Stephanie Grandjacques
- License
- C36075
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Aug 2024 to Nov 2026
3 permits since 2000 (architect on 3 permits): 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Alpha Restoration & Wateproof, Skyline Construction
- Architects
- Adam Murphy
- Engineers
- Calin Smith
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 555 Mission St | 30th & 31st floor demolition of existing offices: ceilings, lighting, furniture, inteconnecting stair, store front glass partition & all interior finishes. this demolition permit is subject to ab-017 exception to requirement for disabled access to vacant spaces.Details
30th & 31st floor demolition of existing offices: ceilings, lighting, furniture, inteconnecting stair, store front glass partition & all interior finishes. this demolition permit is subject to ab-017 exception to requirement for disabled access to vacant spaces. | $256,554 | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 4 Embarcadero Center | Skyline Construction | 19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishesDetails
19th fl - ti of (e) office (485 sq ft). demolition of 2 enclosed offices and construction of four small enclosed offices. includes partitions, lighting and finishes | $73,320 |
| Aug 30, 2024 | In progress issued Jul 2025 | 947 Green St | Alpha Restoration & Wateproof | unit #3: repair and replacement of compromised structural members of existing rear wood deck of the 3rd floor unit of the ten story building. replacement of glass guardrail. no added square footage.Details
unit #3: repair and replacement of compromised structural members of existing rear wood deck of the 3rd floor unit of the ten story building. replacement of glass guardrail. no added square footage. | $10,000 |