Mark Stevens
- Listed as
- architect
- Firm
- Architecture & Light
- Based in
- San Francisco
- On San Francisco permits
- Dec 2005 to Nov 2017
15 permits since 2000 (architect on 15 permits): 10 completed, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2017 | Completed final sign-off Dec 2017 | 2200 Market St | suite a: new seating layout of the new tenants. there is no construction, only furnishing replacement. existing exiting system to remain as is. maher naDetails
suite a: new seating layout of the new tenants. there is no construction, only furnishing replacement. existing exiting system to remain as is. maher na | ||
| Dec 16, 2016 | Completed final sign-off Sep 2017 | 333 Jefferson St | Smart Building Inc. | ste 5a: interior remodel of (e) restaurant within (e) envelop to provide for new dining facility to include (e) dining rooms, kitchen cookline modifications and remodel of exterior facade and relocation of entry doorDetails
ste 5a: interior remodel of (e) restaurant within (e) envelop to provide for new dining facility to include (e) dining rooms, kitchen cookline modifications and remodel of exterior facade and relocation of entry door | $205,000 |
| Jun 3, 2016 | Completed final sign-off Aug 2016 | 2323 Polk St | exterior facade renovations, ,door to be replaced. maher not reqDetails
exterior facade renovations, ,door to be replaced. maher not req | $50,000 | |
| Dec 23, 2014 | Completed final sign-off Dec 2014 | 2300 Chestnut St | P. L. Annuzzi, Inc. | revision to 201411121229 & 200910169131 - revised ramp landing as hardship. compliance with maher ordinance 155-13 not required.Details
revision to 201411121229 & 200910169131 - revised ramp landing as hardship. compliance with maher ordinance 155-13 not required. | |
| Mar 2, 2012 | Never finaled filed Mar 2012, never issued | 350 Powell St | P. L. Annuzzi, Inc. | revision to pa# 2010-0811-8561-changes marked in delta 3, revision includes new louvretel trellis structure & relocattion of windscreen on top of (e) surrounding curbDetails
revision to pa# 2010-0811-8561-changes marked in delta 3, revision includes new louvretel trellis structure & relocattion of windscreen on top of (e) surrounding curb | $10,000 |
| Dec 19, 2011 | Never finaled issued Mar 2013, no final | 1 Market St | Terra Nova Industries | install (1) non-electric, projecting, double-faced, non-illuminated, new banner sign.Details
install (1) non-electric, projecting, double-faced, non-illuminated, new banner sign. | $3,000 |
| Dec 19, 2011 | Expired or cancelled cancelled May 2012 | 1 Market St | Terra Nova Industries | install (2) internally illuminated walls signs.Details
install (2) internally illuminated walls signs. | $5,000 |
| Dec 19, 2011 | Never finaled issued Mar 2013, no final | 1 Market St | Terra Nova Industries | install (8) glass/door vinyl, non-electric, non-illuminated new lettering signs.Details
install (8) glass/door vinyl, non-electric, non-illuminated new lettering signs. | $500 |
| Dec 16, 2011 | Completed final sign-off Jan 2013 | 1 Market St | Terra Nova Industries | interior tenant improvement for wine tasting and wine/art retail space. mep systems are design/build and permitted separate fire sprinkler & fire alarm remain as existing. includes lighting t-24. signs under separate permit.Details
interior tenant improvement for wine tasting and wine/art retail space. mep systems are design/build and permitted separate fire sprinkler & fire alarm remain as existing. includes lighting t-24. signs under separate permit. | $114,800 |
| Aug 24, 2010 | Completed final sign-off Jan 2011 | 301 Van Ness Av | L F Country Construction Inc | remodel and renovation of existing tenant concessions for accessibility compliance and aesthetic upgrades.selective demolition, modification of existing improvements and new construction.work includes casework fixtures, electrical&lighting. electrical work by subcontractors under separate permits.Details
remodel and renovation of existing tenant concessions for accessibility compliance and aesthetic upgrades.selective demolition, modification of existing improvements and new construction.work includes casework fixtures, electrical&lighting. electrical work by subcontractors under separate permits. | $25,000 |
| May 10, 2006 | Completed final sign-off Dec 2006 | 845 Market St | pasta moto, fe 6. cti-1, bart level, el, me, ls, sp.Details
pasta moto, fe 6. cti-1, bart level, el, me, ls, sp. | $150,000 | |
| May 10, 2006 | Completed final sign-off Dec 2006 | 845 Market St | pasta moto, space# fe-6. cti-2, bart level, el, me.Details
pasta moto, space# fe-6. cti-2, bart level, el, me. | $50,000 | |
| Feb 10, 2006 | Completed final sign-off May 2007 | 845 Market St | cti-1, 3rd floor, space #331, el, me, ls, sp. tenant fit up. new storefront, new electrical, new mechanical, alter plumbing.Details
cti-1, 3rd floor, space #331, el, me, ls, sp. tenant fit up. new storefront, new electrical, new mechanical, alter plumbing. | $144,125 | |
| Dec 16, 2005 | Completed final sign-off Jul 2006 | 601 Union St | Terra Nova Industries | electrical, plumbing, mechanical - it equip. seating - painting, flooring, ceiling, framing, drywall.Details
electrical, plumbing, mechanical - it equip. seating - painting, flooring, ceiling, framing, drywall. | $940,000 |
| Dec 14, 2005 | Never finaled issued Dec 2005, no final | 601 Union St | Terra Nova Industries | demo non-bearing walls, light, restroom. duct work floor tile. ceiling tile.Details
demo non-bearing walls, light, restroom. duct work floor tile. ceiling tile. | $10,000 |