Permit GraphShortlistSan Francisco building permits since 2000

Block 3788, lot 041

665 03rd St

City’s use
Commercial Office
Built
1916
Stories
5
Rooms
9 bathrooms
Building
134,445 sq ft
Lot
24,320 sq ft
Zoning
SLI
Construction type
B

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

61 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 25, 2025Completed
final sign-off Sep 2025
665 03rd StMetropolitan Electrical Constructionat&t modification: remove e) 9 antennas on slads, relocate n) steell framesto parapet wall, r/r/ 9 rru's, r/r e) panel w/ n) 200a ppc, rmove 4 e) cabinets, install n) vertiv 7100 scpp w/ 9 rectifiers & 8 converters, remove 3 strings, dela 145 ah batts. install 4 strings 190 ah, dc12 & 6648
Details
Permit
202504255233
Status
complete
Filed
Apr 25, 2025
Permit issued
Jun 16, 2025
Final sign-off
Sep 9, 2025
Declared cost
$50,000
Address
665 03rd St

at&t modification: remove e) 9 antennas on slads, relocate n) steell framesto parapet wall, r/r/ 9 rru's, r/r e) panel w/ n) 200a ppc, rmove 4 e) cabinets, install n) vertiv 7100 scpp w/ 9 rectifiers & 8 converters, remove 3 strings, dela 145 ah batts. install 4 strings 190 ah, dc12 & 6648

Open the permit page

$50,000
Mar 22, 2024Completed
final sign-off Apr 2024
665 03rd StTeam Commercial Construction Inc.revision pa# 202206247101 existing hvac system and all associated support to remain and in operation
Details
Permit
202403228399
Status
complete
Filed
Mar 22, 2024
Permit issued
Mar 22, 2024
Final sign-off
Apr 3, 2024
Address
665 03rd St

revision pa# 202206247101 existing hvac system and all associated support to remain and in operation

Open the permit page

Jan 12, 2024Completed
final sign-off Jan 2024
665 03rd StTeam Commercial Construction Inc.revision to pa 202206247101. change in direction of the new concrete ramp inside the suite.
Details
Permit
202401123916
Status
complete
Filed
Jan 12, 2024
Permit issued
Jan 12, 2024
Final sign-off
Jan 17, 2024
Address
665 03rd St

revision to pa 202206247101. change in direction of the new concrete ramp inside the suite.

Open the permit page

Jun 24, 2022Completed
final sign-off Apr 2024
665 03rd StTeam Commercial Construction Inc.complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switches, a.c. units systems, etc.. the end state of the vacated suite shall be a white shell configuration.
Details
Permit
202206247101
Status
complete
Filed
Jun 24, 2022
Permit issued
Jun 5, 2023
Final sign-off
Apr 3, 2024
Declared cost
$550,000
Address
665 03rd St

complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switches, a.c. units systems, etc.. the end state of the vacated suite shall be a white shell configuration.

Open the permit page

$550,000
Jun 18, 2021Expired or cancelled
withdrawn Apr 2025
665 03rd Stno antenna work. equipment room:remove(3)(e) at&t 206 rbs cabinets,remove(3)(e)at&t rrus-12b2,remove(24)(e) aty&t batteries.install (3)(n)at&trrus-4478 b5,install(3)(n) at&t rrus-4415 b25,install(1)(n)at&t xmu,install(1)(n)at&t vertiv indoor battery rack,install(12)(n) at&t gs ply 12v160ft batteries
Details
Permit
202106182780
Status
withdrawn
Filed
Jun 18, 2021
Declared cost
$25,000
Address
665 03rd St

no antenna work. equipment room:remove(3)(e) at&t 206 rbs cabinets,remove(3)(e)at&t rrus-12b2,remove(24)(e) aty&t batteries.install (3)(n)at&trrus-4478 b5,install(3)(n) at&t rrus-4415 b25,install(1)(n)at&t xmu,install(1)(n)at&t vertiv indoor battery rack,install(12)(n) at&t gs ply 12v160ft batteries

Open the permit page

$25,000
Mar 5, 2021Completed
final sign-off Jun 2021
665 03rd StTeam Commercial Construction Inc.decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project.
Details
Permit
202103055952
Status
complete
Filed
Mar 5, 2021
Permit issued
May 6, 2021
Final sign-off
Jun 25, 2021
Declared cost
$80,000
Address
665 03rd St

decommission of rally's offices, includes infilling openings in the original tenant demising partitions thus returning the 3rd fl to 3 independent suites. removal & slab infill of interconnecting communication stair between level 2 & 3 added by rally health in previous tenant improvement project.

