Sashikala Murthy
- Listed as
- architect, engineer
- Firm
- Revel Architecture
- Based in
- San Francisco
- On San Francisco permits
- Feb 2022 to Sep 2026
192 permits since 2000 (architect on 189 permits, engineer on 3 permits): 114 completed, 68 in progress, 7 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 192.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 680 Folsom St | 1st fl:suite 145 - demolition of non structural, interior partitions and doors. new construction to include doors, partitions, ceilings, lighting, plumbing and finishes. mep submitted as separate permits. path of travel fro reference under previously approved permit #202604028744Details
1st fl:suite 145 - demolition of non structural, interior partitions and doors. new construction to include doors, partitions, ceilings, lighting, plumbing and finishes. mep submitted as separate permits. path of travel fro reference under previously approved permit #202604028744 | $383,986 | |
| Sep 22, 2026 | In progress issued Sep 2026 | 417 Montgomery St | Ten 5 Construction Inc | 1/fl- interior soft demo followed by (n) interior partitions, doors, finishes, mep and (n) accessible restroom photographs provided - interior was completely remodeled c. 1990-2000, no historic features intact in subject interior areaDetails
1/fl- interior soft demo followed by (n) interior partitions, doors, finishes, mep and (n) accessible restroom photographs provided - interior was completely remodeled c. 1990-2000, no historic features intact in subject interior area | $169,068 |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 680 Folsom St | 5th floor: shall consist of demolition of 3 non-structural interior partitions & 1 door & sidelite to combine 2 suites into 1 full floor tenant space. new construction to include floor, wall & ceiling patching required and minor electrical outlet relocation.Details
5th floor: shall consist of demolition of 3 non-structural interior partitions & 1 door & sidelite to combine 2 suites into 1 full floor tenant space. new construction to include floor, wall & ceiling patching required and minor electrical outlet relocation. | $74,875 | |
| Aug 20, 2026 | In progress issued Aug 2026 | 44 Montgomery St | Field Construction Inc. | ste 1500, 15th fl: minimal partition demo and associated doors/ frames/ glazing, lighting, and ceiling tile and grid. (n) open ceiling and lighting and finishes. no (n) doors, frames or millwork requires. any changes to mep, sprinklers and/or fls system will be submitted under separate permit.Details
ste 1500, 15th fl: minimal partition demo and associated doors/ frames/ glazing, lighting, and ceiling tile and grid. (n) open ceiling and lighting and finishes. no (n) doors, frames or millwork requires. any changes to mep, sprinklers and/or fls system will be submitted under separate permit. | $250,000 |
| Aug 19, 2026 | In progress issued Sep 2026 | 417 Montgomery St | interior demo of non-structural elements including partions,doors,finishes,mechanical and elecrical outlets and switches. dropped ceilings and associated lighting to remain intact. per administrative bulletin ab-017: occupancy /exiting to be addressed under seperate permit. fire sprinklers andDetails
interior demo of non-structural elements including partions,doors,finishes,mechanical and elecrical outlets and switches. dropped ceilings and associated lighting to remain intact. per administrative bulletin ab-017: occupancy /exiting to be addressed under seperate permit. fire sprinklers and | $60,000 | |
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 680 Folsom St | 2/f: interior demolition of non-structural items, including partitions and doors. new construction to include doors, partitions, ceilings, lighting, plumbing fixtures, and finishes. mep and fire life safety to be deferred submittals.Details
2/f: interior demolition of non-structural items, including partitions and doors. new construction to include doors, partitions, ceilings, lighting, plumbing fixtures, and finishes. mep and fire life safety to be deferred submittals. | $1,155,895 | |
| Aug 12, 2026 | In progress issued Aug 2026 | 45 Fremont St | Skyline Construction | 17/f: installation of life safety and seismic requirements for (2) one-person phone booths. accessibility upgrades in the core restrooms are also included. mep and fire life safety drawings are deferred.Details
17/f: installation of life safety and seismic requirements for (2) one-person phone booths. accessibility upgrades in the core restrooms are also included. mep and fire life safety drawings are deferred. | $127,000 |
| Aug 7, 2026 | In progress issued Sep 2026 | 535 Mission St | Gci, Inc | 27th floor: minor non-structural demolition of new power, life safety & seismic requirements for 4 new phone booths.Details
27th floor: minor non-structural demolition of new power, life safety & seismic requirements for 4 new phone booths. | $50,000 |
| Jul 21, 2026 | Completed final sign-off Sep 2026 | 600 Montgomery St | Hillhouse Construction Company Inc | revision to 202512111506, consist of 3 new interior doors. permit also establishes the employee breakroom use in lieu of a service kitchen.Details
revision to 202512111506, consist of 3 new interior doors. permit also establishes the employee breakroom use in lieu of a service kitchen. | |
| Jul 15, 2026 | In progress issued Jul 2026 | 44 Montgomery St | M C S Construction Services | 19th fl. floor is currently vacant common area upgrades include: corridors =(n) clgs, lighting, finishes, (n) drinking fountain, restrooms=(n) finishes, fixtures, and accessories, lighting, doors, exiting and occupancy do not change. if there are any changes to mep, sprklr, and/or fls systems thoseDetails
19th fl. floor is currently vacant common area upgrades include: corridors =(n) clgs, lighting, finishes, (n) drinking fountain, restrooms=(n) finishes, fixtures, and accessories, lighting, doors, exiting and occupancy do not change. if there are any changes to mep, sprklr, and/or fls systems those | $300,000 |
| Jul 15, 2026 | In progress issued Jul 2026 | 44 Montgomery St | M C S Construction Services | 19th fl. suite 1900: suite is currently vacant in shell condition. sow consists of minimal demo of corridor, incl, entry doors to be replaced, suite build out consists of (n) offices, mtg rooms, and break area, incl, non strl partitions, ppower clg, lighting finishes and millwork. any changes to mepDetails
19th fl. suite 1900: suite is currently vacant in shell condition. sow consists of minimal demo of corridor, incl, entry doors to be replaced, suite build out consists of (n) offices, mtg rooms, and break area, incl, non strl partitions, ppower clg, lighting finishes and millwork. any changes to mep | $1,200,000 |
