Dutch Wickes
- License
- 29461
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect
- On San Francisco permits
- Jun 2022 to Mar 2024
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Team Commercial Construction Inc. (3)
- Engineers
- Jose Herrera
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 22, 2024 | Completed final sign-off Apr 2024 | 665 03rd St | Team Commercial Construction Inc. | revision pa# 202206247101 existing hvac system and all associated support to remain and in operationDetails
revision pa# 202206247101 existing hvac system and all associated support to remain and in operation | |
| Jan 12, 2024 | Completed final sign-off Jan 2024 | 665 03rd St | Team Commercial Construction Inc. | revision to pa 202206247101. change in direction of the new concrete ramp inside the suite.Details
revision to pa 202206247101. change in direction of the new concrete ramp inside the suite. | |
| Jun 24, 2022 | Completed final sign-off Apr 2024 | 665 03rd St | Team Commercial Construction Inc. | complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switches, a.c. units systems, etc.. the end state of the vacated suite shall be a white shell configuration.Details
complete suite vacation of an (e) telecommunication equipment faciliting in basement, removel of switch and transmission equipment, support equipment, fuel tank, emergency generator, transfer switches, a.c. units systems, etc.. the end state of the vacated suite shall be a white shell configuration. | $550,000 |