Block 0299, lot 002
729 Jones St
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 5
- Units
- 79
- Rooms
- 79 bathrooms
- Building
- 47,150 sq ft
- Lot
- 12,201 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress issued Sep 2026 | 729 Jones St | Commercial Fire Protection Llc | revision to 202206035575 eevator checklist has been removed and elevator letter added to the plan. smoke detector in elevator machine room has been removed. six smoke in front of elevator removed. elevator recall relay in elevator machine room removedDetails
revision to 202206035575 eevator checklist has been removed and elevator letter added to the plan. smoke detector in elevator machine room has been removed. six smoke in front of elevator removed. elevator recall relay in elevator machine room removed | |
| Jun 3, 2022 | In progress issued Mar 2024 | 729 Jones St | Commercial Fire Protection Inc | install fire alarm horn, comply w/ sffd 1103.7.6.1 and nfpa 72-2022, upgrade the (e) fire alarm control panel to operate (n) low freq sounders. (e) fire alarm devices replaced: manual pulls, smoke dets, (e) bells w/horn strobes. add wireless comm and annunciator.Details
install fire alarm horn, comply w/ sffd 1103.7.6.1 and nfpa 72-2022, upgrade the (e) fire alarm control panel to operate (n) low freq sounders. (e) fire alarm devices replaced: manual pulls, smoke dets, (e) bells w/horn strobes. add wireless comm and annunciator. | $161,120 |
| Aug 9, 2021 | Never finaled issued Aug 2021, no final | 729 Jones St | Better Way Constructor Llc | unit 214: one kitchen remodel,remove old cabinets replace with new, new countertop, sink & fixtures & appliances, repaint unit, replacing flooring.Details
unit 214: one kitchen remodel,remove old cabinets replace with new, new countertop, sink & fixtures & appliances, repaint unit, replacing flooring. | $20,000 |
| May 26, 2020 | Completed final sign-off Jul 2020 | 729 Jones St | Better Way Constructor Llc | unit 414: replace cabinets, floors, drywall in common area. for work stated only. all work in-kind.Details
unit 414: replace cabinets, floors, drywall in common area. for work stated only. all work in-kind. | $30,000 |
| Dec 21, 2018 | Never finaled issued Dec 2018, no final | 729 Jones St | Mendez-Ortiz Contractors | apt 51: renovate 1 kitchen & 1 bathroom. maher n/a.Details
apt 51: renovate 1 kitchen & 1 bathroom. maher n/a. | $14,200 |
| Jun 9, 2017 | Completed final sign-off Sep 2017 | 729 Jones St | J T & M Hardwood Flooring Construcing | #206: interior remodel - relocate kitchen, remodel (e) bathroom. provide new home office. no structural work maher naDetails
#206: interior remodel - relocate kitchen, remodel (e) bathroom. provide new home office. no structural work maher na | $30,000 |
| Mar 16, 2017 | Completed final sign-off Jul 2017 | 729 Jones St | J T & M Hardwood Flooring Construcing | unit #117 interior remodel: relocate (e) kitchen, remodel (e) bath, provide new office. lighting per cec 150.0(k). no structural work maher naDetails
unit #117 interior remodel: relocate (e) kitchen, remodel (e) bath, provide new office. lighting per cec 150.0(k). no structural work maher na | $30,000 |
| Nov 1, 2016 | Completed final sign-off Feb 2017 | 729 Jones St | J T & M Hardwood Flooring Construcing | #311- non structural interior remodel, relocate e kitchen and bath, provide new officeDetails
#311- non structural interior remodel, relocate e kitchen and bath, provide new office | $30,000 |
| Jul 22, 2016 | Never finaled issued Sep 2016, no final | 729 Jones St | Magnum Construction Group Inc | #107- add (1) new head in closet, relocate (1) head at bath, replace existing pendent heads with new, total 18 heads. n/a ordinance #155-13 ref. to pa#201507201972. n/a maher ordinanceDetails
#107- add (1) new head in closet, relocate (1) head at bath, replace existing pendent heads with new, total 18 heads. n/a ordinance #155-13 ref. to pa#201507201972. n/a maher ordinance | $7,000 |
| Jan 15, 2016 | Completed final sign-off Apr 2016 | 729 Jones St | Wen Bin Li Construction Co | work in unit #310: remodel kitchen and bathroom. replace light fixtures, plumbing fixtures, replace floor/carpet.Details
work in unit #310: remodel kitchen and bathroom. replace light fixtures, plumbing fixtures, replace floor/carpet. | $20,000 |
