Back to bathroom remodel contractors
Wen Bin Li Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jun 2009 to Jun 2024
- Last 24 months
- 0 permits filed
42 permits since 2000: 38 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 22 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 87 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2024 | Completed final sign-off Oct 2024 | 1216 Clay St | unit #102: one bathroom and one kitchen remodel (replace light, cabinet, plumbing fixtures, replace electric heats and mold est). to comply violation #202311101.Details
unit #102: one bathroom and one kitchen remodel (replace light, cabinet, plumbing fixtures, replace electric heats and mold est). to comply violation #202311101. | $40,000 |
| Oct 4, 2018 | Completed final sign-off Mar 2019 | 2102 Filbert St | unit 2: remodel kitchen and bathroom. replace (4) back side windows. patch and paint whole unit. no wall removal.Details
unit 2: remodel kitchen and bathroom. replace (4) back side windows. patch and paint whole unit. no wall removal. | $30,000 |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 795 Geary St | apt 306: remodel kitchen and bathroom. fix or replace bathroom windows. windows not visible from street. u-factor = .32 max. 5' x 8' bath, 12' x 7' kitchen. (2) total windowsDetails
apt 306: remodel kitchen and bathroom. fix or replace bathroom windows. windows not visible from street. u-factor = .32 max. 5' x 8' bath, 12' x 7' kitchen. (2) total windows | $37,000 |
| May 29, 2018 | Completed final sign-off Aug 2018 | 795 Geary St | unit #305: remodel kitchen and bathrooms. fi or replace in-kind bathroom windows. paint unit. windows not visible from street/ lighting per cec 150.0(k)Details
unit #305: remodel kitchen and bathrooms. fi or replace in-kind bathroom windows. paint unit. windows not visible from street/ lighting per cec 150.0(k) | $40,000 |
| Feb 22, 2018 | Completed final sign-off Jun 2018 | 2102 Filbert St | apt. #3: remodel bathroom and kitchen. replace (3) windows in back stairs. patch and paint apartment. replace stove. countertop. appliance. bathtub, etc. n/a maherDetails
apt. #3: remodel bathroom and kitchen. replace (3) windows in back stairs. patch and paint apartment. replace stove. countertop. appliance. bathtub, etc. n/a maher | $25,000 |
| Jun 23, 2017 | Completed final sign-off May 2018 | 1446 Jackson St | non-struct. remodel in unit #5. relocate kitchen. remodel exist. bath. add new master bath. insulate ext. wall. replace all windows. ( not facing the street)Details
non-struct. remodel in unit #5. relocate kitchen. remodel exist. bath. add new master bath. insulate ext. wall. replace all windows. ( not facing the street) | $50,000 |
| Apr 4, 2017 | Completed final sign-off Jun 2017 | 1300 Golden Gate Av | unit #304 remodel kitchen & bathroom. paint whole unit, replace bathroom window, refinish hardwood floor.Details
unit #304 remodel kitchen & bathroom. paint whole unit, replace bathroom window, refinish hardwood floor. | $25,000 |
| Mar 10, 2017 | Completed final sign-off Jun 2017 | 830 Sutter St | unit #17: remodel kitchen and bathroom, in kind.Details
unit #17: remodel kitchen and bathroom, in kind. | $25,000 |
| Jan 5, 2017 | Completed final sign-off Sep 2017 | 539 11th Av | remodel (e) kitchen and powder room on 2nd flr. remodel (e) bathroom on 3rd flr. add 1 new bathroom on 3rd flr (top floor)Details
remodel (e) kitchen and powder room on 2nd flr. remodel (e) bathroom on 3rd flr. add 1 new bathroom on 3rd flr (top floor) | $15,000 |
| Jun 13, 2016 | Completed final sign-off Dec 2016 | 1355 California St | #8 - remodel kitchen & bathroom, replace five windows not facing street, u-factor 0.32 max. n/a maher ordinanceDetails
#8 - remodel kitchen & bathroom, replace five windows not facing street, u-factor 0.32 max. n/a maher ordinance | $30,000 |
| May 16, 2016 | Completed final sign-off Jul 2016 | 730 Washington St | #206- bathroom and kitchen remodel, no walls removed or added.Details
#206- bathroom and kitchen remodel, no walls removed or added. | $23,000 |
| Apr 13, 2016 | Completed final sign-off Jun 2016 | 830 Sutter St | kitchen & bathroom remodel in apt#14Details
kitchen & bathroom remodel in apt#14 | $25,000 |
| Jan 15, 2016 | Completed final sign-off Apr 2016 | 729 Jones St | work in unit #310: remodel kitchen and bathroom. replace light fixtures, plumbing fixtures, replace floor/carpet.Details