| Jul 15, 2026 | In progress filed Jul 2026, not yet issued | 550 California St | revision to 202603318646. removeal of 1 partition. make 1 office into a meeting room and revise lighting and power as needed. provide furring near breakroom.Details
revision to 202603318646. removeal of 1 partition. make 1 office into a meeting room and revise lighting and power as needed. provide furring near breakroom. | ||
| Jul 14, 2026 | In progress issued Jul 2026 | 201 California St | Richlen Construction | ste 1100 11/f: includes new construction of conf rooms, huddle, phone & break area. mep will be submitted as a separate permit. scope does not alter fixture quantities, occ load, calcs or path of travel.Details
ste 1100 11/f: includes new construction of conf rooms, huddle, phone & break area. mep will be submitted as a separate permit. scope does not alter fixture quantities, occ load, calcs or path of travel. | $1,335,500 |
| Jun 16, 2026 | In progress issued Jul 2026 | 222 02nd St | Skyline Construction | 22nd fl: removal of elevator lobby doors on floor 22. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures.Details
22nd fl: removal of elevator lobby doors on floor 22. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures. | $20,500 |
| Jun 16, 2026 | In progress issued Jul 2026 | 222 02nd St | Skyline Construction | 21st fl: removal of elevator lobby doors on floor 21. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures.Details
21st fl: removal of elevator lobby doors on floor 21. replace with new doors with card reader. ada restroom upgrade. no new or change plumbing fixtures. | $32,600 |
| Jun 5, 2026 | In progress issued Jun 2026 | 550 California St | ste #220 (level 2) ti: demo and (n) non structural partitions, finishes, millwork, lighting, mep deferred. no structural or exterior work.Details
ste #220 (level 2) ti: demo and (n) non structural partitions, finishes, millwork, lighting, mep deferred. no structural or exterior work. | $324,300 | |
| Jun 5, 2026 | Completed final sign-off Aug 2026 | 101 California St | Hp Build | 25th floor- revision to bpa: 202602025031 - new location of demising wall. (ste 2575 $ 2550)Details
25th floor- revision to bpa: 202602025031 - new location of demising wall. (ste 2575 $ 2550) | |
| May 29, 2026 | In progress issued Jun 2026 | 505 Montgomery St | ste 620/6th fl: t.i. demo of non structural elements (int. partitions, doors, finishes, ceiling, lighting, mech & elec) construct of new non structural partitions, doors, finishes, lighting, millworks, mech & elec outlets, switches. full restroom accessibility upgradeDetails
ste 620/6th fl: t.i. demo of non structural elements (int. partitions, doors, finishes, ceiling, lighting, mech & elec) construct of new non structural partitions, doors, finishes, lighting, millworks, mech & elec outlets, switches. full restroom accessibility upgrade | $150,000 | |
| May 22, 2026 | Completed final sign-off Jul 2026 | 160 Spear St | Skyline Construction | 17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18.Details
17th and 18th floor. installation of 21 new phone booth (7) on 17th flr and (14) on floor 18. | $300,000 |
| May 1, 2026 | In progress issued Jun 2026 | 44 Montgomery St | M C S Construction Services | ste 1305 - office ti combine occupied ste 1303 w/adjacent vacant ste 1305. demo portion of demising wall, replace 2 single entry doors w/1 double door; (n) break area casework & appliances; (n) flooring in vacant ste; (n) clg tiles & lighting, (e) improvements & finishes to otherwise remain. anyDetails
ste 1305 - office ti combine occupied ste 1303 w/adjacent vacant ste 1305. demo portion of demising wall, replace 2 single entry doors w/1 double door; (n) break area casework & appliances; (n) flooring in vacant ste; (n) clg tiles & lighting, (e) improvements & finishes to otherwise remain. any | $194,460 |
| Apr 30, 2026 | In progress issued May 2026 | 550 California St | 4/f suite 430: tenant improvement. demo and new non-structural partitions, millwork, finishes. no structural or exterior work. mep deferred.Details
4/f suite 430: tenant improvement. demo and new non-structural partitions, millwork, finishes. no structural or exterior work. mep deferred. | $350,000 | |
| Apr 24, 2026 | Completed final sign-off Sep 2026 | 601 California St | Gci, Inc | 8th fl - office ti minor upgrades to (e) vacant suite: unpdating break area casework, appliances & flooring. new lighting throughout: new cavinet throughtout. updates to power/data. (e) improvements & finishes to otherwise remain, including ceilings. existing occupancy does not change. alterationsDetails
8th fl - office ti minor upgrades to (e) vacant suite: unpdating break area casework, appliances & flooring. new lighting throughout: new cavinet throughtout. updates to power/data. (e) improvements & finishes to otherwise remain, including ceilings. existing occupancy does not change. alterations | $320,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 550 California St | 14th fl, ste 440 ti demo (e) floor finish & build; (n) non-structural partitions, finishes, millwork, lighting. no structural/exterior work mep deferredDetails
14th fl, ste 440 ti demo (e) floor finish & build; (n) non-structural partitions, finishes, millwork, lighting. no structural/exterior work mep deferred | $350,000 | |
| Apr 2, 2026 | In progress issued Jun 2026 | 680 Folsom St | M C S Construction Services | floor 6 & 7: demolition of non-structural partitions and doors. new construction includes doors, partitions, ceilings, lighting, plumbing, and finishes. mep and fls deferred.Details
floor 6 & 7: demolition of non-structural partitions and doors. new construction includes doors, partitions, ceilings, lighting, plumbing, and finishes. mep and fls deferred. | $2,750,235 |
| Mar 31, 2026 | In progress issued Apr 2026 | 550 California St | level 2, suite 210. demo e and construct new non structural partitons, finishes,millwork, ceilings. no exterior or structural work. mep deferredDetails
level 2, suite 210. demo e and construct new non structural partitons, finishes,millwork, ceilings. no exterior or structural work. mep deferred | $350,000 | |
| Mar 23, 2026 | In progress issued Apr 2026 | 1 Embarcadero Center | Gci, Inc | 8th fl: consists of non-structural demo and construction of interior partitions, doors, finishes, ceilings, lighting, plumbing, mechanical and electrical switches. mep and fire/life safety deferred submittals. valuation based on ti costs only, mep costs deferred.Details
8th fl: consists of non-structural demo and construction of interior partitions, doors, finishes, ceilings, lighting, plumbing, mechanical and electrical switches. mep and fire/life safety deferred submittals. valuation based on ti costs only, mep costs deferred. | $2,900,000 |