Open the permit page

$80,000
Sep 26, 2020Never finaled
issued Oct 2020, no final
665 03rd StRed Hawk Fire & Security Ca Llcvoluntary notification upgrade to (e) building fire alarm system. add (7) power supplies, (6) smoke detectors, (103) strobes only, (197) horn/strobes
Details
Permit
202009265128
Status
issued
Filed
Sep 26, 2020
Permit issued
Oct 9, 2020
Declared cost
$110,000
Address
665 03rd St

voluntary notification upgrade to (e) building fire alarm system. add (7) power supplies, (6) smoke detectors, (103) strobes only, (197) horn/strobes

Open the permit page

$110,000
Mar 26, 2019Never finaled
issued Mar 2019, no final
665 03rd StRed Hawk Fire & Security Ca Llcadd 1 duct det at (e) fan. add 1 relay for fan shut down
Details
Permit
201903266275
Status
issued
Filed
Mar 26, 2019
Permit issued
Mar 26, 2019
Declared cost
$2,500
Address
665 03rd St

add 1 duct det at (e) fan. add 1 relay for fan shut down

Open the permit page

$2,500
Mar 15, 2019Completed
final sign-off Apr 2019
665 03rd StMain Electric Inc.tenant improvement: new lighting & office furniture & title 24. 2nd fl. ref pa #201901039524.
Details
Permit
201903155425
Status
complete
Filed
Mar 15, 2019
Permit issued
Mar 15, 2019
Final sign-off
Apr 15, 2019
Declared cost
$40,000
Address
665 03rd St

tenant improvement: new lighting & office furniture & title 24. 2nd fl. ref pa #201901039524.

Open the permit page

$40,000
Feb 15, 2019Completed
final sign-off Mar 2019
665 03rd StRed Hawk Fire & Security Ca Llcadd/relocate sprinklers in area of work to provide adequate fire sprinkler coverage to new tenant improvement walls and ceiling layout on 2nd fl ref 201901039524.
Details
Permit
201902153026
Status
complete
Filed
Feb 15, 2019
Permit issued
Feb 15, 2019
Final sign-off
Mar 21, 2019
Declared cost
$8,500
Address
665 03rd St

add/relocate sprinklers in area of work to provide adequate fire sprinkler coverage to new tenant improvement walls and ceiling layout on 2nd fl ref 201901039524.

Open the permit page

$8,500
Jan 3, 2019Completed
final sign-off Apr 2019
665 03rd StTeam Commercial Construction Inc.2nd fl - interior tenanat improvement of partial floor.
Details
Permit
201901039524
Status
complete
Filed
Jan 3, 2019
Permit issued
Feb 6, 2019
Final sign-off
Apr 25, 2019
Declared cost
$83,650
Address
665 03rd St

2nd fl - interior tenanat improvement of partial floor.

Open the permit page

$83,650
Nov 16, 2018Never finaled
issued Nov 2018, no final
665 03rd StRed Hawk Fire & Security Ca Llcremove/replace 3/4" lines feed last head on line. relocate ssu's as required. install new branch line retraints throughout. n/a for maher
Details
Permit
201811166094
Status
issued
Filed
Nov 16, 2018
Permit issued
Nov 16, 2018
Declared cost
$18,000
Address
665 03rd St

remove/replace 3/4" lines feed last head on line. relocate ssu's as required. install new branch line retraints throughout. n/a for maher