work in unit #310: remodel kitchen and bathroom. replace light fixtures, plumbing fixtures, replace floor/carpet. | $20,000 |
| Dec 9, 2015 | Completed final sign-off Mar 2016 | 795 Geary St | work in unit #402: remodel kitchen and bathroom. no walls to be altered or removed.Details
work in unit #402: remodel kitchen and bathroom. no walls to be altered or removed. | $16,000 |
| Oct 1, 2015 | Completed final sign-off Jan 2016 | 1355 California St | unit #11: remodel kitchen and bathroom. reinstall light and plumbing fixtures. to comply with violation #201539853.Details
unit #11: remodel kitchen and bathroom. reinstall light and plumbing fixtures. to comply with violation #201539853. | $19,000 |
| Oct 23, 2014 | Completed final sign-off Dec 2014 | 729 Jones St | remodel kitchen area and bathroom fixtures only in unit 505. remove one non-structural wall adjacent to the kitchen.Details
remodel kitchen area and bathroom fixtures only in unit 505. remove one non-structural wall adjacent to the kitchen. | $18,000 |
| May 20, 2014 | Completed final sign-off Jul 2014 | 760 Geary St | unit #306. remodel kitchen and bathroom, replace vanity, bath tub, toilet, floor, replace cabinets, hood, move kitchen sink stove. patch and paint unit, replace light fixtures, no change on wall.Details
unit #306. remodel kitchen and bathroom, replace vanity, bath tub, toilet, floor, replace cabinets, hood, move kitchen sink stove. patch and paint unit, replace light fixtures, no change on wall. | $20,000 |
| Oct 3, 2013 | Completed final sign-off Dec 2013 | 3440 20th St | apt#306 - remodel kitchean and bathroom ; replace cabinet light fixture, hood range, sink/faucet. closet door; replace bath tub, vanity sink, blinds, carpet, heater if broken, bath room fan if needed, toilet , tile floor; to compley cec 150(k) 8 & 10.Details
apt#306 - remodel kitchean and bathroom ; replace cabinet light fixture, hood range, sink/faucet. closet door; replace bath tub, vanity sink, blinds, carpet, heater if broken, bath room fan if needed, toilet , tile floor; to compley cec 150(k) 8 & 10. | $23,000 |
| Aug 22, 2013 | Completed final sign-off Sep 2013 | 735 Washington St | to comply with ordinance 029-13 only. installation of grab bars in sro at the follwing locations: bathroom. 2 bathtub and 2 toilet on 2nd floor. 1 bathtub and 2 toilet on 3rd floor.Details
to comply with ordinance 029-13 only. installation of grab bars in sro at the follwing locations: bathroom. 2 bathtub and 2 toilet on 2nd floor. 1 bathtub and 2 toilet on 3rd floor. | $2,300 |
| Jul 8, 2013 | Completed final sign-off Jul 2013 | 730 Washington St | comply with nov# 200904384-apts #405 & 406-interior kitchen & bathroom remodel. no work to walls & openingsDetails
comply with nov# 200904384-apts #405 & 406-interior kitchen & bathroom remodel. no work to walls & openings | $20,000 |
| Sep 20, 2012 | Completed final sign-off Jan 2013 | 1661 Sacramento St | interior remodel of unit. relocate kitchen convert existing kitchen to bedroom. remove fireplace. remodel bath. field verify egress to public way from rear yard.Details
interior remodel of unit. relocate kitchen convert existing kitchen to bedroom. remove fireplace. remodel bath. field verify egress to public way from rear yard. | $25,000 |
| Mar 19, 2012 | Completed final sign-off May 2012 | 775 Geary St | #305- remodel (e) kitchen and bath. remove non-bearing partition at kitchen. add partition in bedroom. to comply with complaint #201146586. all work on 3rd floorDetails
#305- remodel (e) kitchen and bath. remove non-bearing partition at kitchen. add partition in bedroom. to comply with complaint #201146586. all work on 3rd floor | $20,000 |
| Oct 13, 2011 | Expired or cancelled expired Mar 2013 | 775 Geary St | #402- remodel kitchen- replace cabinet, faucet, sink, stove, replace all light fixtures, switches, add sub panel. tile bathroom wall & floor, replace window, new toilet, vanity, paint whole apt. add partition with pocket door in living room. remove non bearing partition in ktichen.Details
#402- remodel kitchen- replace cabinet, faucet, sink, stove, replace all light fixtures, switches, add sub panel. tile bathroom wall & floor, replace window, new toilet, vanity, paint whole apt. add partition with pocket door in living room. remove non bearing partition in ktichen. | $22,000 |