| Mar 17, 2026 | In progress issued May 2026 | 505 Montgomery St | basement and ground floor: document pot ada compliance and ada upgrade (signage, new drop offs zone, restriping)Details
basement and ground floor: document pot ada compliance and ada upgrade (signage, new drop offs zone, restriping) | $20,000 | |
| Mar 4, 2026 | Completed final sign-off Jul 2026 | 650 California St | Skyline Construction | 11th fl - demo non-structural wing walls. install of new power life safety & seismic bracing for 10 new phone booths. restroom & drinking fountain upgrades 20% of construction costDetails
11th fl - demo non-structural wing walls. install of new power life safety & seismic bracing for 10 new phone booths. restroom & drinking fountain upgrades 20% of construction cost | $35,000 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 201 Spear St | Hathaway Dinwiddie Co. | spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & fls deferred. ada upgrades at core restrooms and path of travel striping scope.Details
spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets and switches. mep & fls deferred. ada upgrades at core restrooms and path of travel striping scope. | $750,000 |
| Feb 24, 2026 | Completed final sign-off Aug 2026 | 650 California St | Richlen Construction | ste# 2000/ 20th/f: selective demo & new const of interior partitions, doors, finishes, ceilings, lighting, electrical. scope of work included restroom accessibility upgrades. no exterior, site, landscaping or parking changes. fire life safety are deferredDetails
ste# 2000/ 20th/f: selective demo & new const of interior partitions, doors, finishes, ceilings, lighting, electrical. scope of work included restroom accessibility upgrades. no exterior, site, landscaping or parking changes. fire life safety are deferred | $707,557 |
| Feb 19, 2026 | In progress issued Mar 2026 | 550 California St | ste 450.scope of work on the 4/f consists of selective demo and new construction of non structural partition, doors, finishes, ceiling, lighting, mep and millwork, scope also includes path of travel upgrades of the g/fand parking garage. mep, fls, and sprinkers are to be deferred. interior work onlyDetails
ste 450.scope of work on the 4/f consists of selective demo and new construction of non structural partition, doors, finishes, ceiling, lighting, mep and millwork, scope also includes path of travel upgrades of the g/fand parking garage. mep, fls, and sprinkers are to be deferred. interior work only | $400,000 | |
| Feb 19, 2026 | Completed final sign-off Sep 2026 | 44 Montgomery St | Peacock Construction | 42 flr. suite 4250. demolition of non-structural partitions, elect millwork finishes and ceilings and lighting. construction of new partitions power, lighting finishes and millwork including corridor and ada restroom upgrades. mep lifesafety sprinkler under separate permit. ref#: 202305248479.Details
42 flr. suite 4250. demolition of non-structural partitions, elect millwork finishes and ceilings and lighting. construction of new partitions power, lighting finishes and millwork including corridor and ada restroom upgrades. mep lifesafety sprinkler under separate permit. ref#: 202305248479. | $544,955 |
| Feb 6, 2026 | In progress issued Feb 2026 | 1 Embarcadero Center | Gci, Inc | 38th fl ref pa #2025-0530-7558: add a gender neutral restroom. relocate one wall to a conference room and add glazing to two office partitions.Details
38th fl ref pa #2025-0530-7558: add a gender neutral restroom. relocate one wall to a conference room and add glazing to two office partitions. | |
| Jan 28, 2026 | Completed final sign-off Mar 2026 | 44 Montgomery St | M C S Construction Services | 19th fl: interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceiling, lighting, plumbing, mech & elec outlets and switches. suite to remain unoccupied per ab-017. ref fire sprinkler pa #2025-1203-0807Details
19th fl: interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceiling, lighting, plumbing, mech & elec outlets and switches. suite to remain unoccupied per ab-017. ref fire sprinkler pa #2025-1203-0807 | $215,000 |
| Jan 21, 2026 | Completed final sign-off Jun 2026 | 3 Embarcadero Center | Skyline Construction | 16/fl-scope of work includes creating (2) spec suites(1630 & 1650) demo of non structural interior partitons, doors, finishes, ceilings and lighting. new consruction includes non-structural partitons, doors, ceilings,lighting, plumbing, and finishes. fls and mep deferred.Details
16/fl-scope of work includes creating (2) spec suites(1630 & 1650) demo of non structural interior partitons, doors, finishes, ceilings and lighting. new consruction includes non-structural partitons, doors, ceilings,lighting, plumbing, and finishes. fls and mep deferred. | $826,866 |
| Dec 22, 2025 | In progress issued Jan 2026 | 550 California St | 11th floor: suite #1100:shell consists of selective interior demo including non-structural partitions. new construction includes interior nonstructural partitions, doors finishes, lighting, electrical, restroom upgrade, a movable partition with structural calculations. mep, fire, sprinkler,Details
11th floor: suite #1100:shell consists of selective interior demo including non-structural partitions. new construction includes interior nonstructural partitions, doors finishes, lighting, electrical, restroom upgrade, a movable partition with structural calculations. mep, fire, sprinkler, | $350,000 | |
| Dec 18, 2025 | In progress filed Dec 2025, not yet issued | 44 Montgomery St | 29/f: demo of non-strutural partitions, power, millwork, finishes, ceilings, and lighting. construction of new partitions and power lighting finishes and millwork. mep under separate permit and life safety. path of travel approved under pa# 202305278479.Details
29/f: demo of non-strutural partitions, power, millwork, finishes, ceilings, and lighting. construction of new partitions and power lighting finishes and millwork. mep under separate permit and life safety. path of travel approved under pa# 202305278479. | $700,000 | |
| Dec 17, 2025 | In progress issued Feb 2026 | 550 California St | suite 340- ti demo and (n) non structural partitions, finishes, millwork, lighting, no exterior work. mep deferredDetails
suite 340- ti demo and (n) non structural partitions, finishes, millwork, lighting, no exterior work. mep deferred | $350,000 | |
| Dec 12, 2025 | In progress issued Dec 2025 | 44 Montgomery St | M C S Construction Services | 29/f: common corridor and restroom upgrade, including removal and replacement of interior demo of non-structural elements-finishes, ceiling, lighting, restroom partitions, finishes, fixtures and accessories. installation of new drinking ftn. mep deffered.Details
29/f: common corridor and restroom upgrade, including removal and replacement of interior demo of non-structural elements-finishes, ceiling, lighting, restroom partitions, finishes, fixtures and accessories. installation of new drinking ftn. mep deffered. | $400,000 |