| Oct 1, 2015 | Never finaled issued Oct 2015, no final | 729 Jones St | street spaceDetails
street space | ||
| Jul 20, 2015 | Completed final sign-off Sep 2016 | 729 Jones St | M H M Construction | apt #107- remodel/expand: convert storage to provide 2 (n) meida room & (n) office, (n) bath in basement. remodel (e) ktichen & bath on 1st floor.Details
apt #107- remodel/expand: convert storage to provide 2 (n) meida room & (n) office, (n) bath in basement. remodel (e) ktichen & bath on 1st floor. | $60,000 |
| Jun 29, 2015 | Completed final sign-off Sep 2016 | 729 Jones St | M H M Construction | unit #107. renovate kitchen & bathroom. all plumbing & electrical as needed. no walls to be moved, no structural work. all fire rated assemblies to be maintained. n/a for maherDetails
unit #107. renovate kitchen & bathroom. all plumbing & electrical as needed. no walls to be moved, no structural work. all fire rated assemblies to be maintained. n/a for maher | $25,000 |
| Oct 23, 2014 | Completed final sign-off Dec 2014 | 729 Jones St | Wen Bin Li Construction Co | remodel kitchen area and bathroom fixtures only in unit 505. remove one non-structural wall adjacent to the kitchen.Details
remodel kitchen area and bathroom fixtures only in unit 505. remove one non-structural wall adjacent to the kitchen. | $18,000 |
| Jul 16, 2014 | Never finaled issued Jul 2014, no final | 729 Jones St | M H M Construction | unit #415. renovate kitchen and bathroom (n) exh fan w/humidistat light. kitchen - pull old cabinet and provide new one. all (n) lights are flourescent. bathroom - remove tbu, toilet, sink. all plumbing and electrical as needed. 50% high efficacy. all fixtures locations and layout unchanged.Details
unit #415. renovate kitchen and bathroom (n) exh fan w/humidistat light. kitchen - pull old cabinet and provide new one. all (n) lights are flourescent. bathroom - remove tbu, toilet, sink. all plumbing and electrical as needed. 50% high efficacy. all fixtures locations and layout unchanged. | $18,000 |
| Dec 16, 2013 | Never finaled issued Dec 2013, no final | 729 Jones St | street space and mta parkingDetails
street space and mta parking | ||
| Aug 5, 2013 | Never finaled issued Aug 2013, no final | 729 Jones St | Jack Strong Plumbing & Building Services | work in unit 208: remove and replace kitchen cabinets & fixtures. remove and replace bathroom fixtures faucets, toilet and tub. upgrade electrical to code. lighting no change.Details
work in unit 208: remove and replace kitchen cabinets & fixtures. remove and replace bathroom fixtures faucets, toilet and tub. upgrade electrical to code. lighting no change. | $25,000 |
| Aug 23, 2010 | Completed final sign-off Nov 2010 | 729 Jones St | M H M Construction | #507- replace kitchen cabinets, plumbing and electrical, replace plumbing in bathroom, new tub, retile, replace cabinets, anglestops.Details
#507- replace kitchen cabinets, plumbing and electrical, replace plumbing in bathroom, new tub, retile, replace cabinets, anglestops. | $12,000 |
| Sep 19, 2007 | Completed final sign-off Jan 2008 | 729 Jones St | remodel kitchen. remodel bathroom. not changing ceiling of wall. no lighting per owner agent.Details
remodel kitchen. remodel bathroom. not changing ceiling of wall. no lighting per owner agent. | $14,625 | |
| Jan 24, 2007 | Completed final sign-off May 2007 | 729 Jones St | unit #315.kitchen remodel construct 6' wall to square off kitchen murphy bed area is to be removed. new cabinets, tile floor. bathroom remodel close off one door. new shower sink. toilet tile floore new fixtures. flourescent lightingDetails
unit #315.kitchen remodel construct 6' wall to square off kitchen murphy bed area is to be removed. new cabinets, tile floor. bathroom remodel close off one door. new shower sink. toilet tile floore new fixtures. flourescent lighting | $13,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- M H M Construction (4), J T & M Hardwood Flooring Construcing (3), Better Way Constructor Llc (2), Wen Bin Li Construction Co (2), Commercial Fire Protection Inc, Commercial Fire Protection Llc, Jack Strong Plumbing & Building Services, Magnum Construction Group Inc, Mendez-Ortiz Contractors
- Architects
- Jaime Pasion Arafiles
- Engineers
- Michael Chan (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.