Open the permit page

$18,000
Nov 16, 2018Never finaled
issued Nov 2018, no final
665 03rd StMain Electric Inc.electrical title 24, lighting
Details
Permit
201811166132
Status
issued
Filed
Nov 16, 2018
Permit issued
Nov 20, 2018
Declared cost
$140,000
Address
665 03rd St

electrical title 24, lighting

Open the permit page

$140,000
Oct 22, 2018Completed
final sign-off Apr 2019
665 03rd StTeam Commercial Construction Inc.inter ti improvement of partial (e) 3rd floor
Details
Permit
201810223782
Status
complete
Filed
Oct 22, 2018
Permit issued
Nov 2, 2018
Final sign-off
Apr 25, 2019
Declared cost
$83,650
Address
665 03rd St

inter ti improvement of partial (e) 3rd floor

Open the permit page

$83,650
May 22, 2018Completed
final sign-off May 2018
665 03rd StRed Hawk Fire & Security Ca Llcshow updated as built address changes. reflect conventional duct detector on 5th floor. n/a for maher. ref app#201805038142
Details
Permit
201805229746
Status
complete
Filed
May 22, 2018
Permit issued
May 22, 2018
Final sign-off
May 29, 2018
Address
665 03rd St

show updated as built address changes. reflect conventional duct detector on 5th floor. n/a for maher. ref app#201805038142

Open the permit page

May 3, 2018Completed
final sign-off May 2018
665 03rd StRed Hawk Fire & Security Ca Llcfire alarm revision show add elevator upgrade items as to scope clouded on floor plan
Details
Permit
201805038142
Status
complete
Filed
May 3, 2018
Permit issued
May 4, 2018
Final sign-off
May 29, 2018
Address
665 03rd St

fire alarm revision show add elevator upgrade items as to scope clouded on floor plan

Open the permit page

Apr 9, 2018Completed
final sign-off Apr 2018
665 03rd StRed Hawk Fire & Security Ca Llcremoval of 1 sprinkler head ;pcated at the top of the elevator shaft maher na
Details
Permit
201804095776
Status
complete
Filed
Apr 9, 2018
Permit issued
Apr 9, 2018
Final sign-off
Apr 24, 2018
Declared cost
$1,000
Address
665 03rd St

removal of 1 sprinkler head ;pcated at the top of the elevator shaft maher na

Open the permit page

$1,000
Mar 20, 2018Completed
final sign-off May 2018
665 03rd StRed Hawk Fire & Security Ca Llcemergency panel replacement and elevator modernization. n/a for maher
Details
Permit
201803204110
Status
complete
Filed
Mar 20, 2018
Permit issued
Mar 21, 2018
Final sign-off
May 29, 2018
Declared cost
$15,000
Address
665 03rd St

emergency panel replacement and elevator modernization. n/a for maher

Open the permit page

$15,000
May 1, 2017Completed
final sign-off May 2017
665 03rd StTeam Commercial Construction Inc.revision to 201602179851. remove 3rd floor shower from scope. revise 2nd flr new bathrooms. maher na
Details
Permit
201705015360
Status
complete
Filed
May 1, 2017
Permit issued
May 2, 2017
Final sign-off
May 5, 2017
Address
665 03rd St

revision to 201602179851. remove 3rd floor shower from scope. revise 2nd flr new bathrooms. maher na

Open the permit page

Mar 23, 2017Completed
final sign-off Aug 2017
665 03rd StTeam Commercial Construction Inc.build new fence on both sides of ally to keep homeless out. both sides will have panic bars. n/a for maher
Details
Permit
201703232174
Status
complete
Filed
Mar 23, 2017
Permit issued
Jul 24, 2017
Final sign-off
Aug 14, 2017
Declared cost
$12,000
Address
665 03rd St

build new fence on both sides of ally to keep homeless out. both sides will have panic bars. n/a for maher

Open the permit page

$12,000
Feb 23, 2017Completed
final sign-off Mar 2017
665 03rd StLincoln Air Conditioningto obtain final inspection for work approved under pa#2015-0626-0006. all work is complete.
Details
Permit
201702239953
Status
complete
Filed
Feb 23, 2017
Permit issued
Feb 23, 2017
Final sign-off
Mar 16, 2017
Address
665 03rd St

to obtain final inspection for work approved under pa#2015-0626-0006. all work is complete.

Open the permit page

Feb 9, 2017Completed
final sign-off May 2017
665 03rd StColevan Electric Inc3rd flr, suite 333: electrical receptacles title 24 lighting and power maher na. ref t.i. 201603253143.
Details
Permit
201702099099
Status
complete
Filed
Feb 9, 2017
Permit issued
Feb 27, 2017
Final sign-off
May 10, 2017
Address
665 03rd St

3rd flr, suite 333: electrical receptacles title 24 lighting and power maher na. ref t.i. 201603253143.

