood, move kitchen sink stove. patch and paint unit, replace light fixtures, no change on wall. | $20,000 |
| Oct 3, 2013 | Completed final sign-off Dec 2013 | 3440 20th St | apt#306 - remodel kitchean and bathroom ; replace cabinet light fixture, hood range, sink/faucet. closet door; replace bath tub, vanity sink, blinds, carpet, heater if broken, bath room fan if needed, toilet , tile floor; to compley cec 150(k) 8 & 10.Details
apt#306 - remodel kitchean and bathroom ; replace cabinet light fixture, hood range, sink/faucet. closet door; replace bath tub, vanity sink, blinds, carpet, heater if broken, bath room fan if needed, toilet , tile floor; to compley cec 150(k) 8 & 10. | $23,000 |
| Aug 22, 2013 | Completed final sign-off Sep 2013 | 735 Washington St | to comply with ordinance 029-13 only. installation of grab bars in sro at the follwing locations: bathroom. 2 bathtub and 2 toilet on 2nd floor. 1 bathtub and 2 toilet on 3rd floor.Details
to comply with ordinance 029-13 only. installation of grab bars in sro at the follwing locations: bathroom. 2 bathtub and 2 toilet on 2nd floor. 1 bathtub and 2 toilet on 3rd floor. | $2,300 |
| Aug 14, 2013 | Completed final sign-off Sep 2013 | 3440 20th St | apt #106: remodel kitchen, paint, replace cabinet,light fixture and sink/faucet, closet door, blindsDetails
apt #106: remodel kitchen, paint, replace cabinet,light fixture and sink/faucet, closet door, blinds | $18,000 |
| Aug 13, 2013 | Completed final sign-off Oct 2013 | 730 Washington St | replace cabinets ,sink,stove, hood in kitchen, replace all light fixtures, replace tub/faucet, tiles, vanity, toilet, paint apt.in unit # 401Details
replace cabinets ,sink,stove, hood in kitchen, replace all light fixtures, replace tub/faucet, tiles, vanity, toilet, paint apt.in unit # 401 | $20,000 |
| Jul 24, 2013 | Completed final sign-off Aug 2013 | 527 Broadway | to comply with ordinance 029-13: installation of grab bars in sro at he fofllowing locations: 2 toilet room 2nd floor, 1 24 inch grab bar, 1-16 inch grab bar, 2 toilets 3rd floor, 1 shower each floorDetails
to comply with ordinance 029-13: installation of grab bars in sro at he fofllowing locations: 2 toilet room 2nd floor, 1 24 inch grab bar, 1-16 inch grab bar, 2 toilets 3rd floor, 1 shower each floor | $400 |
| Jul 8, 2013 | Completed final sign-off Jul 2013 | 730 Washington St | comply with nov# 200904384-apts #405 & 406-interior kitchen & bathroom remodel. no work to walls & openingsDetails
comply with nov# 200904384-apts #405 & 406-interior kitchen & bathroom remodel. no work to walls & openings | $20,000 |
| Jun 14, 2013 | Completed final sign-off Jun 2013 | 734 Grant Av | to obtain final inspection for work approved undera pp#200408161678. all work is complete.Details
to obtain final inspection for work approved undera pp#200408161678. all work is complete. | |
| Apr 23, 2013 | Completed final sign-off Jun 2013 | 734 Grant Av | obtain final sinepction for work approved under pa# 9407419. all work is completeDetails
obtain final sinepction for work approved under pa# 9407419. all work is complete | |
| Sep 20, 2012 | Completed final sign-off Jan 2013 | 1661 Sacramento St | interior remodel of unit. relocate kitchen convert existing kitchen to bedroom. remove fireplace. remodel bath. field verify egress to public way from rear yard.Details
interior remodel of unit. relocate kitchen convert existing kitchen to bedroom. remove fireplace. remodel bath. field verify egress to public way from rear yard. | $25,000 |
| Aug 2, 2012 | Completed final sign-off Aug 2012 | 16 Laguna St | retile porch area approx 10'x10' front building entry door area.Details
retile porch area approx 10'x10' front building entry door area. | $2,500 |
| Mar 26, 2012 | Completed final sign-off May 2012 | 775 Geary St | #305- revision to app# 201203196290. remove portion of non-bearing wall at closet to comply with his nov# 201146586 dated 6/22/2011Details
#305- revision to app# 201203196290. remove portion of non-bearing wall at closet to comply with his nov# 201146586 dated 6/22/2011 | $1,000 |
| Mar 19, 2012 | Completed final sign-off May 2012 | 775 Geary St | #305- remodel (e) kitchen and bath. remove non-bearing partition at kitchen. add partition in bedroom. to comply with complaint #201146586. all work on 3rd floorDetails
#305- remodel (e) kitchen and bath. remove non-bearing partition at kitchen. add partition in bedroom. to comply with complaint #201146586. all work on 3rd floor | $20,000 |
| Oct 13, 2011 | Expired or cancelled expired Mar 2013 | 775 Geary St | #402- remodel kitchen- replace cabinet, faucet, sink, stove, replace all light fixtures, switches, add sub panel. tile bathroom wall & floor, replace window, new toilet, vanity, paint whole apt. add partition with pocket door in living room. remove non bearing partition in ktichen.Details
#402- remodel kitchen- replace cabinet, faucet, sink, stove, replace all light fixtures, switches, add sub panel. tile bathroom wall & floor, replace window, new toilet, vanity, paint whole apt. add partition with pocket door in living room. remove non bearing partition in ktichen. | $22,000 |
| Mar 19, 2010 | Completed final sign-off Apr 2010 | 685 Mcallister St | repair stucco wall on ash street side (south) no window and no door work on this permit.Details
repair stucco wall on ash street side (south) no window and no door work on this permit. | $2,000 |
| Jan 11, 2010 | Completed final sign-off Jan 2010 | 36 Laskie St | take out wood utility ladder from west side of building. comply wit nov his 200928934Details
take out wood utility ladder from west side of building. comply wit nov his 200928934 | $1,000 |
| Jun 25, 2009 | Completed final sign-off Sep 2009 | 805 Leavenworth St | remodel kitchen, replace cabinets, counter, and sink. floor tile, new sheetrock at ktichen wall in units 408/409Details
remodel kitchen, replace cabinets, counter, and sink. floor tile, new sheetrock at ktichen wall in units 408/409 | $20,000 |
| Jun 1, 2009 | Completed final sign-off Sep 2009 | 805 Leavenworth St | unit 503 - replace kitchen cabinet, no wall removal. electrical upgrade. under seperate permit. replace old plumbing & install kitchen sink under seperate permit. min. 50% of kitchen light wattage shall be of high efficancy lights. nov 200885760 & 200885246/his.Details
unit 503 - replace kitchen cabinet, no wall removal. electrical upgrade. under seperate permit. replace old plumbing & install kitchen sink under seperate permit. min. 50% of kitchen light wattage shall be of high efficancy lights. nov 200885760 & 200885246/his. | $10,000 |