Rdl Construction, Inc.
- Based in
- San Jose
- On San Francisco permits
- Aug 2019 to Aug 2026
- Last 24 months
- 12 permits filed
23 permits since 2000: 18 completed, 4 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Sep 2026 | 500 Beach St | ground floor- revision 202607024493- relocate of 2nd exit door, stair and alcove. structrual work includedDetails
ground floor- revision 202607024493- relocate of 2nd exit door, stair and alcove. structrual work included | |
| Jul 2, 2026 | In progress issued Jul 2026 | 500 Beach St | new demising wall, new entry door & glazing w/exterior canopy, new shared exit vestbulew/new stairs exisitng stairs, ramp and railing will be upgraded to full compliance, inlcuding structrual for new header at entry doors, ceiling ramp and stair w/landing. sprinkler deferred.Details
new demising wall, new entry door & glazing w/exterior canopy, new shared exit vestbulew/new stairs exisitng stairs, ramp and railing will be upgraded to full compliance, inlcuding structrual for new header at entry doors, ceiling ramp and stair w/landing. sprinkler deferred. | $190,000 |
| Dec 15, 2025 | In progress issued May 2026 | 500 Beach St | garage (east) building l1 & l2 (n) storefronts, finishes, & lighting. (n) led art displays.Details
garage (east) building l1 & l2 (n) storefronts, finishes, & lighting. (n) led art displays. | $1,100,000 |
| Dec 15, 2025 | In progress issued May 2026 | 2800 Leavenworth St | building 1 & 2 (west) building l1 & l2. (n) storefronts, finishes, lighting, & led art displays.Details
building 1 & 2 (west) building l1 & l2. (n) storefronts, finishes, lighting, & led art displays. | $1,100,000 |
| Dec 4, 2025 | Completed final sign-off May 2026 | 2800 Leavenworth St | level 1: revision to pa#202409201298. updated suite 5 storefront.Details
level 1: revision to pa#202409201298. updated suite 5 storefront. | |
| Jul 2, 2025 | Completed final sign-off Mar 2026 | 417 Montgomery St | repair isolated concrete and limestone spalls. replace broken window glass. replace missing glazing putty.Details
repair isolated concrete and limestone spalls. replace broken window glass. replace missing glazing putty. | $40,000 |
| Jun 18, 2025 | Completed final sign-off Sep 2025 | 445 Bush St | unit #2 fl 2: remove roll up doorDetails
unit #2 fl 2: remove roll up door | $1,250 |
| May 30, 2025 | Completed final sign-off May 2026 | 500 Beach St | revision to pa#202409201299: updated floor plans, elevations, misc. details.Details
revision to pa#202409201299: updated floor plans, elevations, misc. details. | |
| May 30, 2025 | Completed final sign-off May 2026 | 2800 Leavenworth St | revision to pa# 202409201298: updated floor plans, elevations, and misc. details.Details
revision to pa# 202409201298: updated floor plans, elevations, and misc. details. | |
| Feb 18, 2025 | Completed final sign-off May 2026 | 580 Beach St | deferred submittal to pa 202409201298 lighting & electrical drawings.Details
deferred submittal to pa 202409201298 lighting & electrical drawings. | |
| Feb 18, 2025 | Completed final sign-off May 2026 | 500 Beach St | deferred submittal to pa 202409201297 lighting & electrical drawings. review by intake required due to the proposed modifications to multiple switchboards.Details
deferred submittal to pa 202409201297 lighting & electrical drawings. review by intake required due to the proposed modifications to multiple switchboards. | |
| Jan 30, 2025 | Completed final sign-off Feb 2025 | 445 Bush St | intstall 3 (n) pre-manufactured phone boothsDetails
intstall 3 (n) pre-manufactured phone booths | $7,000 |
| Sep 20, 2024 | Completed final sign-off May 2026 | 580 Beach St | building 1 and 2 (west) building. selective store front replacment , art displays, lighting, cosmetic repairs, railing repairs and upgrade. sharing plans with 500 beach stDetails
building 1 and 2 (west) building. selective store front replacment , art displays, lighting, cosmetic repairs, railing repairs and upgrade. sharing plans with 500 beach st | $1,700,000 |
| Sep 20, 2024 | Completed final sign-off May 2026 | 500 Beach St | garage (east) building. selective store front replacment , art displays, lighting, cosmetic repairs. sharing plans with 580 beach stDetails
garage (east) building. selective store front replacment , art displays, lighting, cosmetic repairs. sharing plans with 580 beach st | $1,700,000 |