Open the permit page

Jan 17, 2017Completed
final sign-off Jan 2017
665 03rd StTeam Commercial Construction Inc.revision to pa# 201603021005, install exhaust system for new bathrooms. tie to (e) bldg exhaust
Details
Permit
201701177243
Status
complete
Filed
Jan 17, 2017
Permit issued
Jan 20, 2017
Final sign-off
Jan 25, 2017
Declared cost
$2,100
Address
665 03rd St

revision to pa# 201603021005, install exhaust system for new bathrooms. tie to (e) bldg exhaust

Open the permit page

$2,100
Aug 5, 2016Completed
final sign-off May 2017
665 03rd StTeam Commercial Construction Inc.revision: submit shop drawings for (e) permit stairs 201603253143 for stairs between 2nd & 3rd floors. maher na
Details
Permit
201608054375
Status
complete
Filed
Aug 5, 2016
Permit issued
Aug 5, 2016
Final sign-off
May 5, 2017
Address
665 03rd St

revision: submit shop drawings for (e) permit stairs 201603253143 for stairs between 2nd & 3rd floors. maher na

Open the permit page

Jun 17, 2016Never finaled
issued Jun 2016, no final
665 03rd StAegis Enterprises Inc2nd floor office, unit 200: add 8, relocate 15 upright & add 3 pendent fire sprinklers to accomodate new ti changes. ref pa 2016 0217 9851 maher na
Details
Permit
201606170221
Status
issued
Filed
Jun 17, 2016
Permit issued
Jun 17, 2016
Declared cost
$5,200
Address
665 03rd St

2nd floor office, unit 200: add 8, relocate 15 upright & add 3 pendent fire sprinklers to accomodate new ti changes. ref pa 2016 0217 9851 maher na

Open the permit page

$5,200
Mar 25, 2016Completed
final sign-off May 2017
665 03rd StTeam Commercial Construction Inc.2nd floor ti including new connecting stair to 3rd floor
Details
Permit
201603253143
Status
complete
Filed
Mar 25, 2016
Permit issued
Mar 30, 2016
Final sign-off
May 10, 2017
Declared cost
$72,000
Address
665 03rd St

2nd floor ti including new connecting stair to 3rd floor

Open the permit page

$72,000
Mar 2, 2016Completed
final sign-off Jan 2017
665 03rd StTeam Commercial Construction Inc.revision to pa 2016-0201-8516, adding one more shower to existing basement level. maher na
Details
Permit
201603021005
Status
complete
Filed
Mar 2, 2016
Permit issued
Nov 22, 2016
Final sign-off
Jan 31, 2017
Declared cost
$2,200
Address
665 03rd St

revision to pa 2016-0201-8516, adding one more shower to existing basement level. maher na

Open the permit page

$2,200
Feb 17, 2016Completed
final sign-off May 2017
665 03rd StTeam Commercial Construction Inc.2nd fl tenant improvement, new ada restrooms, office/phone rooms. minor improvements to 3rd fl including ada shower
Details
Permit
201602179851
Status
complete
Filed
Feb 17, 2016
Permit issued
Apr 1, 2016
Final sign-off
May 5, 2017
Declared cost
$72,000
Address
665 03rd St

2nd fl tenant improvement, new ada restrooms, office/phone rooms. minor improvements to 3rd fl including ada shower

Open the permit page

$72,000
Feb 1, 2016Completed
final sign-off Jan 2017
665 03rd StTeam Commercial Construction Inc.adding 3 showers at existing basement level - interior wall additions and cleaned up interior finishes as required. mep under separate permit. not visible from street
Details
Permit
201602018516
Status
complete
Filed
Feb 1, 2016
Permit issued
Feb 19, 2016
Final sign-off
Jan 31, 2017
Declared cost
$15,830
Address
665 03rd St

adding 3 showers at existing basement level - interior wall additions and cleaned up interior finishes as required. mep under separate permit. not visible from street

Open the permit page

$15,830
Jun 26, 2015Completed
final sign-off May 2017
665 03rd StLincoln Air Conditioninginstall new a.c. unit above bathrooms and install duct work. ref app201505297519. n/a for maher.
Details
Permit
201506260006
Status
complete
Filed
Jun 26, 2015
Permit issued
Jun 26, 2015
Final sign-off
May 5, 2017
Declared cost
$20,500
Address
665 03rd St

install new a.c. unit above bathrooms and install duct work. ref app201505297519. n/a for maher.

