Block 0319, lot 021
795 Geary St
- City’s use
- Multi-Family Residential
- Built
- 1912
- Stories
- 6
- Units
- 48
- Rooms
- 48 bathrooms
- Building
- 34,429 sq ft
- Lot
- 6,679 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 13, 2023 | Completed final sign-off Apr 2023 | 795 Geary St | J T & M Hardwood Flooring Construcing | #408: none structural remodel. upgrade one kitchen: replace cabinet, countertop, tiles floor. one bathroom: replace bath tub, shower valve, vanity, tile shower and floor. in kindDetails
#408: none structural remodel. upgrade one kitchen: replace cabinet, countertop, tiles floor. one bathroom: replace bath tub, shower valve, vanity, tile shower and floor. in kind | $30,000 |
| Jul 19, 2022 | Completed final sign-off Apr 2023 | 795 Geary St | C & E Electric & Fire Alarm Services | fire alarm voluntary lf horns upgrade to meet sffc 2019 sec 1103.7.6.1Details
fire alarm voluntary lf horns upgrade to meet sffc 2019 sec 1103.7.6.1 | $51,000 |
| Jan 21, 2022 | Never finaled issued Jan 2022, no final | 795 Geary St | Mendez-Ortiz Contractors | #405: renovate in kind kitchen and bathroom. all electrical and all plumbing as neededDetails
#405: renovate in kind kitchen and bathroom. all electrical and all plumbing as needed | $19,000 |
| Sep 24, 2021 | Completed final sign-off Dec 2021 | 795 Geary St | Mendez-Ortiz Contractors | unit 106: renovated in kind kitchen and bathroom. electrical and plumbing as needed.Details
unit 106: renovated in kind kitchen and bathroom. electrical and plumbing as needed. | $25,000 |
| Aug 16, 2018 | Completed final sign-off Oct 2018 | 795 Geary St | Wen Bin Li Construction Co | apt 306: remodel kitchen and bathroom. fix or replace bathroom windows. windows not visible from street. u-factor = .32 max. 5' x 8' bath, 12' x 7' kitchen. (2) total windowsDetails
apt 306: remodel kitchen and bathroom. fix or replace bathroom windows. windows not visible from street. u-factor = .32 max. 5' x 8' bath, 12' x 7' kitchen. (2) total windows | $37,000 |
| Aug 8, 2018 | Completed final sign-off Feb 2019 | 795 Geary St | San Francisco Fire Protection | phase 1 - like for like fire system replacement w/upgrade w/new panel. replace e smoke detector & pull stations w/new at the same location. install modules to tie-in flow & fau per switches. connect e bell to new panel. local system. phase 2 - will comply w/new sffc by 2021.Details
phase 1 - like for like fire system replacement w/upgrade w/new panel. replace e smoke detector & pull stations w/new at the same location. install modules to tie-in flow & fau per switches. connect e bell to new panel. local system. phase 2 - will comply w/new sffc by 2021. | $6,400 |
| May 29, 2018 | Completed final sign-off Aug 2018 | 795 Geary St | Wen Bin Li Construction Co | unit #305: remodel kitchen and bathrooms. fi or replace in-kind bathroom windows. paint unit. windows not visible from street/ lighting per cec 150.0(k)Details
unit #305: remodel kitchen and bathrooms. fi or replace in-kind bathroom windows. paint unit. windows not visible from street/ lighting per cec 150.0(k) | $40,000 |
| May 21, 2018 | Never finaled issued May 2018, no final | 795 Geary St | street space w/mtaDetails
street space w/mta | ||
| Dec 6, 2017 | Completed final sign-off Dec 2017 | 795 Geary St | Magnum Construction Group Inc | #108 -ti, extend (e) sprinkler heads to new ceiling height with new heads/ total 16. maher naDetails
#108 -ti, extend (e) sprinkler heads to new ceiling height with new heads/ total 16. maher na | $3,200 |
| Aug 28, 2017 | Completed final sign-off Oct 2017 | 795 Geary St | J T & M Hardwood Flooring Construcing | #303 - interior remodel ktichen & bath. replace cabinet, countertop, tile floor. replace bathtub, retile shower & floor. n/a maher ordinanceDetails
#303 - interior remodel ktichen & bath. replace cabinet, countertop, tile floor. replace bathtub, retile shower & floor. n/a maher ordinance | $15,000 |
| May 9, 2017 | Never finaled issued Jun 2017, no final | 795 Geary St | Mendez-Ortiz Contractors | #108-interior remodel/expansion, expand unit 108 into basement storage room. provide interior spiral stairs. provide home office and new bath at basement, relocate living area and kitchen to basement. provide new bedroom at 1st floor. remodel (e) bath at @ 1/f. sprinklers/alarm under separate permitDetails
#108-interior remodel/expansion, expand unit 108 into basement storage room. provide interior spiral stairs. provide home office and new bath at basement, relocate living area and kitchen to basement. provide new bedroom at 1st floor. remodel (e) bath at @ 1/f. sprinklers/alarm under separate permit | $52,000 |
| May 3, 2017 | Completed final sign-off Jul 2017 | 795 Geary St | Mendez-Ortiz Contractors | unit 203: renovate kitchen & bathroom, all in-kind, electrical/plumbing as needed.Details
