Back to bathroom remodel contractors
Gotham Bay Construction
- Based in
- Emeryville
- On San Francisco permits
- Apr 2001 to Aug 2026
- Last 24 months
- 2 permits filed
83 permits since 2000: 62 completed, 2 in progress, 7 never finaled, 12 expired or cancelled.
Of the 7 never-finaled permits, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 expired or cancelled. Typically 28 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2019 | Expired or cancelled cancelled Jan 2026 | 733 Front St | addition of an ada roll-in shower and reconfiguration of (e) commercial bathroom sinksDetails
addition of an ada roll-in shower and reconfiguration of (e) commercial bathroom sinks | $15,000 |
| May 18, 2012 | Completed final sign-off Jun 2013 | 417 Stockton St | remodel 19 hotel rooms including baths, janitors, storage on 1st fl, side door 1st floor.Details
remodel 19 hotel rooms including baths, janitors, storage on 1st fl, side door 1st floor. | $150,000 |
| Apr 19, 2012 | Completed final sign-off Sep 2012 | 1493 Webster St | ground floor t.i. for new medical office, work includes (n) partitoins, fixtures, flooring, ceilings, (n) bathrooms, (n) m.e.p., no change of occupancy, fire protection under separate permit. replace (e) storefront door & window in kind.Details
ground floor t.i. for new medical office, work includes (n) partitoins, fixtures, flooring, ceilings, (n) bathrooms, (n) m.e.p., no change of occupancy, fire protection under separate permit. replace (e) storefront door & window in kind. | $500,000 |
| Dec 6, 2011 | Completed final sign-off Apr 2012 | 417 Stockton St | expansion of (e) kitchen of restaurant on 2nd floor. work includes remodeled bathrooms, removal of raised seating area, new booth seating, partition walls & dropped ceiling. fire protection under seperate permitDetails
expansion of (e) kitchen of restaurant on 2nd floor. work includes remodeled bathrooms, removal of raised seating area, new booth seating, partition walls & dropped ceiling. fire protection under seperate permit | $115,000 |