Wen Bin Li Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Jun 2024
- Last 24 months
- 0 permits filed
42 permits since 2000: 38 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 2 never finaled. Typically 6 days from filing to permit and 103 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2023 | Completed final sign-off Aug 2024 | 622 40th Av | comply with nov 202304704 add 3-2x4 studs and double plates at 3rd fl. remove and replace sheet rock damaged by water (along main stair wall) remove nd replace exterior siding next to neighborrs light courtDetails
comply with nov 202304704 add 3-2x4 studs and double plates at 3rd fl. remove and replace sheet rock damaged by water (along main stair wall) remove nd replace exterior siding next to neighborrs light court | $20,000 |
| Feb 22, 2018 | Completed final sign-off Jun 2018 | 2102 Filbert St | apt. #3: remodel bathroom and kitchen. replace (3) windows in back stairs. patch and paint apartment. replace stove. countertop. appliance. bathtub, etc. n/a maherDetails
apt. #3: remodel bathroom and kitchen. replace (3) windows in back stairs. patch and paint apartment. replace stove. countertop. appliance. bathtub, etc. n/a maher | $25,000 |
| Apr 14, 2015 | Never finaled issued Apr 2015, no final | 1246 Bush St | unit#8 revision to permit 201502128155. change ground floor storage room to habitable family room and den- sprinklers required on ground floor below unit stairs open up to- per nfpa13Details
unit#8 revision to permit 201502128155. change ground floor storage room to habitable family room and den- sprinklers required on ground floor below unit stairs open up to- per nfpa13 | |
| Feb 12, 2015 | Never finaled issued Mar 2015, no final | 1246 Bush St | relocate laundry room, (e) storage space to remain. add sprial stairs to connect with second floor unit. compliance with maher ordinance no 155-13 not required.Details
relocate laundry room, (e) storage space to remain. add sprial stairs to connect with second floor unit. compliance with maher ordinance no 155-13 not required. | $30,000 |
| Nov 3, 2014 | Completed final sign-off Dec 2014 | 805 Leavenworth St | to comply with complaint 201404701 item #2 & 3- infill gap at interior stairs to basement. n/a maher ordinanceDetails
to comply with complaint 201404701 item #2 & 3- infill gap at interior stairs to basement. n/a maher ordinance | $600 |