Open the permit page

$20,500
Jun 10, 2015Completed
final sign-off Aug 2015
665 03rd StAquamatic Fire Protectionunit #333: revise sprinkler system for new tenant floor plan, 2 new and 3 relocate, 5 sprinklers (t.i. 201504153715 and 201505297519); maher n/a new bracing
Details
Permit
201506108631
Status
complete
Filed
Jun 10, 2015
Permit issued
Jun 10, 2015
Final sign-off
Aug 12, 2015
Declared cost
$1,800
Address
665 03rd St

unit #333: revise sprinkler system for new tenant floor plan, 2 new and 3 relocate, 5 sprinklers (t.i. 201504153715 and 201505297519); maher n/a new bracing

Open the permit page

$1,800
May 29, 2015Completed
final sign-off May 2017
665 03rd StTeam Commercial Construction Inc.3rd flr/suite 333: revision to pa 2015 0415 3715- addition of 2 offices. maher na
Details
Permit
201505297519
Status
complete
Filed
May 29, 2015
Permit issued
Jun 2, 2015
Final sign-off
May 10, 2017
Declared cost
$12,500
Address
665 03rd St

3rd flr/suite 333: revision to pa 2015 0415 3715- addition of 2 offices. maher na

Open the permit page

$12,500
Apr 15, 2015Completed
final sign-off May 2017
665 03rd St3rd floor sutie #333: interior t.i. includes interior walls additions and demo/clean up interior finishes as required. mep under separate permit. no change of use. not visisble from street. maher n/a.
Details
Permit
201504153715
Status
complete
Filed
Apr 15, 2015
Permit issued
Jun 2, 2015
Final sign-off
May 10, 2017
Declared cost
$72,000
Address
665 03rd St

3rd floor sutie #333: interior t.i. includes interior walls additions and demo/clean up interior finishes as required. mep under separate permit. no change of use. not visisble from street. maher n/a.

Open the permit page

$72,000
Mar 9, 2015Completed
final sign-off Apr 2015
665 03rd StTeam Commercial Construction Inc.extend 1 rigid duct 15 feet, install 2 exhaust fans. ref #201408153952. compliance with maher ordinance no 155-13 not required.
Details
Permit
201503090232
Status
complete
Filed
Mar 9, 2015
Permit issued
Mar 19, 2015
Final sign-off
Apr 2, 2015
Declared cost
$2,200
Address
665 03rd St

extend 1 rigid duct 15 feet, install 2 exhaust fans. ref #201408153952. compliance with maher ordinance no 155-13 not required.

Open the permit page

$2,200
Oct 3, 2014Never finaled
issued Oct 2014, no final
665 03rd StAquamatic Fire Protectionsuite 320: relocate 11 fire sprinklers. add 10 fire sprinkler, plug 16 fire sprinklers. install earthquake bracing and branch line restraints in area of work ref 201408153952
Details
Permit
201410038022
Status
issued
Filed
Oct 3, 2014
Permit issued
Oct 3, 2014
Declared cost
$9,700
Address
665 03rd St

suite 320: relocate 11 fire sprinklers. add 10 fire sprinkler, plug 16 fire sprinklers. install earthquake bracing and branch line restraints in area of work ref 201408153952

Open the permit page

$9,700
Aug 15, 2014Completed
final sign-off Apr 2015
665 03rd StTeam Commercial Construction Inc.3rd flr: interior tenant improvements, ste 320, including ada bathroom upgrades, interior wall additions, and cleaned up interior finishes. maher n/a
Details
Permit
201408153952
Status
complete
Filed
Aug 15, 2014
Permit issued
Sep 2, 2014
Final sign-off
Apr 2, 2015
Declared cost
$172,000
Address
665 03rd St

3rd flr: interior tenant improvements, ste 320, including ada bathroom upgrades, interior wall additions, and cleaned up interior finishes. maher n/a

