R E R Construction
- Based in
- Santa Rosa
- On San Francisco permits
- May 2018 to Sep 2026
- Last 24 months
- 8 permits filed
19 permits since 2000: 10 completed, 4 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 755 Ashbury St | construct new bathroom in existing room, install new accesible toilet & 1 new sink. install new door to reverse the swing of the existing door. no change to existing exit paths or loads.Details
construct new bathroom in existing room, install new accesible toilet & 1 new sink. install new door to reverse the swing of the existing door. no change to existing exit paths or loads. | $2,500 |
| Jun 26, 2026 | In progress issued Jul 2026 | 1201 Ortega St | remodel class room on 2nd fl., 20th av. wing, demo (e) wall of room on 2nd story, new 1 hr fire rated partition wall no changes to exit pathDetails
remodel class room on 2nd fl., 20th av. wing, demo (e) wall of room on 2nd story, new 1 hr fire rated partition wall no changes to exit path | $10,000 |
| May 15, 2026 | In progress issued Jul 2026 | 1201 Ortega St | basement: remodel of (e) activities room in basement. demo (e) storage room/closet. demo (e) wall, new wall with doors. relocate (e) furnace.Details
basement: remodel of (e) activities room in basement. demo (e) storage room/closet. demo (e) wall, new wall with doors. relocate (e) furnace. | $75,000 |
| May 15, 2026 | Completed final sign-off Jul 2026 | 755 Ashbury St | new door between class room 101 & library 102b. demo partition wall at library 102a. demo shower area in toilet room 103a. new partiton to enlarge storage closet. no structurl work.Details
new door between class room 101 & library 102b. demo partition wall at library 102a. demo shower area in toilet room 103a. new partiton to enlarge storage closet. no structurl work. | $10,000 |
| Feb 6, 2026 | Completed final sign-off Jul 2026 | 1201 Ortega St | rev 202411195309: change is exit corridor demensions to reflect as-built conditions.Details
rev 202411195309: change is exit corridor demensions to reflect as-built conditions. | |
| Nov 24, 2025 | Completed final sign-off Nov 2025 | 1201 Ortega St | to obtain final inspection for work approved under pa 202406174654,202407307549. all work is complete.Details
to obtain final inspection for work approved under pa 202406174654,202407307549. all work is complete. | |
| Apr 11, 2025 | Completed final sign-off Jan 2026 | 1201 Ortega St | derferred electrical permit for new 1611 sqft pavilion in existing courtyard (partial enclosure) ref: permit#202411195309Details
derferred electrical permit for new 1611 sqft pavilion in existing courtyard (partial enclosure) ref: permit#202411195309 | $5,000 |
| Nov 19, 2024 | Completed final sign-off Jul 2026 | 1201 Ortega St | 1611 sf pavilion in (e) courtyard (partial enclosure). new curtain wall and bifold doors at (e) lobby. demo planting beds/ new pavers set in sand. new egress path from ne corner of courtyard to 19th ave. mech and electrical under deferred permit.Details
1611 sf pavilion in (e) courtyard (partial enclosure). new curtain wall and bifold doors at (e) lobby. demo planting beds/ new pavers set in sand. new egress path from ne corner of courtyard to 19th ave. mech and electrical under deferred permit. | $400,000 |
| Jul 30, 2024 | Expired or cancelled expired Nov 2025 | 1201 Ortega St | new foundations for proposed courtyard canopy (no 202400636prj). add drainage and electrical conduits. finish slab under permit# 202406174654. no work above grade.Details
new foundations for proposed courtyard canopy (no 202400636prj). add drainage and electrical conduits. finish slab under permit# 202406174654. no work above grade. | |
| Jul 10, 2024 | In progress issued Jul 2024 | 755 Ashbury St | room 124: demo (e) wall, expand (e) restroom & build (n) walls to add 2nd toilet and sink. room 125: add (n) child size sink in (e) restroom. room 127: demo (2) adult size sinks and replace with (2) (n) child size sinks in restroom. demo wall between room 303 & 304. no change to (e) exit path/loads.Details
room 124: demo (e) wall, expand (e) restroom & build (n) walls to add 2nd toilet and sink. room 125: add (n) child size sink in (e) restroom. room 127: demo (2) adult size sinks and replace with (2) (n) child size sinks in restroom. demo wall between room 303 & 304. no change to (e) exit path/loads. | $15,000 |
| Jun 17, 2024 | Expired or cancelled expired Nov 2025 | 1201 Ortega St | demolish & rpelace in-kind cocrete slab in courtyard, sog.Details
demolish & rpelace in-kind cocrete slab in courtyard, sog. | $20,000 |
| May 29, 2024 | Completed final sign-off Aug 2024 | 755 Ashbury St | removal of storage room at classroom 117. new door sign at classroom 111. re-assignment of classrooms (115,116,123, 124, 214,222 and223). improvement of evacuation plans.Details
removal of storage room at classroom 117. new door sign at classroom 111. re-assignment of classrooms (115,116,123, 124, 214,222 and223). improvement of evacuation plans. | $25,000 |
| Jul 6, 2021 | Completed final sign-off Dec 2023 | 1201 Ortega St | create office room adjacent to main lobby. install 4 fire rated doors at library and 1 interior door between office at 2nd floor.Details
create office room adjacent to main lobby. install 4 fire rated doors at library and 1 interior door between office at 2nd floor. | $15,000 |
| Feb 28, 2020 | Completed final sign-off Nov 2020 | 755 Ashbury St | adding wooden stage w/ steps @ the multipurpose room in the basement. adding (n) ramp to acces the stage. adding movable curtain in the multipurpose room.Details
adding wooden stage w/ steps @ the multipurpose room in the basement. adding (n) ramp to acces the stage. adding movable curtain in the multipurpose room. | $1,800 |
| Sep 23, 2019 | Completed final sign-off Jun 2020 | 1201 Ortega St | remodel basement studio. remove and add walls in area; add ventilation to resulting room 20.Details
remodel basement studio. remove and add walls in area; add ventilation to resulting room 20. | $1,300 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 755 Ashbury St | new closet & built-in base cabinet in rm. 214, permanently secure unneeded fire door (outside rm 214) in open position, change grade of room 214 from 3rd grade to 2nd grade, disconnect of alarm & magnetic hold-open under deferred permitDetails
new closet & built-in base cabinet in rm. 214, permanently secure unneeded fire door (outside rm 214) in open position, change grade of room 214 from 3rd grade to 2nd grade, disconnect of alarm & magnetic hold-open under deferred permit | $1,400 |
| Jul 17, 2019 | Never finaled issued Aug 2019, no final | 755 Ashbury St | add a door to room 201a and to room 203 (2nd floor); add a wall and door to create room 301b (3rd floor) ref app#201703131280Details
add a door to room 201a and to room 203 (2nd floor); add a wall and door to create room 301b (3rd floor) ref app#201703131280 | $1,500 |
| Dec 14, 2018 | Never finaled issued Jul 2019, no final | 1935 19th Av | rev to pa# 201706260314 s-1 r/2; foundation system for pre-manufactured classroom.Details
rev to pa# 201706260314 s-1 r/2; foundation system for pre-manufactured classroom. | |
| May 17, 2018 | Completed final sign-off Oct 2018 | 1201 Ortega St | remoedl (e) classroom 222 to provide science lab equipment & cabinets. maher naDetails
remoedl (e) classroom 222 to provide science lab equipment & cabinets. maher na | $12,000 |