Block 0808, lot 007
412 Hayes St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 8
- Rooms
- 16 bedrooms, 8 bathrooms
- Building
- 10,110 sq ft
- Lot
- 5,145 sq ft
- Zoning
- HAYES
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 11, 2026 | Completed final sign-off May 2026 | 412 Hayes St | Bic Construction Inc | to comply with nov 202540043 application seeks to legalize the removal of 2 guestrooms on the 1st flDetails
to comply with nov 202540043 application seeks to legalize the removal of 2 guestrooms on the 1st fl | |
| Sep 15, 2022 | Completed final sign-off Nov 2022 | 416 Hayes St | Bic Construction Inc | rev to pa 202107305470. the work showen is commerical ti, includes, retail case work, closets, lighting, electrical distribution. no alterations to the existing struc and no new struc work.Details
rev to pa 202107305470. the work showen is commerical ti, includes, retail case work, closets, lighting, electrical distribution. no alterations to the existing struc and no new struc work. | $57,000 |
| Aug 26, 2022 | Completed final sign-off Dec 2023 | 416 Hayes St | Custom Contracting Services, Maguire Inc Dba Lahue And Associates | the new tenant of ground floor retail space proposes to install asign directly above their storefront glazing on hayes street the sign is basically flat with a small blade sign element mounted directly to front of three story building. non-electricDetails
the new tenant of ground floor retail space proposes to install asign directly above their storefront glazing on hayes street the sign is basically flat with a small blade sign element mounted directly to front of three story building. non-electric | $2,500 |
| Aug 23, 2022 | Never finaled issued Aug 2022, no final | 418 Hayes St | International Commercial Awning, Inc. | handpainted logos "bulo" over (e) awning on front and sides of awning, per plans.Details
handpainted logos "bulo" over (e) awning on front and sides of awning, per plans. | $500 |
| Aug 23, 2022 | Completed final sign-off Sep 2022 | 418 Hayes St | International Commercial Awning, Inc. | remove and replace (e) awning with new fabricated awning and install over (e) storefront .Details
remove and replace (e) awning with new fabricated awning and install over (e) storefront . | $2,500 |
| Jul 30, 2021 | Completed final sign-off Nov 2022 | 416 Hayes St | 1/f commerical space: relocate stair access to basement storage. new wall/door, plus accessibility improvement at entry and toilet room. mep, fire, and life safety to be separate permitDetails
1/f commerical space: relocate stair access to basement storage. new wall/door, plus accessibility improvement at entry and toilet room. mep, fire, and life safety to be separate permit | $25,000 | |
| Jul 21, 2010 | Completed final sign-off Dec 2010 | 412 Hayes St | Francisco Zarceno | renovate existing 224: replace existing sink and faucet. sheetrock walls, replace closet doorsDetails
renovate existing 224: replace existing sink and faucet. sheetrock walls, replace closet doors | $2,500 |
| Jul 21, 2010 | Completed final sign-off Jan 2011 | 412 Hayes St | Francisco Zarceno | to complete work & obtain final inspection for work approved under pa 200609212947 (ref. 200710256486)Details
to complete work & obtain final inspection for work approved under pa 200609212947 (ref. 200710256486) | $10,000 |
| Jul 21, 2010 | Completed final sign-off Feb 2011 | 321 Ivy St | Francisco Zarceno | to complete work & obtain final inspection for work approved under pa 2005033008800Details
to complete work & obtain final inspection for work approved under pa 2005033008800 | $200 |
| Jul 21, 2010 | Completed final sign-off Jan 2011 | 412 Hayes St | Francisco Zarceno | to complete work & obtain final inspection for work approved under pa 200804079038; all work is completeDetails
to complete work & obtain final inspection for work approved under pa 200804079038; all work is complete | $850 |
| Jul 21, 2010 | Completed final sign-off Jan 2011 | 319 Ivy St | Francisco Zarceno | comply with nov 200115675, extend vent from dryer. replace 2 elec heatersDetails
comply with nov 200115675, extend vent from dryer. replace 2 elec heaters | $750 |
| Jan 21, 2009 | Expired or cancelled expired Jan 2011 | 420 Hayes St | revision to original applications #2008/0822/9850 & 2008/0822/9852. revised shoring details based on varying field conditions.Details
revision to original applications #2008/0822/9850 & 2008/0822/9852. revised shoring details based on varying field conditions. | ||
| Aug 22, 2008 | Expired or cancelled expired Jun 2011 | 420 Hayes St | temporary shoring and underpinning work for proposed excavation and addition at 424 hayesDetails
temporary shoring and underpinning work for proposed excavation and addition at 424 hayes | $20,000 | |
| Jun 20, 2008 | Never finaled issued Jun 2008, no final | 412 Hayes St | Cespedes Construction | renew pa#200609212947,#200710256486 for final inspection.Details
renew pa#200609212947,#200710256486 for final inspection. | |
| Apr 7, 2008 | Completed final sign-off Jan 2011 | 412 Hayes St | Cespedes Construction | to comply with his nov# 200837631, nov# 200787832 dated 01/07/2008 & 01/09/2008. repair floor & frame, complaint# 200787832 adj to kitchen. repair stairs, repair siding complaint# 200799793. less than 50%.Details
to comply with his nov# 200837631, nov# 200787832 dated 01/07/2008 & 01/09/2008. repair floor & frame, complaint# 200787832 adj to kitchen. repair stairs, repair siding complaint# 200799793. less than 50%. | $850 |
| Jan 29, 2008 | Never finaled issued Jan 2008, no final | 412 Hayes St | street space permit only.Details
street space permit only. | ||
| Oct 25, 2007 | Never finaled issued Oct 2007, no final | 412 Hayes St | Cespedes Construction | renew pa#200609212947 for final inspection. to comply with/his#200787832.Details
renew pa#200609212947 for final inspection. to comply with/his#200787832. | |
| Sep 21, 2006 | Completed final sign-off Jan 2011 | 412 Hayes St | Cespedes Construction | corrective action per housing complaint no. 200672979. install fire doors, construct hallway, build 3 kitchens.Details
corrective action per housing complaint no. 200672979. install fire doors, construct hallway, build 3 kitchens. | $40,000 |
| Mar 30, 2005 | Expired or cancelled expired Jan 2006 | 321 Ivy St | Francisco Zarceno | fix fire escape ladder to the roof - repair in kindDetails
fix fire escape ladder to the roof - repair in kind | $550 |
| Sep 5, 2001 | Expired or cancelled expired Jan 2002 | 319 Ivy St | new vanity/lavy,ceramic tile in shower on flr in bath on 2nd flr 1 bath only.Details
new vanity/lavy,ceramic tile in shower on flr in bath on 2nd flr 1 bath only. | $1,500 | |
| May 17, 2001 | Completed final sign-off Aug 2001 | 319 Ivy St | Woodstone Construction | abate violation#200113006 for the folling scope: install 1hr n-baring separation wall w/solid coreDetails
abate violation#200113006 for the folling scope: install 1hr n-baring separation wall w/solid core | $8,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.