Open the permit page

$172,000
May 30, 2014Completed
final sign-off Sep 2016
665 03rd StTeam Commercial Construction Inc.replacement of ground floor window sash along 3rd st elevation. replace 2 entry doors. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201405307063
Status
complete
Filed
May 30, 2014
Permit issued
Apr 9, 2015
Final sign-off
Sep 7, 2016
Declared cost
$300,000
Address
665 03rd St

replacement of ground floor window sash along 3rd st elevation. replace 2 entry doors. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$300,000
May 20, 2014Expired or cancelled
withdrawn Apr 2015
665 03rd Stmodification to an (e) facility consisting of adding 3 (n) rrus with a-2 units attached and installing 1 (n) dvs-41 units in an (e) environment rack
Details
Permit
201405206288
Status
withdrawn
Filed
May 20, 2014
Declared cost
$6,000
Address
665 03rd St

modification to an (e) facility consisting of adding 3 (n) rrus with a-2 units attached and installing 1 (n) dvs-41 units in an (e) environment rack

Open the permit page

$6,000
Nov 22, 2013Completed
final sign-off Mar 2014
665 03rd St(compli.w/maher ord.- extended ordin.#155-13 not required.excavation less than 50 cu. yd.)no const.proposed -for record purposes only-legalize prior change of use fr.lightmanufacturing to office for a total approx.123,700 gsf of legal office approx 3,800 gsf to remain in lightmanufacturing use -bldg
Details
Permit
201311222636
Status
complete
Filed
Nov 22, 2013
Permit issued
Dec 31, 2013
Final sign-off
Mar 11, 2014
Address
665 03rd St

(compli.w/maher ord.- extended ordin.#155-13 not required.excavation less than 50 cu. yd.)no const.proposed -for record purposes only-legalize prior change of use fr.lightmanufacturing to office for a total approx.123,700 gsf of legal office approx 3,800 gsf to remain in lightmanufacturing use -bldg

Open the permit page

Jun 10, 2013Never finaled
issued Jun 2013, no final
665 03rd Ststreet space permit
Details
Permit
M400547
Status
issued
Filed
Jun 10, 2013
Permit issued
Jun 10, 2013
Address
665 03rd St

street space permit

Open the permit page

Apr 24, 2013Never finaled
issued Apr 2013, no final
665 03rd Ststreet space
Details
Permit
M388107
Status
issued
Filed
Apr 24, 2013
Permit issued
Apr 24, 2013
Address
665 03rd St

street space

Open the permit page

Mar 28, 2012Expired or cancelled
cancelled Jan 2026
665 03rd Stinstallation of wi-fi connectors (2) and associated cabling and exterior equipment cabinets (2) on roof.
Details
Permit
201203287025
Status
cancelled
Filed
Mar 28, 2012
Declared cost
$17,000
Address
665 03rd St

installation of wi-fi connectors (2) and associated cabling and exterior equipment cabinets (2) on roof.

Open the permit page

$17,000
Mar 12, 2010Expired or cancelled
cancelled Jun 2024
665 03rd StBroken Arrow Communications Incadding new 3206 rbs cabinet, removing & replacing 3 (e) antennas, 3 new antennas with new ret's to antennas ret powered by low voltage signed thru (e) coax cable, paint to match (e) building. adding 3 new dtma's, 6 new tma's, 12 new rvng of coax cable inside new 18" cable tray stacked on (e) cable t
Details
Permit
201003128162
Status
cancelled
Filed
Mar 12, 2010
Permit issued
Mar 29, 2010
Declared cost
$25,000
Address
665 03rd St

adding new 3206 rbs cabinet, removing & replacing 3 (e) antennas, 3 new antennas with new ret's to antennas ret powered by low voltage signed thru (e) coax cable, paint to match (e) building. adding 3 new dtma's, 6 new tma's, 12 new rvng of coax cable inside new 18" cable tray stacked on (e) cable t

Open the permit page

$25,000
Dec 23, 2008Completed
final sign-off Feb 2010
665 03rd StTransceive Communications Inc.remove 3106 cabinet, replace with micro cabinet inside existing room (tenant improvement) additionally add (3) remote electronic units (ret) which are small and added to base of the antenna. no visual change, as new units are below a screen wall.
Details
Permit
200812239114
Status
complete
Filed
Dec 23, 2008
Permit issued
Dec 10, 2009
Final sign-off
Feb 4, 2010
Declared cost
$5,000
Address
665 03rd St

remove 3106 cabinet, replace with micro cabinet inside existing room (tenant improvement) additionally add (3) remote electronic units (ret) which are small and added to base of the antenna. no visual change, as new units are below a screen wall.