unit 203: renovate kitchen & bathroom, all in-kind, electrical/plumbing as needed. | $15,000 |
| Feb 23, 2016 | Completed final sign-off May 2016 | 795 Geary St | Magnum Construction Group Inc | add two new sprinkler heads in unit #102 remodel area for closet maher na. ref 2015-1021-0316.Details
add two new sprinkler heads in unit #102 remodel area for closet maher na. ref 2015-1021-0316. | $2,000 |
| Dec 9, 2015 | Completed final sign-off Mar 2016 | 795 Geary St | Wen Bin Li Construction Co | work in unit #402: remodel kitchen and bathroom. no walls to be altered or removed.Details
work in unit #402: remodel kitchen and bathroom. no walls to be altered or removed. | $16,000 |
| Oct 21, 2015 | Never finaled issued Oct 2015, no final | 795 Geary St | M H M Construction | unit #102: interior remodel: provide 2 new bedrooms, 1 new study, 2 new bathrooms at the basement. remodel (e) kitchen on 1st flr. provide new spiral stairs within the unit. sprinklers under sep permit. maher naDetails
unit #102: interior remodel: provide 2 new bedrooms, 1 new study, 2 new bathrooms at the basement. remodel (e) kitchen on 1st flr. provide new spiral stairs within the unit. sprinklers under sep permit. maher na | $55,000 |
| Sep 15, 2015 | Completed final sign-off Jan 2016 | 795 Geary St | M H M Construction | exploratory demo at the basement level. temp remove lath and plaster for 200sf to observe sizes and locatoins of steel structural members. reinstall lath & plaster.Details
exploratory demo at the basement level. temp remove lath and plaster for 200sf to observe sizes and locatoins of steel structural members. reinstall lath & plaster. | $1,000 |
| Oct 17, 2014 | Completed final sign-off Feb 2015 | 795 Geary St | Magnum Construction Group Inc | #105 - add new sprinkler head @ closet & relcoate head remodel area only. ref pa #2014.0905.5582. n/a maher ordinanceDetails
#105 - add new sprinkler head @ closet & relcoate head remodel area only. ref pa #2014.0905.5582. n/a maher ordinance | $2,000 |
| Sep 22, 2014 | Completed final sign-off Feb 2015 | 795 Geary St | M H M Construction | #604: renovate kitchen and bathroom, all electrical and plumbing as needed. no alteration of wall, window and door.Details
#604: renovate kitchen and bathroom, all electrical and plumbing as needed. no alteration of wall, window and door. | $18,000 |
| Sep 5, 2014 | Completed final sign-off Nov 2014 | 795 Geary St | M H M Construction | to comply with nov #201460171 dated 3/21/2014. interior remodel in unit #105. remodel kitchen and bathroom at upper level. new bedroom, family, office and bath at lower level. new stairs connecting lower to upper level. n/a for the maher ordinance #155-13Details
to comply with nov #201460171 dated 3/21/2014. interior remodel in unit #105. remodel kitchen and bathroom at upper level. new bedroom, family, office and bath at lower level. new stairs connecting lower to upper level. n/a for the maher ordinance #155-13 | $60,000 |
| May 23, 2014 | Completed final sign-off Feb 2015 | 795 Geary St | Precision Design & Drafting Inc | removal of all 6 towerstream wifi antennas & keep one otard to comply with pnoe 12279. ** maher: compliance with ordinance no# 155-13 not required **Details
removal of all 6 towerstream wifi antennas & keep one otard to comply with pnoe 12279. ** maher: compliance with ordinance no# 155-13 not required ** | $500 |
| Jan 9, 2013 | Completed final sign-off Mar 2013 | 795 Geary St | M H M Construction | all work done only in unit 302. renovate kitchen and bathroom. add (n) exh fan in the bathroom; all (n) lighting will be flourescent. remove old kitchen cabinet. update electgrical and plumbing under separate permit. no structural work.Details
all work done only in unit 302. renovate kitchen and bathroom. add (n) exh fan in the bathroom; all (n) lighting will be flourescent. remove old kitchen cabinet. update electgrical and plumbing under separate permit. no structural work. | $18,000 |
| Jul 23, 2012 | Never finaled issued Jul 2012, no final | 795 Geary St | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| Oct 7, 2002 | Expired or cancelled cancelled Oct 2002 | 795 Geary St | window grillson two units to be installed to conform w/sffdDetails
window grillson two units to be installed to conform w/sffd | $600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- M H M Construction (5), Mendez-Ortiz Contractors (4), Magnum Construction Group Inc (3), Wen Bin Li Construction Co (3), J T & M Hardwood Flooring Construcing (2), C & E Electric & Fire Alarm Services, Precision Design & Drafting Inc, San Francisco Fire Protection
- Architects
- Jaime Arafiles
- Engineers
- Jaime Pasion Arafiles, Michael Chan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.