Gregory Schnackel
- Listed as
- architect, engineer
- Firm
- Gregory R. Schnackel
- On San Francisco permits
- Mar 2006 to Aug 2022
6 permits since 2000 (engineer on 5 permits, architect on 1 permit): 3 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2022 | Completed final sign-off Aug 2023 | 4 Embarcadero Center | Warwick Construction Inc | 1st fl tenant improvement for fedex office store. new finishes, graphics, lighting, new and relocated fixtures, equipment, relocated plumbing fixture, new mop sink, new restroom accessories, distribution of phone and pwr/data to equipment. mod mech, elec, plumbing work and mod to sprinkler/fire sysDetails
1st fl tenant improvement for fedex office store. new finishes, graphics, lighting, new and relocated fixtures, equipment, relocated plumbing fixture, new mop sink, new restroom accessories, distribution of phone and pwr/data to equipment. mod mech, elec, plumbing work and mod to sprinkler/fire sys | $350,000 |
| Jan 27, 2022 | Completed final sign-off Oct 2022 | 5290 Diamond Heights Bl | Eric F Anderson Incorporated | partial interior remodel of an existing grocery store. no work to facade.Details
partial interior remodel of an existing grocery store. no work to facade. | $1,000,000 |
| Dec 23, 2021 | Expired or cancelled withdrawn Jan 2022 | 15 Marina Bl | Eric F Anderson Incorporated | full store remodel of existing space.Details
full store remodel of existing space. | $1,000,000 |
| Jun 15, 2021 | Never finaled issued Oct 2021, no final | 518 Brannan St | K Bali Construction | revision to pa 202010096286. life safety plan. additional floor fixtures, wall type, ceiling element added, curb cut note, elevations update to reflect fixtures, finishes update. hvac ducting adjusted for new ceiling element. remove drinking fountain and add water line to bread room.Details
revision to pa 202010096286. life safety plan. additional floor fixtures, wall type, ceiling element added, curb cut note, elevations update to reflect fixtures, finishes update. hvac ducting adjusted for new ceiling element. remove drinking fountain and add water line to bread room. | $10,000 |
| Jun 24, 2016 | Completed final sign-off Dec 2017 | 18 Yerba Buena Ln | Gray West Construction Inc | ti to add rstrooms, kitchen & kitchen appliances. appliances include stoves, frigerator, sinks & hoods. life safety & kitchen hood suppression system under separate permit. ** maher: n/a **Details
ti to add rstrooms, kitchen & kitchen appliances. appliances include stoves, frigerator, sinks & hoods. life safety & kitchen hood suppression system under separate permit. ** maher: n/a ** | $1,100,000 |
| Mar 20, 2006 | Expired or cancelled expired Nov 2008 | 100 01st St | demolition of non-bearing partitions on 6 floors(14th,16th,17th,18th,19th, & 21st floor only) 1 hour corridor to be maintain on 16th and 17th floorDetails
demolition of non-bearing partitions on 6 floors(14th,16th,17th,18th,19th, & 21st floor only) 1 hour corridor to be maintain on 16th and 17th floor | $377,664 |