Open the permit page

$5,000
Aug 1, 2008Expired or cancelled
cancelled Jan 2026
665 03rd StLevel 8 Construction Incadd mechanical plans to original plans hood with ducting for kitchen area in restaurant. all (e) he tied into (e) system
Details
Permit
200808018248
Status
cancelled
Filed
Aug 1, 2008
Declared cost
$20,000
Address
665 03rd St

add mechanical plans to original plans hood with ducting for kitchen area in restaurant. all (e) he tied into (e) system

Open the permit page

$20,000
Dec 28, 2005Expired or cancelled
expired Aug 2007
665 03rd StBlackford Constructionrenew permit ref pa no 200401154104 & 200503298689 & 200306207318 for final inspections only
Details
Permit
200512281185
Status
expired
Filed
Dec 28, 2005
Permit issued
Dec 28, 2005
Address
665 03rd St

renew permit ref pa no 200401154104 & 200503298689 & 200306207318 for final inspections only

Open the permit page

Dec 28, 2005Never finaled
issued Dec 2005, no final
665 03rd StBlackford Constructionrenew pa no 200307119247 for final insp on fire sprinkler on 5th floor t.i.
Details
Permit
200512281188
Status
issued
Filed
Dec 28, 2005
Permit issued
Dec 28, 2005
Address
665 03rd St

renew pa no 200307119247 for final insp on fire sprinkler on 5th floor t.i.

Open the permit page

Mar 29, 2005Expired or cancelled
expired Aug 2007
665 03rd StBlackford Constructionrenew app #200401154104/200306207318
Details
Permit
200503298689
Status
expired
Filed
Mar 29, 2005
Permit issued
Mar 29, 2005
Address
665 03rd St

renew app #200401154104/200306207318

Open the permit page

Mar 19, 2004Expired or cancelled
expired Dec 2004
665 03rd StAquamatic Fire Protectionremove (e) dry pipe valve & convert preaction system back to wet pipe sprinkler system. work is on 1
Details
Permit
200403199131
Status
expired
Filed
Mar 19, 2004
Permit issued
Mar 19, 2004
Declared cost
$750
Address
665 03rd St

remove (e) dry pipe valve & convert preaction system back to wet pipe sprinkler system. work is on 1

Open the permit page

$750
Mar 5, 2004Never finaled
issued Mar 2004, no final
665 03rd Stsidewalk repair only
Details
Permit
M26597
Status
issued
Filed
Mar 5, 2004
Permit issued
Mar 5, 2004
Address
665 03rd St

sidewalk repair only

Open the permit page

Jan 15, 2004Expired or cancelled
expired Dec 2004
665 03rd Strev.appl#200306207318 indicated visual alarms provided is not required and will not be provided
Details
Permit
200401154104
Status
expired
Filed
Jan 15, 2004
Permit issued
Jan 15, 2004
Address
665 03rd St

rev.appl#200306207318 indicated visual alarms provided is not required and will not be provided

Open the permit page

Jan 12, 2004Completed
final sign-off Jun 2004
665 03rd StAquamatic Fire Protectionadd 6 upright sprinklers for coverage to new full height walls, add 2 pennant sprinklers under new b
Details
Permit
200401123792
Status
complete
Filed
Jan 12, 2004
Permit issued
Jan 12, 2004
Final sign-off
Jun 1, 2004
Declared cost
$2,500
Address
665 03rd St

add 6 upright sprinklers for coverage to new full height walls, add 2 pennant sprinklers under new b

Open the permit page

$2,500
Nov 4, 2003Completed
final sign-off Jun 2004
665 03rd St#420- single t.i. to (e) 4/fl office space. install new non-bearing partitions,provide new separate
Details
Permit
200311049387
Status
complete
Filed
Nov 4, 2003
Permit issued
Nov 4, 2003
Final sign-off
Jun 1, 2004
Declared cost
$95,000
Address
665 03rd St

#420- single t.i. to (e) 4/fl office space. install new non-bearing partitions,provide new separate