| Dec 11, 2025 | Completed final sign-off Sep 2026 | 650 California St | Skyline Construction | 22nd fl:commercial ti,demolition of non-structural partitions,doors,ceiling &lighting,millwork & finishes throughout.new construction to include new non-structural partitions,door&glazing,ceiling & lighting, millwork & finishes.new mep to be design-build.all workto be interior only,no workDetails
22nd fl:commercial ti,demolition of non-structural partitions,doors,ceiling &lighting,millwork & finishes throughout.new construction to include new non-structural partitions,door&glazing,ceiling & lighting, millwork & finishes.new mep to be design-build.all workto be interior only,no work | $4,300,000 |
| Dec 11, 2025 | In progress issued Feb 2026 | 600 Montgomery St | Hillhouse Construction Company Inc | interior demolition and construction of interior partitions. mep deferred to separate permit.pantry and coffee point to be defered permit. 18th fl. no food scope in this permit. deferred submisison for health scope will be sent for review at a later date.Details
interior demolition and construction of interior partitions. mep deferred to separate permit.pantry and coffee point to be defered permit. 18th fl. no food scope in this permit. deferred submisison for health scope will be sent for review at a later date. | $2,095,830 |
| Dec 5, 2025 | Completed final sign-off Jul 2026 | 101 California St | Hp Build | 9th floor suite 925: minor interior demo of non- structural items including partitions, doors, finishes, ceiling, lighting and power data. construction inncludes new interior non- structural partitions, doors,finishes, ceiling, lighting and power data. mep and fire life safety is deferred.Details
9th floor suite 925: minor interior demo of non- structural items including partitions, doors, finishes, ceiling, lighting and power data. construction inncludes new interior non- structural partitions, doors,finishes, ceiling, lighting and power data. mep and fire life safety is deferred. | $875,500 |
| Dec 5, 2025 | Completed final sign-off Aug 2026 | 101 California St | Hp Build | 28th floor suite 2820: combining suite 2800 and 2820 to create one suite. interior demo of non- structural elements including but no necessarily limited to interior partitions (non structural) doors, finishes, ceiling, lighting, and power data. mep deferred.Details
28th floor suite 2820: combining suite 2800 and 2820 to create one suite. interior demo of non- structural elements including but no necessarily limited to interior partitions (non structural) doors, finishes, ceiling, lighting, and power data. mep deferred. | $850,000 |
| Nov 5, 2025 | Completed final sign-off Feb 2026 | 601 California St | Peacock Construction | 20th flr. revision to pa 202501309343 conference wall & pantry wall @ hallway reworked to be full ht glazing includes power & ceiling (light) redesign.Details
20th flr. revision to pa 202501309343 conference wall & pantry wall @ hallway reworked to be full ht glazing includes power & ceiling (light) redesign. | |
| Nov 3, 2025 | In progress issued Nov 2025 | 550 California St | 4/fl- suite 410 consist of selective interior demo of non structrural partitions, finishes, doors, ceilings, lighting, mep. (n) construction consists of (n) non structural partitions, finishes, doors, ceilings, lighting and mep. does not affect path of travel, fixture quantities or occupant loadsDetails
4/fl- suite 410 consist of selective interior demo of non structrural partitions, finishes, doors, ceilings, lighting, mep. (n) construction consists of (n) non structural partitions, finishes, doors, ceilings, lighting and mep. does not affect path of travel, fixture quantities or occupant loads | $350,000 | |
| Oct 22, 2025 | Completed final sign-off May 2026 | 270 Brannan St | Field Construction Inc. | 4th - 6th fl consists of adding 19 phone booths and installation of life safety and seismic requirements in an existing office. path of travel and restroom accessibility upgrades up to 20% construction cost are included. deferred mep and flsDetails
4th - 6th fl consists of adding 19 phone booths and installation of life safety and seismic requirements in an existing office. path of travel and restroom accessibility upgrades up to 20% construction cost are included. deferred mep and fls | $190,000 |
| Oct 21, 2025 | In progress issued Oct 2025 | 550 California St | 12th fl suite 1200: selective interior demolition of non structural elements that include interior partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets and switches. construction includes partitions, doors, finishes, lighting, millwork, mech, electrical and plumbing.Details
12th fl suite 1200: selective interior demolition of non structural elements that include interior partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets and switches. construction includes partitions, doors, finishes, lighting, millwork, mech, electrical and plumbing. | $498,950 | |
| Oct 8, 2025 | In progress issued Nov 2025 | 4 Embarcadero Center | Gci, Inc | revision to previously approved permitdrawings for re-arrangement pantry idf copy storage room & (2) offices. previously approved permit#202505287341Details
revision to previously approved permitdrawings for re-arrangement pantry idf copy storage room & (2) offices. previously approved permit#202505287341 | |
| Oct 6, 2025 | In progress issued Oct 2025 | 101 California St | Source Planning And Construction Inc | 8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8Details
8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8 | |
| Oct 6, 2025 | In progress issued Oct 2025 | 550 California St | work within suite 910, consists of selectives interior demolition of non-structural partiations, doors, finishes, lighting, and mep. new construction of non-structural partitions, doors. finishes, lighting, ceiling, millwork, and mep. mep deferred. no exterior or structural work.Details
work within suite 910, consists of selectives interior demolition of non-structural partiations, doors, finishes, lighting, and mep. new construction of non-structural partitions, doors. finishes, lighting, ceiling, millwork, and mep. mep deferred. no exterior or structural work. | $500,000 | |
| Sep 19, 2025 | In progress issued Sep 2025 | 550 California St | 2/fl- ste 230- selected demo of non structrual partitions, finishes, doors, ceilings, lighting and mep. interior renovation consists of (n) non structural partitions, doors, finishes, ceilings, lights and mep. no change in path of travel,occupancy load. mep deferred no exterior or structrual work.Details
