Michael Fields
- Listed as
- architect
- Firm
- Boulder Associates Architect
- On San Francisco permits
- Jan 2012 to Jun 2024
10 permits since 2000 (architect on 10 permits): 9 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 13, 2024 | Completed final sign-off Nov 2024 | 1635 Divisadero St | Unger Construction Co | revision to 202212229020. correct and clarify incorrect hazardous classified information at med gas room shown on elec sheet note 2. medical gas stored at med gas room (oxygent and nitrous oxide is not identified as flammable anesthtics per code definition and not listed on explosion control req perDetails
revision to 202212229020. correct and clarify incorrect hazardous classified information at med gas room shown on elec sheet note 2. medical gas stored at med gas room (oxygent and nitrous oxide is not identified as flammable anesthtics per code definition and not listed on explosion control req per | |
| Jun 12, 2024 | Completed final sign-off Nov 2024 | 1635 Divisadero St | Unger Construction Co | revision to bpa# 202212229020. reroute fuel oil line from exterior facade to run through interior of garage. ref delta 13Details
revision to bpa# 202212229020. reroute fuel oil line from exterior facade to run through interior of garage. ref delta 13 | |
| May 23, 2024 | Completed final sign-off Nov 2024 | 1635 Divisadero St | Unger Construction Co | revision to bpa#202212229020. structural revision, revise concrete mix table, revise details for low concrete strength at housekeeping pads. revise anchorage details. ref delta 12Details
revision to bpa#202212229020. structural revision, revise concrete mix table, revise details for low concrete strength at housekeeping pads. revise anchorage details. ref delta 12 | |
| Apr 19, 2024 | Completed final sign-off Nov 2024 | 1635 Divisadero St | Unger Construction Co | revision to 202212229020. work on 2nd fl reduced to vacuum room only. on 5th fl, revision includes: signage, card readers, adding speakers, changing occupied patio to non-occupied roof. revised occupant load. electrical revision to lighting & other relevant revisionsDetails
revision to 202212229020. work on 2nd fl reduced to vacuum room only. on 5th fl, revision includes: signage, card readers, adding speakers, changing occupied patio to non-occupied roof. revised occupant load. electrical revision to lighting & other relevant revisions | |
| Nov 1, 2023 | Completed final sign-off Nov 2024 | 1635 Divisadero St | Unger Construction Co | revision to pa# 202212229020 r3, revise single line diagram to reflect removal of ground floor temporary generator connection point per ca elec code exemption from scope.Details
revision to pa# 202212229020 r3, revise single line diagram to reflect removal of ground floor temporary generator connection point per ca elec code exemption from scope. | |
| Aug 29, 2023 | In progress issued Jan 2024 | 2299 Post St | Contra Costa Electric Inc | upgrade (e) emergency electrical system to a type 1 system.Details
upgrade (e) emergency electrical system to a type 1 system. | |
| Jul 7, 2023 | Completed final sign-off Apr 2024 | 1635 Divisadero St | defered submittal 202212229020 for common use path of traval accessibility upgrades. install of truncated domes, restriping of (e) ada parking stall, re slope (e) ramp and retrofit public stair in complaince of current applicable codeDetails
defered submittal 202212229020 for common use path of traval accessibility upgrades. install of truncated domes, restriping of (e) ada parking stall, re slope (e) ramp and retrofit public stair in complaince of current applicable code | $5,000 | |
| Dec 22, 2022 | Completed final sign-off Nov 2024 | 1635 Divisadero St | Unger Construction Co | 5th fl ti scope is approx 7500 sf. includes 2 operating rooms, sterile processing dept and support spaces that include perioperative and recovery bays as well as adminstrative support. upgrade utilitys include replace emergency generator, air handling unit, med gas holding, replace vac pump 2nd flDetails
5th fl ti scope is approx 7500 sf. includes 2 operating rooms, sterile processing dept and support spaces that include perioperative and recovery bays as well as adminstrative support. upgrade utilitys include replace emergency generator, air handling unit, med gas holding, replace vac pump 2nd fl | $8,928,330 |
| Nov 10, 2022 | Completed final sign-off Feb 2025 | 1635 Divisadero St | Unger Construction Co | demo only per ab-017 minor demo work 2nd floor, demo 5th floorDetails
demo only per ab-017 minor demo work 2nd floor, demo 5th floor | $15,000 |
| Jan 18, 2012 | Completed final sign-off Apr 2012 | 1199 Bush St | H L S. Inc Dba Wolf General | suite 290 - remove (e) kitchen & convert to mdf room, install full height wall, new sheetrock, new ceiling (t-bar) new vct floor, hvac. main distribution frame. sprinkler & fire alarm revisions under seperate application.Details
suite 290 - remove (e) kitchen & convert to mdf room, install full height wall, new sheetrock, new ceiling (t-bar) new vct floor, hvac. main distribution frame. sprinkler & fire alarm revisions under seperate application. | $40,000 |