Open the permit page

$95,000
Jul 11, 2003Expired or cancelled
expired Sep 2005
665 03rd StSimplex Grinnelladd 3, relocate 3, and plug 3 sprinkler heads at 5th floor only
Details
Permit
200307119247
Status
expired
Filed
Jul 11, 2003
Permit issued
Jul 11, 2003
Declared cost
$2,480
Address
665 03rd St

add 3, relocate 3, and plug 3 sprinkler heads at 5th floor only

Open the permit page

$2,480
Jun 20, 2003Expired or cancelled
expired Dec 2004
665 03rd Stoti 1-5th floor, ltg, mech, l/s, spr
Details
Permit
200306207318
Status
expired
Filed
Jun 20, 2003
Permit issued
Jul 31, 2003
Declared cost
$87,000
Address
665 03rd St

oti 1-5th floor, ltg, mech, l/s, spr

Open the permit page

$87,000
Jun 25, 2002Completed
final sign-off Jul 2002
665 03rd StSimplex Grinnell*** See 802591****fire alarm in basement
Details
Permit
200206259895
Status
complete
Filed
Jun 25, 2002
Permit issued
Jun 25, 2002
Final sign-off
Jul 24, 2002
Declared cost
$11,000
Address
665 03rd St

fire alarm in basement

Open the permit page

$11,000
Sep 7, 2001Completed
final sign-off Jul 2002
665 03rd StSimplex Grinnell*** See 802591****modify (e) pre-action detection system @ basement only
Details
Permit
200109077787
Status
complete
Filed
Sep 7, 2001
Permit issued
Sep 7, 2001
Final sign-off
Jul 24, 2002
Declared cost
$9,000
Address
665 03rd St

modify (e) pre-action detection system @ basement only

Open the permit page

$9,000
Jun 8, 2001Expired or cancelled
expired Mar 2002
665 03rd StSimplex Grinnell*** See 802591****esten pre-action system throughout
Details
Permit
200106081136
Status
expired
Filed
Jun 8, 2001
Permit issued
Sep 14, 2001
Declared cost
$9,500
Address
665 03rd St

esten pre-action system throughout

Open the permit page

$9,500
May 17, 2001Completed
final sign-off Jul 2002
665 03rd StDalzell Corporationinstallfire wall aroung tankamd pump and door
Details
Permit
200105179457
Status
complete
Filed
May 17, 2001
Permit issued
May 17, 2001
Final sign-off
Jul 24, 2002
Declared cost
$3,000
Address
665 03rd St

installfire wall aroung tankamd pump and door

Open the permit page

$3,000
Mar 16, 2001Expired or cancelled
expired Jul 2002
665 03rd StTurner Construction Codemo (e) walls & doors indicated, new 1 hr. rated partitions, new doors, new partial height window
Details
Permit
200103164466
Status
expired
Filed
Mar 16, 2001
Permit issued
Apr 19, 2001
Declared cost
$64,000
Address
665 03rd St

demo (e) walls & doors indicated, new 1 hr. rated partitions, new doors, new partial height window

Open the permit page

$64,000
Apr 29, 2000Expired or cancelled
expired May 2001
665 03rd Stnew walls new doorsdemo of existing walls no struct add restrms new lighting new hvac
Details
Permit
200004298628
Status
expired
Filed
Apr 29, 2000
Permit issued
May 13, 2000
Declared cost
$243,642
Address
665 03rd St

new walls new doorsdemo of existing walls no struct add restrms new lighting new hvac

Open the permit page

$243,642

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Team Commercial Construction Inc. (18), Red Hawk Fire & Security Ca Llc (8), Aquamatic Fire Protection (4), Blackford Construction (3), Simplex Grinnell*** See 802591**** (3), Lincoln Air Conditioning (2), Main Electric Inc. (2), Aegis Enterprises Inc, Broken Arrow Communications Inc, Colevan Electric Inc, Dalzell Corporation, Level 8 Construction Inc, Metropolitan Electrical Construction, Simplex Grinnell, Transceive Communications Inc., Turner Construction Co
Architects
Albert Costa (6), Dutch Wickes (3), Denis Henmi, Naomi Miroglio, Seung Oh
Engineers
Stephen Shafeer (2), Babak Vaziri, John M. Anderson Jr., Jose Herrera, Leonard Rose
Designers
Steven Terry

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.