Block 0162, lot 024
12 Saroyan Pl
- City’s use
- Commercial Hotel
- Built
- 1911
- Stories
- 3
- Units
- 2
- Rooms
- 6 bathrooms
- Building
- 5,055 sq ft
- Lot
- 1,738 sq ft
- Zoning
- BDWY
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2020 | Completed final sign-off Nov 2020 | 527 Broadway | San Francisco Fire Protection | add-on to (e) fire alarm system to comply with sffc 1103.7.6.1: install power supply and low frequency horns in every room. ref pa201807104129. maher n/a.Details
add-on to (e) fire alarm system to comply with sffc 1103.7.6.1: install power supply and low frequency horns in every room. ref pa201807104129. maher n/a. | $3,000 |
| Jul 10, 2018 | Completed final sign-off Aug 2018 | 527 Broadway | San Francisco Fire Protection | replacement w/ new control panel, smoke heat detectors and pull stations at same location. tie-in (e) bells to new panel. install new radio communicator, monitor module to tie-in (e) flow and tamper. comply w/ new sffc by 2021Details
replacement w/ new control panel, smoke heat detectors and pull stations at same location. tie-in (e) bells to new panel. install new radio communicator, monitor module to tie-in (e) flow and tamper. comply w/ new sffc by 2021 | $5,500 |
| Jul 24, 2013 | Completed final sign-off Aug 2013 | 527 Broadway | Wen Bin Li Construction Co | to comply with ordinance 029-13: installation of grab bars in sro at he fofllowing locations: 2 toilet room 2nd floor, 1 24 inch grab bar, 1-16 inch grab bar, 2 toilets 3rd floor, 1 shower each floorDetails
to comply with ordinance 029-13: installation of grab bars in sro at he fofllowing locations: 2 toilet room 2nd floor, 1 24 inch grab bar, 1-16 inch grab bar, 2 toilets 3rd floor, 1 shower each floor | $400 |
| Oct 27, 2006 | Never finaled issued Oct 2006, no final | 527 Broadway | sidewalk repairDetails
sidewalk repair | ||
| Jan 7, 2004 | Expired or cancelled expired Feb 2007 | 527 Broadway | Matrix Seismic Corp | hardship for front entrance to be revised for appl#200206280309 "umb"special procedure per appl#Details
hardship for front entrance to be revised for appl#200206280309 "umb"special procedure per appl# | |
| Jun 6, 2003 | Never finaled issued Jun 2003, no final | 527 Broadway | street spaceDetails
street space | ||
| Jun 28, 2002 | Completed final sign-off Jan 2004 | 527 Broadway | Matrix Seismic Corp | umb special procedureDetails
umb special procedure | $45,000 |
| Oct 18, 2001 | Completed final sign-off Nov 2001 | 527 Broadway | Safeway Roofing & Siding Co. | reroofingDetails
reroofing | $11,350 |
| Apr 20, 2000 | Expired or cancelled cancelled May 2008 | 527 Broadway | seismic upgrade of unreinforced brick bldg to sf ordinance & assocd disability workDetails
seismic upgrade of unreinforced brick bldg to sf ordinance & assocd disability work | $101,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Matrix Seismic Corp (2), San Francisco Fire Protection (2), Safeway Roofing & Siding Co., Wen Bin Li Construction Co
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.