2/fl- ste 230- selected demo of non structrual partitions, finishes, doors, ceilings, lighting and mep. interior renovation consists of (n) non structural partitions, doors, finishes, ceilings, lights and mep. no change in path of travel,occupancy load. mep deferred no exterior or structrual work. | $350,000 | |
| Sep 19, 2025 | In progress issued Sep 2025 | 550 California St | 2/fl- ste 250- selected emo of non structrual partitions, finishes, doors, ceilings, lighting and mep. interior renovation consists of (n) non structural partitions, doors, finishes, ceilings, lights and mep. no change in path of travel,occupancy load. mep deferred no exterior or structrual work.Details
2/fl- ste 250- selected emo of non structrual partitions, finishes, doors, ceilings, lighting and mep. interior renovation consists of (n) non structural partitions, doors, finishes, ceilings, lights and mep. no change in path of travel,occupancy load. mep deferred no exterior or structrual work. | $350,000 | |
| Sep 17, 2025 | Completed final sign-off Feb 2026 | 44 Montgomery St | M C S Construction Services | demo of lighting: const. of new partitions power lighting and finishes of millwork.including corridor and restroom add upgrades. mep life & safety plans will be under seperate permit. path of travel presented and previously approved & for reference only. previous demo suite refer to pa#202310319830Details
demo of lighting: const. of new partitions power lighting and finishes of millwork.including corridor and restroom add upgrades. mep life & safety plans will be under seperate permit. path of travel presented and previously approved & for reference only. previous demo suite refer to pa#202310319830 | $2,020,000 |
| Sep 17, 2025 | Completed final sign-off Dec 2025 | 44 Montgomery St | Peacock Construction | 12/f suite 1250: revision to 202505086056 to add 2 phone booths including sprinkler, life/safety and structural anchoring. minor revision only. all other areas within previously approved design are to remain unchanged.Details
12/f suite 1250: revision to 202505086056 to add 2 phone booths including sprinkler, life/safety and structural anchoring. minor revision only. all other areas within previously approved design are to remain unchanged. | |
| Sep 3, 2025 | In progress issued Oct 2025 | 550 California St | l12m ste 1220 non-structural interior demo of partitions, finishes, ceilings, lighting and mep. new construction consists of (n) non-structural partitions, finishes, lighting, ceiling, doors, millwork and mep. renovation to (e) restrooms on 12th for ada compliance. no change in fixture quantitiesDetails
l12m ste 1220 non-structural interior demo of partitions, finishes, ceilings, lighting and mep. new construction consists of (n) non-structural partitions, finishes, lighting, ceiling, doors, millwork and mep. renovation to (e) restrooms on 12th for ada compliance. no change in fixture quantities | $450,000 | |
| Aug 29, 2025 | In progress issued Sep 2025 | 550 California St | l3 suite #310 : office t.i. to demo and install of new non-structual partitions, millwork, finishes, lighting, outlets. mep deffered. no exterior or structureDetails
l3 suite #310 : office t.i. to demo and install of new non-structual partitions, millwork, finishes, lighting, outlets. mep deffered. no exterior or structure | $203,611 | |
| Aug 28, 2025 | Completed final sign-off Apr 2026 | 201 Spear St | K Bali Construction | 18th floor. area of work currently in shell condition. work consist of new partitions, door/frames. new ensuites restroom w/new fixtures. new phone booth, power/data, lighting ,ceiling, millwork and finishes. fls to be deferred permits.Details
18th floor. area of work currently in shell condition. work consist of new partitions, door/frames. new ensuites restroom w/new fixtures. new phone booth, power/data, lighting ,ceiling, millwork and finishes. fls to be deferred permits. | $500,000 |
| Aug 27, 2025 | In progress issued Oct 2025 | 550 California St | 4/f suite 420: selective interior demo of non-structural elements including interior partitions, doors, finishes, lighting, etc. new interior construction consists of non-structural partitions, doors, finishes, lighting, millwork. mep and fire life safety deferred. no exterior or structural work.Details
4/f suite 420: selective interior demo of non-structural elements including interior partitions, doors, finishes, lighting, etc. new interior construction consists of non-structural partitions, doors, finishes, lighting, millwork. mep and fire life safety deferred. no exterior or structural work. | $210,000 | |
| Aug 11, 2025 | In progress issued Aug 2025 | 550 California St | level 3, suite 360 demo and installation of non structural partitions, finishes, lighting, millwork. mep deferred. no exterior workDetails
level 3, suite 360 demo and installation of non structural partitions, finishes, lighting, millwork. mep deferred. no exterior work | $350,000 | |
| Aug 4, 2025 | In progress issued Aug 2025 | 550 California St | level 2, suite 260. t.i. non-structural demo + (n) partitions, finishes, lighting. mep deferred. no exterior work.Details
level 2, suite 260. t.i. non-structural demo + (n) partitions, finishes, lighting. mep deferred. no exterior work. | $350,000 | |
| Aug 4, 2025 | In progress issued Aug 2025 | 550 California St | l3 - ste# 350. ti- non-structural demo and (n) partitions, finsihes, millwork, lighting. mep deferred. no exterior work.Details
l3 - ste# 350. ti- non-structural demo and (n) partitions, finsihes, millwork, lighting. mep deferred. no exterior work. | $350,000 | |
| Jun 30, 2025 | In progress issued Jul 2025 | 550 California St | 9th fl, ste 930 - interior demo & (n) non-structural partititions, finishes, lighting, break room. no exterior. mep deferredDetails
9th fl, ste 930 - interior demo & (n) non-structural partititions, finishes, lighting, break room. no exterior. mep deferred | $350,000 | |
| Jun 30, 2025 | In progress issued Jul 2025 | 550 California St | 9th fl, ste 920 - interior demo & (n) non-structural partititions, finishes, lighting, break room. no exterior. mep deferredDetails
9th fl, ste 920 - interior demo & (n) non-structural partititions, finishes, lighting, break room. no exterior. mep deferred | $350,000 | |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 101 California St | Novo Construction Inc | 13th floor; consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd.Details
13th floor; consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd. | $20,000 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 101 California St | Novo Construction Inc | 9th fl: ste 910 & 925 consist of int.demo non-structral elements including int. partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. suites are currently vacant. per admin. bulletin ab-017 ooc/exiting tobe addressed under separate permit; fs & l/s to remain operationalDetails