| May 29, 2024 | Completed final sign-off Jul 2024 | 500 Montgomery St | bringing a partial height wall to full height up to deck to demise the mezzanine from ground fl tenant space. minimal restroom upgrade, patch & repair finishes. e) use of suite is design professional will remain the same. relocate partition @ groumd fl restroom x 2. no plumbing fixture increaseDetails
bringing a partial height wall to full height up to deck to demise the mezzanine from ground fl tenant space. minimal restroom upgrade, patch & repair finishes. e) use of suite is design professional will remain the same. relocate partition @ groumd fl restroom x 2. no plumbing fixture increase | $27,250 |
| Mar 14, 2023 | Completed final sign-off Mar 2023 | 500 Montgomery St | revision to permit 202206096011. to remove deferred submittals scope from cover page. no fire alarm/sprinkler work. existing sprinkler and fire alarm to remain.Details
revision to permit 202206096011. to remove deferred submittals scope from cover page. no fire alarm/sprinkler work. existing sprinkler and fire alarm to remain. | |
| Jan 27, 2023 | Never finaled issued Feb 2023, no final | 417 Montgomery St | disconnect & remove the (e) ac units per plan; furnish & install 2 new 15 ton air cooled unit on 4th & 5th fl; furnish & install 2 new 15 ton water cooled units on 7th & 8th fl; reconnect the (e) water lines the (e) electrical and condensate pipeDetails
disconnect & remove the (e) ac units per plan; furnish & install 2 new 15 ton air cooled unit on 4th & 5th fl; furnish & install 2 new 15 ton water cooled units on 7th & 8th fl; reconnect the (e) water lines the (e) electrical and condensate pipe | $192,000 |
| Jun 9, 2022 | Completed final sign-off Mar 2023 | 500 Montgomery St | construction non load bearing walls to create new office.move extg light fixtures and split units over, to fit new space, add some duct work and new glass wall panels.Details
construction non load bearing walls to create new office.move extg light fixtures and split units over, to fit new space, add some duct work and new glass wall panels. | $146,750 |
| May 10, 2022 | Completed final sign-off May 2023 | 417 Montgomery St | disconnect and remove the (e) ac unit. furnish and install (1) new 20-ton rooftop ac-unit. disconnect and remove (3) (e) cooling tower. furnish and install (3) three cooling tower like for like.Details
disconnect and remove the (e) ac unit. furnish and install (1) new 20-ton rooftop ac-unit. disconnect and remove (3) (e) cooling tower. furnish and install (3) three cooling tower like for like. | $258,147 |
| Nov 18, 2019 | Completed final sign-off Oct 2020 | 150 Mississippi St | phase 2: remove (e) interior improvements. contruct (n) interior improvements in industrial space with associated support functions including open office, breakroom (non cooking), restrooms, testing & assembly. extension of mezzanine floor. (phase 1 - ref pa #201909242541)Details
phase 2: remove (e) interior improvements. contruct (n) interior improvements in industrial space with associated support functions including open office, breakroom (non cooking), restrooms, testing & assembly. extension of mezzanine floor. (phase 1 - ref pa #201909242541) | $1,000,000 |
| Sep 26, 2019 | Completed final sign-off Oct 2019 | 750 24th St | revision to pa 2019-0822-9616 - adding striping on the ground for purpose of egress per inspector's commentDetails
revision to pa 2019-0822-9616 - adding striping on the ground for purpose of egress per inspector's comment | |
| Sep 24, 2019 | Completed final sign-off Oct 2020 | 150 Mississippi St | change of occupancy to metal & wood work manufacturing. remove (e)interior construct new improvements in office & industrial space with assocciated support functions including open office, testing & assembly, warehouse and other support functions. replace (e) stair w/ deferred permit.Details
change of occupancy to metal & wood work manufacturing. remove (e)interior construct new improvements in office & industrial space with assocciated support functions including open office, testing & assembly, warehouse and other support functions. replace (e) stair w/ deferred permit. | $150,000 |
| Aug 22, 2019 | Completed final sign-off Oct 2019 | 750 24th St | removal of interior non structural walls, upgrade (e) restroom to be accessible, upgreade (e) interior ramp to be accessibleDetails
removal of interior non structural walls, upgrade (e) restroom to be accessible, upgreade (e) interior ramp to be accessible | $50,000 |