9th fl: ste 910 & 925 consist of int.demo non-structral elements including int. partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. suites are currently vacant. per admin. bulletin ab-017 ooc/exiting tobe addressed under separate permit; fs & l/s to remain operational | $10,000 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 101 California St | Novo Construction Inc | 11th fl: consist of int.demo non-structural elements including interior partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. floors are currently vacant. per admin. bulletin ab-017 ooc/exiting to be addressed under separate permit; f/s & l/s to remain operationalDetails
11th fl: consist of int.demo non-structural elements including interior partitions, doors, finishes, ceiling, lighting, mech & elec. outlets & switches. floors are currently vacant. per admin. bulletin ab-017 ooc/exiting to be addressed under separate permit; f/s & l/s to remain operational | $20,000 |
| Jun 17, 2025 | Completed final sign-off Aug 2025 | 101 California St | Novo Construction Inc | 12th fl consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd. noDetails
12th fl consist of interior demo of non-structural elements including inter. partitions, doors, finishes, ceiling, light, mech & elect outlets/switches floor is currently vacant. per admin ab017. fire sprinkler and life safety to remain operational. pave of travel/accessiblity scope not reqd. no | $20,000 |
| Jun 11, 2025 | In progress issued Jul 2025 | 550 California St | 10th/f ste# 1040: t.i. office suite build-out, mep defferredDetails
10th/f ste# 1040: t.i. office suite build-out, mep defferred | $250,000 | |
| Jun 11, 2025 | In progress issued Jul 2025 | 550 California St | 10th/f ste# 1010: selective interior demo of non structural elements. new interior paritions, doors, finishes, lighting, mech/elec, outlets & switches. mep,f/lf/s & fire sprinkler dwg submitted separately. work do not affect fixtures guantities or path of traval. no exterior bldg, site, landscape,Details
10th/f ste# 1010: selective interior demo of non structural elements. new interior paritions, doors, finishes, lighting, mech/elec, outlets & switches. mep,f/lf/s & fire sprinkler dwg submitted separately. work do not affect fixtures guantities or path of traval. no exterior bldg, site, landscape, | $200,000 | |
| Jun 5, 2025 | In progress issued Aug 2025 | 550 California St | scope consists of selective demo of non structural elements including but not limited to int partitions, doors, finishes, ceilings, lighting, mech and elec outlets and switches. refer to mech and elec plans.scope also includes rr accessibility upgrades. f/l/s and fire sprinkler drawings will be submDetails
scope consists of selective demo of non structural elements including but not limited to int partitions, doors, finishes, ceilings, lighting, mech and elec outlets and switches. refer to mech and elec plans.scope also includes rr accessibility upgrades. f/l/s and fire sprinkler drawings will be subm | $210,000 | |
| May 29, 2025 | Completed final sign-off Nov 2025 | 601 California St | Peacock Construction | minor mofifications to (e) occupied suite, includes (1) reppurposed & (3) new offices with respective new power updated ceilings & lightning & finishes, etc as necessary, alson includes replacing (2) (e) doors and relocationg it equipment into new closet mech & elec, sprinkler & lifesagety underDetails
minor mofifications to (e) occupied suite, includes (1) reppurposed & (3) new offices with respective new power updated ceilings & lightning & finishes, etc as necessary, alson includes replacing (2) (e) doors and relocationg it equipment into new closet mech & elec, sprinkler & lifesagety under | $285,000 |
| May 28, 2025 | In progress issued Jul 2025 | 4 Embarcadero Center | Gci, Inc | 23rd flr. demo of non structural insterior partitions, doors, ceilings, lighting, finishes 23rd fl suite 2310. new cosntruction includes new walls, doors, ceilings, lighting, millwork and finishes. mep and fls are deferred. mep and fls are deferred submittals.Details
23rd flr. demo of non structural insterior partitions, doors, ceilings, lighting, finishes 23rd fl suite 2310. new cosntruction includes new walls, doors, ceilings, lighting, millwork and finishes. mep and fls are deferred. mep and fls are deferred submittals. | $528,024 |
| May 22, 2025 | Completed final sign-off Nov 2025 | 601 California St | Peacock Construction | 14th fl/ suite 1475: minor demo and build-out in an existing suite. new entry doors/walls/lightening/ceiling tile/finishes/interior casework and sink. deferred mep on a seperate permit.Details
14th fl/ suite 1475: minor demo and build-out in an existing suite. new entry doors/walls/lightening/ceiling tile/finishes/interior casework and sink. deferred mep on a seperate permit. | $235,000 |
| May 8, 2025 | Completed final sign-off Sep 2025 | 580 California St | Skyline Construction | 20th fl suite 2000: scope consists interior demolition & construction of non structural elements including but not limited to interior partitions, doors, outlets & lighting. mech, elec, plumbing and fire sprinkler plans will be submitted as separate permit.Details
20th fl suite 2000: scope consists interior demolition & construction of non structural elements including but not limited to interior partitions, doors, outlets & lighting. mech, elec, plumbing and fire sprinkler plans will be submitted as separate permit. | $600,000 |
| May 8, 2025 | Completed final sign-off Dec 2025 | 44 Montgomery St | Peacock Construction | 12th floor:consist of conbining suite 1230 to 1250 to create one suite. demo includes minimal demo of partitions, power/data, flooring, lighting, and finishes. construction includes minimal new partitions, doors, power, lighting, & finishes. mep, fire life safty, & sprinklers system modificationsDetails
12th floor:consist of conbining suite 1230 to 1250 to create one suite. demo includes minimal demo of partitions, power/data, flooring, lighting, and finishes. construction includes minimal new partitions, doors, power, lighting, & finishes. mep, fire life safty, & sprinklers system modifications | $184,000 |
| Apr 30, 2025 | In progress issued May 2025 | 550 California St | 10/f (ste 1020): selective interior demo of non-structural elements. (n) interior partitions, doors, finishes, lighting, mechanical, & electrical outlets and switches. refer to mech and electrical plans. fls and fire sprinkler drawings will be submitted separately. scope does not affect fixture...Details
10/f (ste 1020): selective interior demo of non-structural elements. (n) interior partitions, doors, finishes, lighting, mechanical, & electrical outlets and switches. refer to mech and electrical plans. fls and fire sprinkler drawings will be submitted separately. scope does not affect fixture... | $350,000 | |
| Apr 30, 2025 | In progress issued May 2025 | 550 California St | 10th fl suite 1030: selective interior demo of non structural elements. (n) interior partitions, doors, finishes, lighting, mechanical and electrical outlets & switches. refer to mech & elec plans. f/l/s and fire sprinkler drawings submitted under separate permit.Details
10th fl suite 1030: selective interior demo of non structural elements. (n) interior partitions, doors, finishes, lighting, mechanical and electrical outlets & switches. refer to mech & elec plans. f/l/s and fire sprinkler drawings submitted under separate permit. | $350,000 | |
| Apr 24, 2025 | In progress issued May 2025 | 550 California St | 3rd fl - selective int'r demo of non-struc'l elements inlcuding but not limited to interior partitions, doors, finishes, clg, lighting, mech & elec outlets & switches refer to mech & elec plans. scope includes rr accessibility upgrades. fls & fire sprinkler drwg's to be submitted separately. scopeDetails
3rd fl - selective int'r demo of non-struc'l elements inlcuding but not limited to interior partitions, doors, finishes, clg, lighting, mech & elec outlets & switches refer to mech & elec plans. scope includes rr accessibility upgrades. fls & fire sprinkler drwg's to be submitted separately. scope | $100,000 | |
| Apr 16, 2025 | Completed final sign-off Aug 2025 | 101 California St | Richlen Construction | suite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred.Details
suite 4225,42nd fl: interior demo of non structural partitions, millwork, ceilings, lighting & finishes. construction includes new partitions, doors, ceilings, lighting and millwork/finishes. mep & fire life safety are deferred. | $422,171 |
| Apr 11, 2025 | Completed final sign-off Dec 2025 | 4 Embarcadero Center | Field Construction Inc. | suite 3120 (31st/fl): interior demo of non-structural partitions, doors, ceiling, lighting, and finishes. new construction consists of partitions, doors ceilings, lighting, millwork, and finishes. mep and fire safety deferred permits.Details
suite 3120 (31st/fl): interior demo of non-structural partitions, doors, ceiling, lighting, and finishes. new construction consists of partitions, doors ceilings, lighting, millwork, and finishes. mep and fire safety deferred permits. | $250,000 |
| Apr 8, 2025 | Completed final sign-off Jun 2026 | 222 02nd St | Novo Construction Inc | 16th fl: removal of elevator lobby doors floor 16. replace with new doors with card reader 20% ada restroom upgrades on flr 16.Details
16th fl: removal of elevator lobby doors floor 16. replace with new doors with card reader 20% ada restroom upgrades on flr 16. | $60,000 |
| Mar 27, 2025 | In progress issued Mar 2025 | 550 California St | 14th/f: selective demo & minor construction of interior partitions, doors, finishes, & lighting ref to mech & electrical plans. fire/life safety & sprinkler drawings will be submitted sepratedly, scope of work does not affect fixture quantities, occupany load & calculation or path of travel.Details
14th/f: selective demo & minor construction of interior partitions, doors, finishes, & lighting ref to mech & electrical plans. fire/life safety & sprinkler drawings will be submitted sepratedly, scope of work does not affect fixture quantities, occupany load & calculation or path of travel. | $150,000 | |
| Mar 24, 2025 | Completed final sign-off Jun 2025 | 55 Francisco St | Hp Build | project consists of minimal demo of (e) partitions, doors associated power/data floor finishes construction of (n) partitions, doors, power data, minimal relocation/new lighting, millwork, sink(s) toiet and finishes, mep, life safety and sprinkler system modifications are to be under seperate andDetails
project consists of minimal demo of (e) partitions, doors associated power/data floor finishes construction of (n) partitions, doors, power data, minimal relocation/new lighting, millwork, sink(s) toiet and finishes, mep, life safety and sprinkler system modifications are to be under seperate and | $480,000 |
| Mar 19, 2025 | Completed final sign-off Mar 2026 | 101 California St | Skyline Construction | 35th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234Details
35th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234 | |
| Mar 19, 2025 | Completed final sign-off Mar 2026 | 101 California St | Skyline Construction | 34th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234Details
34th fl- interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceilings, lighting, mechanical and electrical outlets and swithces. fire sprinkler modification permit # 2025-0314-2234 | |
| Mar 10, 2025 | Completed final sign-off Sep 2025 | 680 Folsom St | M C S Construction Services | 5th fl/: scope of work on the 5th floor shall consist of demolition of non structural interior partitions, doors, finishes. new work to include partitions, doors, finishes, millork, ceiling and lighting. (e) restrooms to be upgraded. mep ad fire/safety are deferred submittals.Details
5th fl/: scope of work on the 5th floor shall consist of demolition of non structural interior partitions, doors, finishes. new work to include partitions, doors, finishes, millork, ceiling and lighting. (e) restrooms to be upgraded. mep ad fire/safety are deferred submittals. | $1,498,885 |
| Mar 3, 2025 | Completed final sign-off Jul 2025 | 555 Mission St | M C S Construction Services | 32nd,ste 3200 - minor interior demo and construction of non-structural elements including int; partitions, doors, finishes, elec outlets scope includes restroom accessibility upgrades; installation of (4) phone booths included in the scope. mep will be a separate permit. scope does not affect fixturDetails
32nd,ste 3200 - minor interior demo and construction of non-structural elements including int; partitions, doors, finishes, elec outlets scope includes restroom accessibility upgrades; installation of (4) phone booths included in the scope. mep will be a separate permit. scope does not affect fixtur | $361,743 |
| Feb 19, 2025 | In progress issued Mar 2025 | 550 California St | 2/f: selective demo of non-structural elements including but not limited to int. partitions, doors, finishes, ceilings, lighting, mech/elec outs and switches per mech/elec plans. restroom accessibility upgrades. f/l/s and fire sprinkler drawings under separate permit. scope does not affect fixtureDetails
2/f: selective demo of non-structural elements including but not limited to int. partitions, doors, finishes, ceilings, lighting, mech/elec outs and switches per mech/elec plans. restroom accessibility upgrades. f/l/s and fire sprinkler drawings under separate permit. scope does not affect fixture | $75,000 | |
| Feb 13, 2025 | Completed final sign-off Dec 2025 | 1 Embarcadero Center | Gci, Inc | interior selective demo of non structural elements including partitons, doors, finishes, ceilings, lighting, mech and elec outlets and switches. new consturction to include doors, partitons, lighting, ceilings, finishes, plumbing. includes rr accessibility upgrades. mep and fire/ls deferred permitsDetails
interior selective demo of non structural elements including partitons, doors, finishes, ceilings, lighting, mech and elec outlets and switches. new consturction to include doors, partitons, lighting, ceilings, finishes, plumbing. includes rr accessibility upgrades. mep and fire/ls deferred permits | $1,660,000 |
| Dec 24, 2024 | Completed final sign-off Oct 2025 | 601 California St | Peacock Construction | 14/fl- oti demising a vacant suite. minor demo followed by construction of meeting rooms, break area copy etc build out includes (n) non rated partitions, doors, frames, hardware, power/data casework/plumbing, ceiling/lighting, and (n) finishies throughout. any alteration to mep , sprinkler or flsDetails
14/fl- oti demising a vacant suite. minor demo followed by construction of meeting rooms, break area copy etc build out includes (n) non rated partitions, doors, frames, hardware, power/data casework/plumbing, ceiling/lighting, and (n) finishies throughout. any alteration to mep , sprinkler or fls | $735,000 |
| Dec 18, 2024 | Completed final sign-off Apr 2025 | 101 California St | Source Planning And Construction Inc | minor interior demolition of non structural elements including interior partitions, doors, finishes. new interior demising partitions and finishes. current vacant. mech,elec, life safety and sprinkler modifications under sep and deferred permit. no exterior building, site, landscape, use or parkingDetails
minor interior demolition of non structural elements including interior partitions, doors, finishes. new interior demising partitions and finishes. current vacant. mech,elec, life safety and sprinkler modifications under sep and deferred permit. no exterior building, site, landscape, use or parking | $48,000 |
| Dec 18, 2024 | Completed final sign-off Jun 2025 | 101 California St | Hp Build | 42/f:scope consist of minor demo of non structural interior partitions and assciated power doors, finishes, ceiling,& lightings. const. included new partitions, doors, ceiling lighting & new finishes. mech,elec,fire,life safety & sprinkler drawings are to be under seperate , deferred permits.Details
42/f:scope consist of minor demo of non structural interior partitions and assciated power doors, finishes, ceiling,& lightings. const. included new partitions, doors, ceiling lighting & new finishes. mech,elec,fire,life safety & sprinkler drawings are to be under seperate , deferred permits. | $75,000 |
| Dec 18, 2024 | Completed final sign-off Jul 2025 | 101 California St | Hp Build | 42f/:scope to bring restrooms and drinking fountains on floor 42 to full accessibility compliance. demo of restroom partitions , finishes, plumbing fix., accessories to be replaced with new. mech, elec.,plumbing, life safety and sprinkler systems and modifications will be deferred submittals.Details
42f/:scope to bring restrooms and drinking fountains on floor 42 to full accessibility compliance. demo of restroom partitions , finishes, plumbing fix., accessories to be replaced with new. mech, elec.,plumbing, life safety and sprinkler systems and modifications will be deferred submittals. | $250,000 |
| Dec 17, 2024 | In progress issued Feb 2025 | 550 California St | ground floor- revision of 202410032227- deferred mep to retain (e) electrical closet and associated mepDetails
ground floor- revision of 202410032227- deferred mep to retain (e) electrical closet and associated mep | ||
| Dec 12, 2024 | In progress issued Apr 2025 | 101 California St | Source Planning And Construction Inc | 8/fl- selective interior demo in 2 suites and new construction in one suite only including: interior partitions doors finishes ceilings etc. no changes to exterior building, site , landscape use or parking and building structure are proposedDetails
8/fl- selective interior demo in 2 suites and new construction in one suite only including: interior partitions doors finishes ceilings etc. no changes to exterior building, site , landscape use or parking and building structure are proposed | $2,500,000 |
| Dec 12, 2024 | Completed final sign-off Sep 2025 | 201 California St | Richlen Construction | 2nd flr. project scope on 2nd flr. consists of interior demo and new construction of non-structural elements; interior partitions, doors, finishes, ceilings, lighting, mechanical and plumbing (includes path of travel and restrooms).Details
2nd flr. project scope on 2nd flr. consists of interior demo and new construction of non-structural elements; interior partitions, doors, finishes, ceilings, lighting, mechanical and plumbing (includes path of travel and restrooms). | $400,000 |
| Dec 5, 2024 | Completed final sign-off Mar 2025 | 101 California St | Hp Build | ste 1950/ 19th fl: interior demo of non structural elements included but not limited to interior partitions, door, finishes, ceiling, lighting, mech, & electrical outlets & swithes. fire sprinkler modification pa # 202412036018Details
ste 1950/ 19th fl: interior demo of non structural elements included but not limited to interior partitions, door, finishes, ceiling, lighting, mech, & electrical outlets & swithes. fire sprinkler modification pa # 202412036018 | $11,000 |
| Nov 22, 2024 | In progress issued Nov 2024 | 550 California St | 10th fl selective demo of non structural elements including int partitions, doors, finishes, ceiling, lighting, mech, elec outlets, switches per mech/elec plans. restroom accessibolity upgrades. flws & sprinkler drawings under sep permit. does not affect fixture quantities,occ load calcs, or pot.Details
10th fl selective demo of non structural elements including int partitions, doors, finishes, ceiling, lighting, mech, elec outlets, switches per mech/elec plans. restroom accessibolity upgrades. flws & sprinkler drawings under sep permit. does not affect fixture quantities,occ load calcs, or pot. | $75,000 | |
| Nov 22, 2024 | In progress issued Nov 2024 | 550 California St | 6th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scopeDetails
6th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scope | $75,000 | |
| Nov 22, 2024 | In progress issued Nov 2024 | 550 California St | 9th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scopeDetails
9th fl - scope consists of selective interior demo of non-structural elements including but not limited to inc partitions, door, finishes, clg, lighting, mech, elec, outlets & switches. refer to mech/elec plans. rr accessibility upgrades. fls & fire sprinklers dwgs will be separate permit. scope | $75,000 |